Paragraph 14 I1
England, Wales and Scotland
F1An approved body must—
acknowledge receipt of the technical documentation provided by the manufacturer in accordance with regulation 39(1)(b)(ii)(bb) (conformity assessment procedures) as soon as possible; and
retain the technical documentation referred to in sub-paragraph (a).
Annotations
Textual amendments
- F1
Words in Sch. 3 substituted (31.12.2020) by The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 25 para. 39(c) (with Sch. 25 para. 34) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)
Commencement
- I1
Sch. 3 para. 14 in force at 8.12.2016, see reg. 1(1)
Notes on Schedule 3
Textual amendments
- F1
Word in Sch. 3 heading substituted (31.12.2020) by The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 25 para. 39(b) (with Sch. 25 para. 34) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)
- F2
Words in Sch. 3 substituted (31.12.2020) by The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 25 para. 39(a) (with Sch. 25 para. 34) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)