OpenLegislation

Division 4.2.4.1 Maximum train currentF1

United Kingdom Repealed

Original text. Later amendments are not shown.

The energy subsystem design shall ensure the ability of the power supply to achieve the specified performance and allow the operation of trains with a power less than 2 MW without power or current limitation.

Annotations

Textual amendments

F1

Regulation revoked (31.12.2020) by The Railways (Interoperability) (Miscellaneous Amendments and Revocations) (EU Exit) Regulations 2020 (S.I. 2020/318), reg. 1(2)(c), Sch. 2