Commission Decision of 11 March 2010 excluding from European Union financing certain expenditure incurred by the Member States under the Guarantee Section of the European Agricultural Guidance and Guarantee Fund (EAGGF), under the European Agricultural Guarantee Fund (EAGF) and under the European Agricultural Fund for Rural Development (EAFRD) (notified under document C(2010) 1317) (Only the Bulgarian, Danish, Dutch, English, Estonian, Finnish, French, German, Greek, Hungarian, Italian, Polish, Portuguese, Slovak, Spanish and Swedish texts are authentic) (2010/152/EU)

EU Decision 2010/152 · Adopted 11 March 2010 · Extends to United Kingdom

Original text. legislation.gov.uk does not revise this item, so later amendments are not shown here. Changes made to it are listed under each provision when known.

Commission Decision

of 11 March 2010

excluding from European Union financing certain expenditure incurred by the Member States under the Guarantee Section of the European Agricultural Guidance and Guarantee Fund (EAGGF), under the European Agricultural Guarantee Fund (EAGF) and under the European Agricultural Fund for Rural Development (EAFRD)

(notified under document C(2010) 1317)

(Only the Bulgarian, Danish, Dutch, English, Estonian, Finnish, French, German, Greek, Hungarian, Italian, Polish, Portuguese, Slovak, Spanish and Swedish texts are authentic)

(2010/152/EU)

THE EUROPEAN COMMISSION,

Having regard to the Treaty on the Functioning of the European Union,

Having regard to Council Regulation (EC) No 1258/1999 of 17 May 1999 on the financing of the common agricultural policyf1, and in particular Article 7(4) thereof,

Having regard to Council Regulation (EC) No 1290/2005 of 21 June 2005 on the financing of the common agricultural policyf2, and in particular Article 31 thereof,

Having consulted the Committee on the Agricultural Funds,

Whereas:

(1)

Under Article 7(4) of Regulation (EC) No 1258/1999, and Article 31 of Regulation (EC) No 1290/2005, the Commission is to carry out the necessary verifications, communicate to the Member States the results of these verifications, take note of the comments of the Member States, initiate a bilateral discussion so that an agreement may be reached with the Member States in question, and formally communicate its conclusions to them.

(2)

The Member States have had an opportunity to request the launch of a conciliation procedure. That opportunity has been used in some cases and the reports issued on the outcome have been examined by the Commission.

(3)

Under Regulation (EC) No 1258/1999 and Regulation (EC) No 1290/2005, only agricultural expenditure which has been incurred in a way that has not infringed European Union rules may be financed.

(4)

In the light of the verifications carried out, the outcome of the bilateral discussions and the conciliation procedures, part of the expenditure declared by the Member States does not fulfil this requirement and cannot, therefore, be financed under the EAGGF Guarantee Section, the European Agricultural Guarantee Fund, hereinafter referred to as EAGF, and under the European Agricultural Fund for Rural Development, hereinafter referred to as EAFRD.

(5)

The amounts that are not recognised as being chargeable to the EAGGF Guarantee Section, the EAGF and the EAFRD should be indicated. Those amounts do not relate to expenditure incurred more than 24 months before the Commission’s written notification of the results of the verifications to the Member States.

(6)

As regards the cases covered by this Decision, the assessment of the amounts to be excluded on grounds of non-compliance with European Union rules was notified by the Commission to the Member States in a summary report on the subject.

(7)

This Decision is without prejudice to any financial conclusions that the Commission may draw from the judgments of the Court of Justice in cases pending on 30 September 2009 and relating to its content,

HAS ADOPTED THIS DECISION:

Annotations to the whole text

Footnotes

f1

OJ L 160, 26.6.1999, p. 103.

f2

OJ L 209, 11.8.2005, p. 1.

Contents

  1. 1Article 1
  2. 2Article 2
  3. Annex Annex

1

The expenditure itemised in the Annex hereto that has been incurred by the Member States’ accredited paying agencies and declared under the EAGGF Guarantee Section, under the EAGF or under the EAFRD shall be excluded from European Union financing because it does not comply with European Union rules.

2

This Decision is addressed to the Kingdom of Belgium, the Republic of Bulgaria, the Kingdom of Denmark, the Federal Republic of Germany, the Republic of Estonia, Ireland, the Hellenic Republic, the Kingdom of Spain, the French Republic, the Italian Republic, the Republic of Cyprus, the Grand Duchy of Luxembourg, the Republic of Hungary, the Kingdom of the Netherlands, the Republic of Poland, the Portuguese Republic, the Slovak Republic, the Republic of Finland, the Kingdom of Sweden and the United Kingdom of Great Britain and Northern Ireland.

BUDGET ITEM 6701

MSMeasureFYReason for correctionType%CurrencyAmountDeductions already madeFinancial impact
BEFinancial audit — Overshooting2008Overshooting of financial ceilingsone-offEUR–593,3–593,30,0
Total BE–593,3–593,30,0
BGFinancial audit — payment deadlines2008Non-respect of payment deadlinesone-offEUR–10 969,94–10 969,940,0
Total BG–10 969,94–10 969,940,0
CYDirect Payments2005Law quality and incorrect timing of on-the-spot checks, deficiencies in GAEC criteria controls Weak general control environmentflat-rate10,0EUR–756 946,490,0–756 946,49
Total CY–756 946,490,0–756 946,49
DEDirect Payments2006Wrong application of reductions and exclusionsone-offEUR–6 712 699,140,0–6 712 699,14
DEFinancial audit — payment deadlines2008Non-respect of payment deadlinesone-offEUR–37 390,29–37 390,290,0
Total DE–6 750 089,43–37 390,29–6 712 699,14
DKCross Compliance2006Insufficient quantity and quality of key and ancillary controlsflat-rate5,0DKK–10 302 438,990,0–10 302 438,99
DKCross Compliance2006Insufficient quantity and quality of key and ancillary controlsone-offDKK–495 596,610,0–495 596,61
DKCross Compliance2007Compensation following adjustments made by the MS in annual declarationsDKK16 823,860,016 823,86
DKCross Compliance2007Insufficient quantity and quality of key and ancillary controlsflat-rate5,0EUR–2 912 878,810,0–2 912 878,81
DKMeat Premiums — Bovines2003Insufficient quantity of on-the-spot checksflat-rate2,0DKK–8 883 403,830,0–8 883 403,83
DKMeat Premiums — Bovines2005Insufficient quantity of on-the-spot checksflat-rate2,0DKK–40 706,280,0–40 706,28
DKMeat Premiums — Bovines2005Non-respect of definition of suckler cowone-offEUR–229 600,00,0–229 600,0
DKMeat Premiums — Bovines2004Insufficient quantity of on-the-spot checksflat-rate2,0DKK–7 410,470,0–7 410,47
DKMeat Premiums — Bovines2004Compensation following adjustments made by the MS in annual declarationsEUR1 363,550,01 363,55
DKMeat Premiums — Bovines2004Non-respect of definition of suckler cowone-offEUR–164 800,00,0–164 800,0
DKMeat Premiums — Bovines2005Compensation following adjustments made by the MS in annual declarationsEUR2 519,930,02 519,93
DKMeat Premiums — Bovines2006Compensation following adjustments made by the MS in annual declarationsDKK9 238,20,09 238,2
Total DK (EUR)–3 303 395,330,0–3 303 395,33
Total DK (DKK)–19 703 494,120,0–19 703 494,12
EEFinancial audit — Overshooting2008Overshooting of financial ceilingsone-offEUR–30 242,24–30 242,240,0
Total EE–30 242,24–30 242,240,0
ESClearance of accounts2004Unrecoverable debtone-offEUR–12 466,390,0–12 466,39
ESCross Compliance2006Lack of on-the-spot checksflat-rate10,0EUR–2 226 313,510,0–2 226 313,51
ESCross Compliance2007Lack of on-the-spot checksflat-rate10,0EUR–18 615,650,0–18 615,65
ESFinancial audit — payment deadlines2008Non-respect of payment deadlinesone-offEUR–3 919 231,56–4 103 814,39184 582,83
ESFinancial audit — Overshooting2008Ineligible expenditure, milk levy and failure to repay amounts due to cross-complianceone-offEUR8 318,458 318,450,0
ESFinancial audit — Overshooting2008Overshooting of financial ceilingsone-offEUR–823 800,98–823 800,980,0
ESFruit and Vegetables — Operational Programmes2004Ineligible cost of environmental management of packagingone-offEUR–3 929 919,020,0–3 929 919,02
ESFruit and Vegetables — Operational Programmes2005Ineligible cost of environmental management of packagingone-offEUR–14 719 270,210,0–14 719 270,21
ESFruit and Vegetables — Operational Programmes2006Ineligible cost of environmental management of packagingone-offEUR–17 337 716,290,0–17 337 716,29
ESFruit and Vegetables — Producer Groups2003Ineligible cost of environmental management of packagingone-offEUR–1 243 226,690,0–1 243 226,69
ESFruit and Vegetables — Producer Groups2003Weaknesses in the key control (insufficient checks on double funding)flat-rate5,0EUR–2 130 607,740,0–2 130 607,74
ESFruit and Vegetables — Producer Groups2004Ineligible cost of environmental management of packagingone-offEUR–1 096 997,970,0–1 096 997,97
ESFruit and Vegetables — Producer Groups2004Weaknesses in the key control (insufficient checks on double funding)flat-rate5,0EUR–2 496 111,630,0–2 496 111,63
ESFruit and Vegetables — Producer Groups2005Weaknesses in the key control (insufficient checks on double funding)flat-rate5,0EUR–2 359 546,060,0–2 359 546,06
ESFruit and Vegetables — Producer Groups2006Weaknesses in the key control (insufficient checks on double funding)flat-rate5,0EUR–2 148 564,480,0–2 148 564,48
ESHemp — production aid1997Reimbursement following judgment of Court of Justice in the case T-259/05flat-rate10,0EUR112 677,490,0112 677,49
ESHemp — production aid1998Reimbursement following judgment of Court of Justice in the case T-259/05flat-rate10,0EUR290 132,360,0290 132,36
ESHemp — production aid1999Reimbursement following judgment of Court of Justice in the case T-259/05flat-rate10,0EUR220,240,0220,24
ESHemp — production aid1999Reimbursement following judgment of Court of Justice in the case T-259/05flat-rate25,0EUR3 135 672,080,03 135 672,08
ESHemp — production aid2000Reimbursement following judgment of Court of Justice in the case T-259/05flat-rate25,0EUR1 417 423,820,01 417 423,82
ESHemp — production aid2001Reimbursement following judgment of Court of Justice in the case T-259/05flat-rate25,0EUR331 466,050,0331 466,05
ESHemp — production aid2002Reimbursement following judgment of Court of Justice in the case T-259/05flat-rate25,0EUR–1 014,830,0–1 014,83
Total ES–49 167 492,52–4 919 296,92–44 248 195,6
FIFinancial audit — Overshooting2008Overshooting of financial ceilingsone-offEUR–2 432,42–2 432,420,0
Total FI–2 432,42–2 432,420,0
FRClearance of accounts2002Debts management: non-recovery of debtsone-offEUR–256 801,470,0–256 801,47
FRClearance of accounts2002Overshooting of ceilingsone-offEUR–464 310,980,0–464 310,98
FRClearance of accounts2004Most likely errorone-offEUR–178 075,490,0–178 075,49
FRClearance of accounts2005Debts management: non-recovery of debtsone-offEUR–66 012,510,0–66 012,51
FRClearance of accounts2005Systematic errorone-offEUR–62 342,030,0–62 342,03
FRDried Fodder2005Insufficient quantity of samples taken and low quality of their examinationflat-rate2,0EUR–680 596,080,0–680 596,08
FRDried Fodder2006Insufficient quantity of samples taken and low quality of their examinationflat-rate2,0EUR–1 514 646,790,0–1 514 646,79
FRDried Fodder2007Insufficient quantity of samples taken and low quality of their examinationflat-rate2,0EUR–849 968,480,0–849 968,48
FRFruit and Vegetables — Operational Programmes2006Ineligible cost of environmental management of packaging Personnel costs too high Insufficient justification for specific costs of certified plantsone-offEUR–205 654,660,0–205 654,66
FRFruit and Vegetables — Operational Programmes2007Ineligible cost of environmental management of packaging Personnel costs too high Insufficient justification for specific costs of certified plantsone-offEUR–4 402 146,530,0–4 402 146,53
FRFruit and Vegetables — Operational Programmes2008Ineligible cost of environmental management of packaging Personnel costs too high Insufficient justification for specific costs of certified plantsone-offEUR–2 250 805,130,0–2 250 805,13
FRMeat Premiums — Bovines2003Weaknes on the application of sanctions at national levelone-offEUR–2 175 736,00,0–2 175 736,0
FRMeat Premiums — Bovines2004Weaknes on the application of sanctions at national levelone-offEUR–1 586 850,00,0–1 586 850,0
FRMeat Premiums — Bovines2004Very weak control environment and absence of the suckler cow status of the herdflat-rate25,0EUR–1 825 745,070,0–1 825 745,07
FRMeat Premiums — Bovines2004Very weak control environmentflat-rate10,0EUR–161 858,240,0–161 858,24
FRMeat Premiums — Bovines2005Very weak control environment and absence of the suckler cow status of the herdflat-rate25,0EUR–1 835 682,640,0–1 835 682,64
FRMeat Premiums — Bovines2005Very weak control environmentflat-rate10,0EUR–171 143,00,0–171 143,0
FRMeat Premiums — Bovines2006Very weak control environmentflat-rate25,0EUR–8 361,560,0–8 361,56
FRMeat Premiums — Bovines2006Very weak control environmentflat-rate5,0EUR–86 986,20,0–86 986,2
FRMeat Premiums — Bovines2006Very weak control environmentflat-rate10,0EUR–722 979,520,0–722 979,52
Total FR–19 506 702,380,0–19 506 702,38
GBDirect Payments2006Incorrect application of reductions and exclusionsone-offGBP–8 122,330,0–8 122,33
GBDirect Payments2007Incorrect application of reductions and exclusionsone-offGBP–9 623,980,0–9 623,98
GBFinancial audit — payment deadlines2008Non-respect of payment deadlinesone-offEUR–14 180 950,72–14 311 495,63130 544,91
GBFinancial audit — Overshooting2008Overshooting of financial ceilingsone-offEUR–262 732,55–262 732,550,0
GBRural Development EAGGF Axis 22005Weaknesses in key checks and in adminitrative controls Insufficient checks of GAEC criteria and cross-checks with animal databaseflat-rate5,0GBP–36 364,00,0–36 364,0
GBRural Development EAGGF Axis 22006Weaknesses in key checks and in adminitrative controls Insufficient checks of GAEC criteria and cross-checks with animal databaseflat-rate5,0GBP–3 254 010,00,0–3 254 010,0
Total GB (GBP)–3 308 120,310,0–3 308 120,31
Total GB (EUR)–14 443 683,27–14 574 228,18130 544,91
GRFood Aid within the Community2005Ineligible costs resulting from late withdrawals and late distributionone-offEUR–1 310 306,020,0–1 310 306,02
GRFood Aid within the Community2006Ineligible costs resulting from late withdrawals and late distributionone-offEUR–6 799 511,680,0–6 799 511,68
GRFood Aid within the Community2007Ineligible costs of storage resulting from late withdrawalsone-offEUR–220 830,340,0–220 830,34
GRFruit and Vegetables — Operational Programmes2005Value of Marketed Production (VMP), used for calculating Community aid, wrongly establishedone-offEUR–38 933,40,0–38 933,4
GRFruit and Vegetables — Operational Programmes2006Value of Marketed Production (VMP), used for calculating Community aid, wrongly establishedone-offEUR–127 757,630,0–127 757,63
GRFruit and Vegetables — Operational Programmes2007Value of Marketed Production (VMP), used for calculating Community aid, wrongly establishedone-offEUR–148 714,80,0–148 714,8
GRCotton2004Weak control system. Deficiencies in the control of area and environmental measuresflat-rate5,0EUR–12 022,670,0–12 022,67
GRCotton2004Overshooting the production quantities permitted by the Regulationsone-offEUR–37 392,00,0–37 392,0
GRCotton2005Weak control system. Deficiencies in the control of area and environmental measuresflat-rate5,0EUR–34 573 887,480,0–34 573 887,48
GRCotton2005Overshooting the production quantities permitted by the Regulationsone-offEUR–1 284 276,00,0–1 284 276,0
GRCotton2006Weak control system. Deficiencies in the control of area and environmental measuresflat-rate5,0EUR–68 134 305,290,0–68 134 305,29
GRCotton2006Weak control system. Deficiencies in the control of area and environmental measuresone-offEUR–1 411 287,00,0–1 411 287,0
GROlive Oil — Consumption Aid1996Reimbursement following judgment of Court of Justice in the case T-243/05one-offEUR67 626,660,067 626,66
GROlive Oil — Consumption Aid1997Reimbursement following judgment of Court of Justice in the case T-243/05one-offEUR116 091,920,0116 091,92
GROlive Oil — Consumption Aid1998Reimbursement following judgment of Court of Justice in the case T-243/05one-offEUR16 428,10,016 428,1
GRRD Guarantee (area related measures)2005Persistent weaknesses in IACS system. Deficiencies in control reports. Delayed performance of on-the-spot checksflat-rate10,0EUR–8 498 907,00,0–8 498 907,0
GRRD Guarantee (area related measures)2006Persistent weaknesses in IACS system. Deficiencies in control reports. Delayed performance of on-the-spot checksflat-rate5,0EUR–349 453,00,0–349 453,0
GRRD Guarantee (area related measures)2006Persistent weaknesses in IACS system. Deficiencies in control reports. Delayed performance of on-the-spot checksflat-rate10,0EUR–6 168 408,00,0–6 168 408,0
GRRD Guarantee new measures2005Persistent weaknesses in IACS system. Deficiencies in control reports. Delayed performance of on-the-spot checksflat-rate10,0EUR–690 219,00,0–690 219,0
GRRD Guarantee new measures2006Persistent weaknesses in IACS system. Deficiencies in control reports. Delayed performance of on-the-spot checksflat-rate10,0EUR–2 816 729,00,0–2 816 729,0
Total GR–132 422 793,630,0–132 422 793,63
HURural Development Guarantee2005Reimbursement due to double correction (under Commission Decision 2009/721/EC and recovery order GFO.09.025 concerning TRDI program 2004HU06GDO001)one-offHUF42 638 662,00,042 638 662,0
Total HU42 638 662,00,042 638 662,0
IEDairy premium2005Non-application of aid reductions towards farmers lodging their aid applications after deadlineone-offEUR–367 181,290,0–367 181,29
IEFinancial audit — payment deadlines2008Non-respect of payment deadlinesone-offEUR–152 676,24–152 676,240,0
Total IE–519 857,53–152 676,24–367 181,29
ITFinancial audit — payment deadlines2008Ineligible expenditureone-offEUR–9 345,0–9 345,00,0
ITFinancial audit — payment deadlines2008Non-respect of payment deadlinesone-offEUR–1 877 812,65–1 877 812,650,0
ITFruit and Vegetables — Operational Programmes2007Ineligible expenditureEUR–18 750,00,0–18 750,0
Total IT–1 905 907,65–1 887 157,65–18 750,0
LUFinancial audit — Overshooting2008Overshooting of financial ceilingsone-offEUR–1 273,9–1 273,90,0
LUMeat Premiums — Bovines2001Lack of adminitrative controls concerning retention period. Lack of on-the-spot controls. Inappropriate calculation of sanctionsone-offEUR–18 292,470,0–18 292,47
LUMeat Premiums — Bovines2002Lack of adminitrative controls concerning retention period. Lack of on-the-spot controls. Inappropriate calculation of sanctionsone-offEUR–3 973,520,0–3 973,52
LUMeat Premiums — Bovines2003Lack of adminitrative controls concerning retention period. Lack of on-the-spot controls. Inappropriate calculation of sanctionsone-offEUR–150 184,70,0–150 184,7
LUMeat Premiums — Bovines2004Lack of adminitrative controls concerning retention period. Lack of on-the-spot controls. Inappropriate calculation of sanctionsone-offEUR–190 950,230,0–190 950,23
Total LU–364 674,82–1 273,9–363 400,92
NLClearance of accounts2000-04Tested population errorsone-offEUR–481 542,940,0–481 542,94
NLClearance of accounts2004Tested population errorsone-offEUR–46 697,810,0–46 697,81
NLClearance of accounts2005Tested population errorsone-offEUR–402 695,00,0–402 695,0
NLExport Refunds2003Insuficient number of sustitution checks performedflat-rate2,0EUR–4 037 899,760,0–4 037 899,76
NLExport Refunds2003Insuficient number of sustitution checks performedflat-rate5,0EUR–4 083 396,090,0–4 083 396,09
NLExport Refunds2004Insuficient number of sustitution checks performedflat-rate2,0EUR–1 062 605,20,0–1 062 605,2
NLExport Refunds2004Insuficient number of sustitution checks performedflat-rate5,0EUR–1 193 119,340,0–1 193 119,34
NLExport Refunds2005Insuficient number of sustitution checks performedflat-rate5,0EUR–31 195,10,0–31 195,1
NLFinancial audit — Overshooting2007Overshooting of financial ceilingsone-offEUR–914,70,0–914,7
NLFinancial audit — Overshooting2008Ineligible expenditureone-offEUR–91 807,12–91 807,120,0
NLMeat Premiums — Bovines2004Weaknesses in the management of the herd registers and of the supporting documentsflat-rate2,0EUR–3 214 925,840,0–3 214 925,84
NLMeat Premiums — Bovines2005Weaknesses in the management of the herd registers and of the supporting documentsflat-rate2,0EUR–3 559 908,740,0–3 559 908,74
NLMeat Premiums — Bovines2006Weaknesses in the management of the herd registers and of the supporting documentsflat-rate2,0EUR–19 171,10,0–19 171,1
Total NL–18 225 878,74–91 807,12–18 134 071,62
F1PL Direct payments 2006

Land parcel system not completely vectorised.

Acceptance of ineligible land for payments.

Too low number of on-the-spot checks in regions with high error rates. Erroneous application of provisions of intentional non-compliance.

One-off PLN – 87 534 475,32 0,0 – 87 534 475,32
PL Direct payments 2006

Land parcel system not completely vectorised.

Acceptance of ineligible land for payments.

Too low number of on-the-spot checks in regions with high error rates. Erroneous application of provisions of intentional non-compliance.

Flat rate 5,0 PLN – 11 811 934,21 0,0 – 11 811 934,21
PL Direct payments 2007

Land parcel system not completely vectorised.

Acceptance of ineligible land for payments.

Too low number of on-the-spot checks in regions with high error rates. Erroneous application of provisions of intentional non-compliance.

Flat rate 5,0 EUR – 2 293 418,87 0,0 – 2 293 418,87
PL Direct payments 2007

Land parcel system not completely vectorised.

Acceptance of ineligible land for payments.

Too low number of on-the-spot checks in regions with high error rates. Erroneous application of provisions of intentional non-compliance.

One-off EUR – 23 290 577,94 0,0 – 23 290 577,94
PL Financial audit — Overshooting 2008 Overshooting of financial ceilings One-off EUR 0,0 – 1 894 213,61 1 894 213,61
Total PL (PLN) – 99 346 409,53 0,0 – 99 346 409,53
Total PL (EUR) – 25 583 996,81 – 1 894 213,61 – 23 689 783,2
SECross Compliance2006Insufficient quantity and quality of key and ancillary controlsflat-rate5,0SEK–9 218 825,980,0–9 218 825,98
SECross Compliance2007Insufficient quantity and quality of key and ancillary controlsflat-rate5,0EUR–2 137 710,170,0–2 137 710,17
SEFinancial audit — payment deadlines2008Non-respect of payment deadlinesone-offEUR–35 584,38–35 584,380,0
SEFinancial audit — Overshooting2008Overshooting of financial ceilingsone-offEUR–44,84–44,840,0
Total SE (SEK)–9 218 825,980,0–9 218 825,98
Total SE (EUR)–2 173 339,39–35 629,22–2 137 710,17

BUDGET ITEM 6500

F2MS Measure FY Reason for correction Type % Currency Amount Deductions already made Financial impact
PL Rural Development EAGGF Transitional Instrument (2000-2006) 2005

Land parcel system not completely vectorised.

Acceptance of ineligible land for payments.

Too low number of on-the-spot checks in regions with high error rates. Erroneous application of provisions of intentional non-compliance.

Flat rate 5,0 PLN – 1 408 667,08 0,0 – 1 408 667,08
PL Rural Development EAGGF Transitional Instrument (2000-2006) 2006

Land parcel system not completely vectorised.

Acceptance of ineligible land for payments.

Too low number of on-the-spot checks in regions with high error rates. Erroneous application of provisions of intentional non-compliance.

One-off PLN – 18 510 167,85 0,0 – 18 510 167,85
PL Rural Development EAGGF Transitional Instrument (2000-2006) 2006

Land parcel system not completely vectorised.

Acceptance of ineligible land for payments.

Too low number of on-the-spot checks in regions with high error rates. Erroneous application of provisions of intentional non-compliance.

Flat rate 5,0 PLN – 69 151 379,37 0,0 – 69 151 379,37
PL Rural Development EAGGF Transitional Instrument (2000-2006) 2007

Land parcel system not completely vectorised.

Acceptance of ineligible land for payments.

Too low number of on-the-spot checks in regions with high error rates. Erroneous application of provisions of intentional non-compliance.

One-off PLN – 12 943 389,24 0,0 – 12 943 389,24
PL Rural Development EAGGF Transitional Instrument (2000-2006) 2007

Land parcel system not completely vectorised.

Acceptance of ineligible land for payments.

Too low number of on-the-spot checks in regions with high error rates. Erroneous application of provisions of intentional non-compliance.

Flat rate 5,0 PLN – 78 434 429,08 0,0 – 78 434 429,08
Total PL (PLN) – 180 448 032,62 0,0 – 180 448 032,62
Grand total (PLN) – 279 794 442,15 0,0 – 279 794 442,15
Grand total (EUR) – 25 583 996,81 – 1 894 213,61 – 23 689 783,2
MSProgrammeFYReason for correctionType%CurrencyAmountDeductions already madeFinancial impact
SKRD Guarantee (programme 2004 SK 06 GDO 001)2005Incorrect control procedure resulting in insufficient controls within chosen samplesflat-rate2,0EUR–1 249 561,00,0–1 249 561,0
SKRD Guarantee (programme 2004 SK 06 GDO 001)2006Incorrect control procedure resulting in insufficient controls within chosen samplesflat-rate2,0EUR–1 784 419,00,0–1 784 419,0
SKRD Guarantee (programme 2004 SK 06 GDO 001)2007Incorrect control procedure resulting in insufficient controls within chosen samplesflat-rate2,0EUR–933,00,0–933,0
Total SK–3 034 913,00,0–3 034 913,0

BUDGET ITEM 6711

MSProgrammeFYReason for correctionType%CurrencyAmountDeductions already madeFinancial impact
GBRural Development Programme 2007UK06RPO0012007Weaknesses in key checks and in adminitrative controls Insufficient checks of GAEC criteria and cross-checks with animal databaseflat-rate5,0EUR–39 244,00,0–39 244,0
Total GB–39 244,00,0–39 244,0

BUDGET ITEM 05 07 01 07

MSProgrammeFYReason for correctionType%CurrencyAmountDeductions already madeFinancial impact
HUFinancial audit — Overshooting2008Ineligible expenditureone-offEUR–5 622,81–5 622,810,0
HUFinancial audit — Overshooting2008Overshooting of financial ceilingsone-offEUR21 511,01–5 432,5526 943,56
Total HU (EUR)15 888,2–11 055,3626 943,56
PTDirect Payments2004Reimbursement following judgment of Court of Justice in the case T-50/07one-offEUR1 983 698,00,01 983 698,0
PTFlax — Production Aid2001Reimbursement following judgment of Court of Justice in the case T-183/06one-offEUR3 135 348,713 135 348,71
Total PT 5 119 046,71 0,05 119 046,71