Division 3.2.4.6 REESS charging and measuring the recharged electric energy
Original text. Later amendments are not shown.
- 3.2.4.6.1The vehicle shall be connected to the mains within 120 minutes after the applicable WLTP test cycle n+1 in which the break-off criterion for the charge-depleting Type 1 test is reached for the first time.
- 3.2.4.6.2Division 3.2.4.6.2