Regulation 19 Requirements which must be satisfied before an importer places a product on the marketI1
England, Wales and Scotland
Before placing a product on the market, an importer must ensure that—
a relevant conformity assessment procedure has been carried out by the manufacturer,
the manufacturer has drawn up the technical documentation,
In paragraph (1)(c)(iii), “required documents” means any documents that are required to be provided with a product pursuant to—
regulation 11(2) (labelling and packaging of products);
regulation 13(2)(b) (information identifying manufacturer);
regulation F314 (provision of instructions and safety information).
Annotations
Textual amendments
- F1
Word in reg. 19(1)(c)(i) substituted (31.12.2020) by The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 25 para. 13(a) (with Sch. 25 para. 34) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)
- F2
Word in reg. 19(1)(c)(ii) omitted (31.12.2020) by virtue of The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 25 para. 13(b) (with Sch. 25 para. 34) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)
- F3
Words in reg. 19(2)(c) substituted (31.12.2020) by The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 25 para. 13(c) (with Sch. 25 para. 34) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)
Commencement
- I1
Reg. 19 in force at 8.12.2016, see reg. 1(1)