Division 2
United Kingdom
F1Type examination shall be carried out by assessment of the adequacy of the technical design of the subsystem or the safety component through examination of the technical documentation referred to in point 3, plus examination of a specimen, representative of the production envisaged, of the complete subsystem or safety component (production type).
Annotations
Textual amendments
- F1
Word in Annex 3 Point 2 substituted (31.12.2020) by The Cableway Installations (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/1347), regs. 1, 53(c); 2020 c. 1, Sch. 5 para. 1(1)
Notes on Annex III
Textual amendments
- F1
Word in Annex 3 heading substituted (31.12.2020) by The Cableway Installations (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/1347), regs. 1, 53(a); 2020 c. 1, Sch. 5 para. 1(1)