Division 7.3.3 Maximum pressure variations in tunnels (Section 4.1.13)
United Kingdom
To take account of the numerous tunnels with a cross-section of 54 m2 which are traversed at 250 km/h, and those with a cross-section of 82,5 m2 and traversed at 300 km/h, Interoperable trainsets operating on the Italian network shall conform to the following envelope curve:
-
ΔP0 < or = 1 600 Pa,
-
ΔP1 < or = 3 000 Pa,
-
ΔP1 - 0,8ΔP0 < or = ΔP2.
These values are given by:
-
a ratio between the train and tunnel cross-sections of 0,18,
-
a service speed of 250 km/h,
If a trainset does not fulfil the values specified above, the operation rules for this train shall be determined by applying the published rules of the infrastructure manager.