OpenLegislation

Commission Decision of 22 July 2009 amending Decision 2006/679/EC as regards the implementation of the technical specification for interoperability relating to the control-command and signalling subsystem of the trans-European conventional rail system (notified under document number C(2009) 5607) (Text with EEA relevance) (2009/561/EC) (repealed)

EU Decision 2009/561 · Adopted 22 July 2009 · Extends to United Kingdom

Original text. legislation.gov.uk does not revise this item, so later amendments are not shown here. Changes made to it are listed under each provision when known.

Commission Decision

of 22 July 2009

amending Decision 2006/679/EC as regards the implementation of the technical specification for interoperability relating to the control-command and signalling subsystem of the trans-European conventional rail system

(notified under document number C(2009) 5607)

(Text with EEA relevance)

(2009/561/EC) (repealed)

F1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Annotations to the whole text

Textual amendments

F1

Repealed by 2012/88/EU: Commission Decision of 25 January 2012 on the technical specification for interoperability relating to the control-command and signalling subsystems of the trans-European rail system (notified under document C(2012) 172) Text with EEA relevance.

Contents

  1. 1Article 1 Repealed
  2. 2Article 2 Repealed
  3. 3Article 3 Repealed
  4. 4Article 4 Repealed
  5. Signature
  6. Annex Annex Repealed
  7. Ispecific lines constituting the corridors Repealed
  8. IIAppendix II Repealed

1F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

2F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

3F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

4F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Signature

F1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Ispecific lines constituting the corridorsF1

Corridor A – to be equipped by 2015

Corridor B

Corridor C

Corridor D

Corridor E

Corridor F

IIF1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .