OpenLegislation

Division 4.3.2 Performance of the overhead contact lineF1

United Kingdom Repealed

Original text. Later amendments are not shown.

  1. 4.3.2.1General
  2. 4.3.2.2Safety, earthing and bonding
  3. 4.3.2.3Requirements for dynamic behaviour and quality of current collection
  4. 4.3.2.4Protection against electric shock
  5. 4.3.2.5Static and mean aerodynamic contact force
  6. 4.3.2.6Maintenance plan

Annotations

Textual amendments

F1

Repealed by Commission Decision of 6 March 2008 concerning a technical specification for interoperability relating to the ‘energy’ sub-system of the trans-European high-speed rail system (notified under document number C(2008) 807) (Text with EEA relevance) (2008/284/CE).