OpenLegislation

Division 4.2.1 General provisionsF1

United Kingdom Repealed

Original text. Later amendments are not shown.

The performance to be achieved by the energy subsystem is specified at least by the required performance of the rail system with respect to:

  1. (a)

    maximum line speed;

  2. (b)

    type(s) of train;

  3. (c)

    train service requirements;

  4. (d)

    power demand of the trains at the pantographs.

Annotations

Textual amendments

F1

Regulation revoked (31.12.2020) by The Railways (Interoperability) (Miscellaneous Amendments and Revocations) (EU Exit) Regulations 2020 (S.I. 2020/318), reg. 1(2)(c), Sch. 2