OpenLegislation

Division 8.1.8.5.7 PM secondary dilution system verification

United Kingdom

Original text. Later amendments are not shown.

When the propane check is to be repeated to verify the PM secondary dilution system, the following procedure from (a) to (d) shall be used for this verification:

  1. (a)

    The HC sampling system shall be configured to extract a sample near the location of the batch sampler's storage media (such as a PM filter). If the absolute pressure at this location is too low to extract an HC sample, HC may be sampled from the batch sampler pump's exhaust. Caution shall be used when sampling from pump's exhaust because an otherwise acceptable pump leak downstream of a batch sampler flow meter will cause a false failure of the propane check;

  2. (b)

    The propane check shall be repeated as described in this point, but HC shall be sampled from the batch sampler;

  3. (c)

    C3H8 mass shall be calculated, taking into account any secondary dilution from the batch sampler;

  4. (d)

    The reference C3H8 mass shall be subtracted from the calculated mass. If this difference is within ± 5 % of the reference mass, the batch sampler passes this verification. If not, corrective action shall be taken.