Automatic low frequency demand disconnection scheme characteristics:

ParameterF1......Values SA Great Britain...Measuring Unit

Demand disconnection starting mandatory level:

Frequency

. . .. . .48,8. . .Hz

Demand disconnection starting mandatory level:

Demand to be disconnected

. . .. . .5. . .% of the Total Load at national level

Demand disconnection final mandatory level:

Frequency

. . .. . .48. . .Hz

Demand disconnection final mandatory level:

Cumulative Demand to be disconnected

. . .. . .50. . .% of the Total Load at national level
Implementation range. . .. . .± 10. . .% of the Total Load at national level, for a given Frequency
Minimum number of steps to reach the final mandatory level. . .. . .4. . .Number of steps
Maximum Demand disconnection for each step. . .. . .10. . .% of the Total Load at national level, for a given step

Annotations

Textual amendments

F1

Words in Annex omitted (E.W.S.) (31.12.2020) by virtue of The Electricity Network Codes and Guidelines (System Operation and Connection) (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/533), reg. 1(2), Sch. 2 para. 32 (as amended by S.I. 2020/1016, regs. 1(2), 6(2)); 2020 c. 1, Sch. 5 para. 1(1)