Paragraph 1 Descriptions of developmentF1
The carrying out of development to provide any of the following—
nuclear generating station or other nuclear reactors (except research installation for the production and conversion of fissionable and fertile materials, whose maximum power does not exceed 1 kilowatt continuous thermal load);
thermal generating station with a heat output of 300 megawatts or more; F2or
construction of overhead electrical power lines with a voltage of 220 kilovolts or more and a length of more than 15 F3kilometres.
Annotations
Textual amendments
- F1
Words in sch. 1 substituted (18.12.2017) by The Electricity Works (Environmental Impact Assessment) (Scotland) Amendment Regulations 2017 (S.S.I. 2017/451), regs. 1, 2(5)(a)
- F2
Word in sch. 1 inserted (18.12.2017) by The Electricity Works (Environmental Impact Assessment) (Scotland) Amendment Regulations 2017 (S.S.I. 2017/451), regs. 1, 2(5)(b)
- F3
Word in sch. 1 substituted (18.12.2017) by The Electricity Works (Environmental Impact Assessment) (Scotland) Amendment Regulations 2017 (S.S.I. 2017/451), regs. 1, 2(5)(c)