Division 4.2.4.1 Maximum train currentF1
United Kingdom Repealed
The energy subsystem design shall ensure the ability of the power supply to achieve the specified performance and allow the operation of trains with a power less than 2 MW without power or current limitation.
Annotations
Textual amendments
- F1
Regulation revoked (31.12.2020) by The Railways (Interoperability) (Miscellaneous Amendments and Revocations) (EU Exit) Regulations 2020 (S.I. 2020/318), reg. 1(2)(c), Sch. 2