Division 7.3.4.3.3 The cycle energy demand calculated according to paragraph 5. of Sub-Annex 7 with corrected road load coefficients f0a, f1a and f2a, for the alternative warm-up procedure shall be equal to or higher than the cycle energy demand calculated with the target road load coefficients f0, f1, and f2, for each applicable phase.
The corrected road load coefficients f0a, f1a and f2a, shall be calculated according to the following equations:
where:
Ad_alt, Bd_alt and Cd_alt Ad_WLTC, Bd_WLTC and Cd_WLTC
are the chassis dynamometer setting coefficients after the alternative warm-up procedure;
are the chassis dynamometer setting coefficients after a WLTC warm-up procedure described in paragraph 7.3.4.1. of this Sub-Annex and a valid chassis dynamometer setting according to paragraph 8. of this Sub-Annex.