Article 127F Existing EU authorisationsX1F1
The holder of an existing EU authorisation which has the relevant connection with Great Britain must, before the end of the 60 day post-IP completion period, supply the Agency with the required technical information relating to the authorisation.
An existing EU authorisation which does not have the relevant connection with Great Britain ceases to have effect (as F2assimilated law) on IP completion day.
An existing EU authorisation has the relevant connection with Great Britain if the holder of the authorisation is established in Great Britain.
In this Article—
“ existing EU authorisation ” means an authorisation granted in accordance with Articles 60 to 64 of EU REACH which is subsisting immediately before IP completion day;
“ holder ”, in relation to an existing EU authorisation, means the person to whom the authorisation has been granted;
“ required technical information ”, in relation to an existing EU authorisation, means—
- (a)
the information included in the application for the authorisation in accordance with Article 62(4) and (5) of EU REACH,
- (b)
any other information provided to ECHA by the applicant for the authorisation which was material to the formation of ECHA's opinion in relation to the application for the authorisation, and
- (c)
any information required to be submitted or recorded before IP completion day under any condition under which the authorisation is granted.
- (a)
Annotations
Textual amendments
- F1
Title 14A inserted (31.12.2020) by The REACH etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/758), reg. 1(1), Sch. 2 (as amended by S.I. 2019/858, regs. 1, 4 (as amended by S.I. 2020/1577, regs. 1(1)(a), 12(2)); S.I. 2019/1144, regs. 1, 4 (as amended by S.I. 2020/1577, regs. 1(1)(a), 13(2)); S.I. 2020/1313, regs. 1(3), 6; S.I. 2020/1577, regs. 1(1)(b), 5); 2020 c. 1, Sch. 5 para. 1(1)
- F2
Word in Art. 127F(2) substituted (27.2.2025) by The Retained EU Law (Revocation and Reform) Act 2023 (Consequential Amendments) Regulations 2025 (S.I. 2025/82), reg. 1(2), Sch. 15 para. 74(2)(d)