The Equipment and Protective Systems Intended for Use in Potentially Explosive Atmospheres Regulations 2016
S.I. 2016/1107 · Made 15 November 2016 · Extends to England, Wales and Scotland
Health And Safety
Made 15th November 2016
Laid before Parliament 16th November 2016
Coming into force 8th December 2016
These Regulations make provision for a purpose mentioned in section 2(2) of the European Communities Act 1972 and it appears to the Secretary of State that it is expedient for certain references to provisions of EU instruments to be construed as references to those provisions as amended from time to time.C1
The Secretary of State makes these Regulations in exercise of the powers conferred by section 2(2) of, and paragraph 1Af3 of Schedule 2 to, the European Communities Act 1972:
Annotations to the whole text
Modifications
- C1
Regulations modified (19.6.2021) by The Conformity Assessment (Mutual Recognition Agreements) and Weights and Measures (Intoxicating Liquor) (Amendment) Regulations 2021 (S.I. 2021/730), regs. 1, 4, Sch. 1 para. 6
Footnotes
- f1
- f2
-
1972 c.68; section 2(2) was amended by the Legislative and Regulatory Reform Act 2006 (c.51), section 27(1) and the European Union (Amendment) Act 2008 (c.7), Schedule, Part 1.
- f3
-
Paragraph 1A of Schedule 2 was inserted by section 28 of the Legislative and Regulatory Reform Act 2006 and amended by the European Union (Amendment) Act 2008, Schedule, Part 1.
Contents
- Part 1: Preliminary
- 1Citation, commencement and extent
- 2Interpretation
- 2ADesignated standard
- 3Scope
- 4Exceptions for trade fairs, exhibitions and demonstrations
- Part 2: Obligations of economic operators
- Chapter 1: Manufacturers
- 5Design and manufacture in accordance with essential health and safety requirements
- 6Technical documentation and conformity assessment
- 7Declaration of conformity and UK marking
- 8Retention of technical documentation and ... declaration of conformity
- 9Compliance procedures for series production
- 10Monitoring
- 11Labelling and packaging of products
- 12Labelling and packaging of products, other than components
- 13Information identifying manufacturer
- 14Provision of instructions and safety information
- 15Duty to take action in respect of a product placed on the market which is considered not to be in conformity
- 16Provision of information and cooperation
- 17Authorised representatives
- Chapter 2: Importers
- 18Prohibition on placing on the market products which are not in conformity
- 19Requirements which must be satisfied before an importer places a product on the market
- 20Prohibition on placing on the market products considered not to be in conformity with the essential health and safety requirements
- 21Information identifying importer
- 22Provision of Instructions and safety information
- 23Storage and transport
- 24Monitoring
- 25Duty to take action in respect of a product placed on the market which is considered not to be in conformity
- 26Provision of information and cooperation
- 27Retention of technical documentation and ... declaration of conformity
- Chapter 3: Distributors
- 28Duty to act with due care
- 29Requirements which must be satisfied before a distributor makes a product available on the market
- 30Storage and transport
- 31Prohibition on making available on the market where product not considered to be in conformity with safety objectives
- 32Duty to take action in respect of products made available on the market which are not in conformity
- 33Provision of information and cooperation
- Chapter 4: Importers and distributors
- 34Cases in which obligations of manufacturers apply to importers and distributors
- Chapter 5: All economic operators
- 35Identification of economic operators
- 36Prohibition on improper use of UK marking
- 36AObligations which are met by complying with obligations in the ATEX Directive
- 36BConformity assessment procedure obligation which is met by complying with the ATEX Directive
- 36CFurther Use of UK marking
- 36DQualifying Northern Ireland Goods
- 37Translation of declaration of conformity Repealed
- Part 3: Conformity assessment
- 38Presumption of conformity
- 39Conformity assessment procedures
- 40... Declaration of conformity
- 41UK Marking
- Part 4: Approval of Conformity Assessment Bodies
- 42Approved bodies
- 43Approval of conformity assessment bodies
- 44Presumption of conformity of approved bodies
- 45Monitoring
- 46Restriction, suspension or withdrawal of approval
- 47Operational matters in relation to approved bodies
- 48Subsidiaries and contractors
- 49Register of approved bodies
- 50UK national accreditation body
- Part 5: Market surveillance and enforcement
- 51Designation of market surveillance authority
- 52Enforcement
- 53Enforcement powers
- 54Exercise of enforcement powers
- 55Evaluation of a product presenting a risk
- 56Enforcement action in respect of products which are not in conformity and which present a risk
- 57EU safeguard procedure Repealed
- 58Enforcement action in respect of products which are in conformity, but present a risk
- 59Enforcement action in respect of formal non-compliance
- 60Restrictive measures
- 61Offences
- 62Penalties
- 63Defence of due diligence
- 64Liability of persons other than principal offender
- 65Time limit for prosecution of offences
- 66Service of documents
- 67Recovery of expenses of enforcement
- 68Action by the market surveillance authority
- 69Appeals against notices
- 70Appropriate court for appeals against notices
- Part 6: Miscellaneous
- 71Review
- 72Transitional provisions
- 72ATransitional provision in relation to EU Exit
- 73Revocations and savings
- 74Consequential Amendments
- Signature
- Schedule 1: Essential Health and Safety Requirements
- ESSENTIAL HEALTH AND SAFETY REQUIREMENTS RELATING TO THE DESIGN AND CONSTRUCTION OF EQUIPMENT AND PROTECTIVE SYSTEMS INTENDED FOR USE IN POTENTIALLY EXPLOSIVE ATMOSPHERES (Annex II of the ATEX Directive)
- 1Preliminary observations
- COMMON REQUIREMENTS FOR EQUIPMENT AND PROTECTIVE SYSTEMS
- General requirements
- 2Principles of integrated explosion safety
- 3Special checking and maintenance conditions
- 4Surrounding area conditions
- 5Marking
- 6Instructions
- 7Selection of materials
- 8Design and construction
- 9Enclosed structures and prevention of leaks
- 10Dust deposits
- 11Additional means of protection
- 12Safe opening
- 13Protection against other hazards
- 14Overloading of equipment
- 15Flameproof enclosure systems
- POTENTIAL IGNITION SOURCES
- 16Hazards arising from different ignition sources
- 17Hazards arising from static electricity
- 18Hazards arising from stray electric and leakage currents
- 19Hazards arising from overheating
- 20Hazards arising from pressure compensation operations
- 21Hazards arising from external effects
- 22Requirements in respect of safety-related devices
- 23Control and display units
- 24Requirements in respect of devices with a measuring function for explosion protection
- 25Risks arising from software
- 26Integration of safety requirements relating to the system
- 27Hazards arising from power failure
- 28Hazards arising from connections
- 29Placing of warning devices as parts of equipment
- SUPPLEMENTARY REQUIREMENTS IN RESPECT OF EQUIPMENT
- Requirements applicable to equipment in equipment - group I
- 30Requirements applicable to equipment in category M 1 of equipment-group I
- 31Requirements applicable to equipment in category M 2 of equipment-group I
- Requirements applicable to equipment in category 1 of equipment - group II
- 32Explosive atmospheres caused by gases, vapours or mists
- 33Explosive atmospheres caused by air and dust mixtures
- Requirements applicable to equipment category 2 of equipment - group II
- 34Explosive atmospheres caused by gases, vapours or mists
- 35Explosive atmospheres caused by air and dust mixtures
- Requirements applicable to equipment category 3 of equipment – groupII
- 36Explosive atmospheres caused by gases, vapours or mists
- 37Explosive atmospheres caused by air and dust mixtures
- Supplementary requirements in respect of protective systems
- 38General requirements
- Planning and design
- 39Characteristics of materials
- 40Pressure-relief systems
- 41Explosion suppression systems
- 42Explosion decoupling systems
- 43Explosion decoupling systems
- Schedule 1A: Criteria determining the classification of equipment-groups into categories (Annex I to the ATEX Directive)
- 1Paragraph 1
- 2Paragraph 2
- Schedule 2: Approved body requirements
- 1Paragraph 1
- 2Paragraph 2
- 3Paragraph 3
- 4Paragraph 4
- 5Paragraph 5
- 6Paragraph 6
- 7Paragraph 7
- 8Paragraph 8
- 9Paragraph 9
- 10Paragraph 10
- 11Paragraph 11
- 12Paragraph 12
- 13Paragraph 13
- 14Paragraph 14
- 15Paragraph 15
- 16Paragraph 16
- 17Paragraph 17
- 18Paragraph 18
- Schedule 3: Operational obligations of approved bodies
- 1Paragraph 1
- 2Paragraph 2
- 3Paragraph 3
- 4Paragraph 4
- 5Paragraph 5
- 6Paragraph 6
- 7Paragraph 7
- 8Paragraph 8
- 9Paragraph 9
- 10Paragraph 10
- 11Paragraph 11
- 12Paragraph 12
- 13Paragraph 13
- 14Paragraph 14
- Schedule 3A: Conformity Assessment Procedures (Annexes III to IX of the ATEX Directive)
- Part 1
- 1TYPE EXAMINATION
- 2Paragraph 2
- 3Paragraph 3
- 4Paragraph 4
- 4.1Paragraph 4.1
- 4.2Paragraph 4.2
- 4.3Paragraph 4.3
- 4.4Paragraph 4.4
- 5Paragraph 5
- 6Paragraph 6
- 7Paragraph 7
- 8Paragraph 8
- 9Paragraph 9
- 10Paragraph 10
- Part 2: CONFORMITY TO TYPE BASED ON QUALITY ASSURANCE OF THE PRODUCTION PROCESS
- 1Paragraph 1
- 2Manufacturing
- 3Quality system Repealed
- 3.1Paragraph 3.1
- 3.2Paragraph 3.2
- 3.3Paragraph 3.3
- 3.4Paragraph 3.4
- 3.5Paragraph 3.5
- 4Surveillance under the responsibility of the approved body Repealed
- 4.1Paragraph 4.1
- 4.2Paragraph 4.2
- 4.3Paragraph 4.3
- 4.4Paragraph 4.4
- 5UK marking, declaration of conformity and attestation of conformity Repealed
- 5.1Paragraph 5.1
- 5.2Paragraph 5.2
- 5.3Paragraph 5.3
- 6Paragraph 6
- 7Paragraph 7
- 8Authorised representative
- Part 3: CONFORMITY TO TYPE BASED ON PRODUCT VERIFICATION
- 1Paragraph 1
- 2Manufacturing
- 3Verification
- 4Verification of conformity by examination and testing of every product Repealed
- 4.1Paragraph 4.1
- 4.2Paragraph 4.2
- 5UK marking, declaration of conformity and attestation of conformity Repealed
- 5.1Paragraph 5.1
- 5.2Paragraph 5.2
- 5.3Paragraph 5.3
- 6Paragraph 6
- 7Authorised representative
- Part 4: CONFORMITY TO TYPE BASED ON INTERNAL PRODUCTION CONTROL PLUS SUPERVISED PRODUCT TESTING
- 1Paragraph 1
- 2Manufacturing
- 3Product checks
- 4UK marking, declaration of conformity and attestation of conformity Repealed
- 4.1Paragraph 4.1
- 4.2Paragraph 4.2
- 4.3Paragraph 4.3
- 5Authorised representative
- Part 5: CONFORMITY TO TYPE BASED ON PRODUCT QUALITY ASSURANCE
- 1Paragraph 1
- 2Manufacturing
- 3Quality System Repealed
- 3.1Paragraph 3.1
- 3.2Paragraph 3.2
- 3.3Paragraph 3.3
- 3.4Paragraph 3.4
- 3.5Paragraph 3.5
- 4Surveillance under the responsibility of the approved body Repealed
- 4.1Paragraph 4.1
- 4.2Paragraph 4.2
- 4.3Paragraph 4.3
- 4.4Paragraph 4.4
- 5UK marking, declaration of conformity and attestation of conformity Repealed
- 5.1Paragraph 5.1
- 5.2Paragraph 5.2
- 5.3Paragraph 5.3
- 6Paragraph 6
- 7Paragraph 7
- 8Authorised representative
- Part 6: INTERNAL PRODUCTION CONTROL
- 1Paragraph 1
- 2Technical documentation
- 3Manufacturing
- 4UK marking, declaration of conformity and attestation of conformity Repealed
- 4.1Paragraph 4.1
- 4.2Paragraph 4.2
- 4.3Paragraph 4.3
- 5Authorised representative
- Part 7: CONFORMITY BASED ON UNIT VERIFICATION
- 1Paragraph 1
- 2Technical documentation Repealed
- 2.1Paragraph 2.1
- 2.2Paragraph 2.2
- 3Manufacturing
- 4Verification
- 5UK marking, declaration of conformity and attestation of conformity Repealed
- 5.1Paragraph 5.1
- 5.2Paragraph 5.2
- 5.3Paragraph 5.3
- 6Authorised representative
- Schedule 4: Enforcement powers of the Health and Safety Executive and the Office for Nuclear Regulation under the 1974 Act
- 1Enforcement powers under the 1974
- 2Modifications to the 1974 Act
- Schedule 5: Compliance, withdrawal and recall notices
- 1Compliance notice
- 2Withdrawal notice
- 3Recall notice
- 4Interpretation
- Schedule 6: ... Declaration of Conformity (No. XXXX)
- 1Paragraph 1
- 2Paragraph 2
- 3Paragraph 3
- 4Paragraph 4
- 5Paragraph 5
- 6Paragraph 6
- 7Paragraph 7
- 8Paragraph 8
- Explanatory note