Article 10 Highway worksI1
England, Wales and Scotland
The undertaker may for the purposes of the carrying out of the highway works, enter on so much of any of the streets specified in Schedule 3 (streets subject to highway works) as is within the Order limits and may—
break up or open the street, or any sewer, drain or tunnel under it;
tunnel or bore under the street;
place apparatus in the street;
maintain apparatus in the street or change its position;
construct bridges and tunnels;
increase the width of the carriageway of the street by reducing the width of any kerb, footpath, footway, cycle track or verge within the street;
alter the level or increase the width of such kerb, footway, cycle track or verge;
reduce the width of the carriageway of the street;
make and maintain crossovers and passing places; and
execute any works required for or incidental to any works referred to in sub-paragraphs (a) to (i).
The highway works must be carried out in accordance with the relevant provisions of Schedules 19 and 20 (protection of interests).