Appendix ANNEX H Minimum elements relevant to professional competence for the task of driving a trainF1
United Kingdom Repealed
1.
GENERAL REQUIREMENTS
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.
PROFESSIONAL KNOWLEDGE
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.1.
General professional knowledge
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.2.
Knowledge of operational procedures and safety systems applied to the infrastructure to be used
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.3.
Knowledge of rolling stock
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.
ROUTE KNOWLEDGE
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.
ABILITY TO PUT THE KNOWLEDGE INTO PRACTISE
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.1.
Prepare for duty
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.2.
Prior to departure, perform the required tests, checks and verifications on the traction unit
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.3.
Take part in checking the operation of the brakes on the train
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.4.
Drive the train respecting the appropriate safety regulations, driving rules and timetable
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.5.
Act and report in accordance with the applicable rules in case of irregularities or defects either of lineside installations or rolling stock
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.6.
Apply measures relating to operational incidents and accidents, particularly those relating to train protection and to fire or dangerous goods
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.7.
Determine the conditions to continue to run after incidents affecting the rolling stock
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.8.
Park the train and, once stationary, take all required measures to ensure the train remains stationary
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.9.
Communicate with the Infrastructure Manager’s staff on the ground
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.10.
Report any unusual occurrences concerning the operation of the train, the conditions of the infrastructure etc.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .