OpenLegislation

Division BAT-associated energy consumption levels

United Kingdom

Original text. Later amendments are not shown.

See Table 1.

Table 1

BAT-associated energy consumption levels for new plants and major upgrades using dry process kiln with multistage preheating and precalcination

Levels do not apply to plants producing special cement or white cement clinker that require significantly higher process temperatures due to product specifications.

Under normal (excluding, e.g. start-ups and shutdowns) and optimised operational conditions.

The production capacity has an influence on the energy demand, with higher capacities providing energy savings and smaller capacities requiring more energy. Energy consumption also depends on the number of cyclone preheater stages, with more cyclone preheater stages leading to lower energy consumption of the kiln process. The appropriate number of cyclone preheater stages is mainly determined by the moisture content of raw materials.

ProcessUnitBAT-associated energy consumption levelsf1
Dry process with multistage preheating and precalcinationMJ/tonne clinker2 900 – 3 300f2 f3

Annotations

Footnotes

f1

Levels do not apply to plants producing special cement or white cement clinker that require significantly higher process temperatures due to product specifications.

f2

Under normal (excluding, e.g. start-ups and shutdowns) and optimised operational conditions.

f3

The production capacity has an influence on the energy demand, with higher capacities providing energy savings and smaller capacities requiring more energy. Energy consumption also depends on the number of cyclone preheater stages, with more cyclone preheater stages leading to lower energy consumption of the kiln process. The appropriate number of cyclone preheater stages is mainly determined by the moisture content of raw materials.