OpenLegislation

Schedule 15 Documents to be certifiedI1

England and Wales

The following documents in Table 1 of this schedule are the list referred to in article 43

Table 1

Document NumberNameVersionDate
2.1Location plan - OnshoreRevision BSeptember 2024
2.2Location plan - OffshoreRevision BSeptember 2024
2.3Land plans (Onshore)Revision GJuly 2025
2.4Special Category Land PlansRevision DJune 2025
2.5Works Plans - OnshoreRevision DFebruary 2025
2.6Works plans - OffshoreRevision BOctober 2024
2.7Offshore Order Limits and Grid Coordinates PlanRevision BSeptember2024
2.8Street Works and Access PlanRevision CJanuary 2025
2.9Temporary closure of Public Rights of Way PlanRevision DFebruary 2025
2.10Tree Preservation Order and Hedgerow PlanRevision BSeptember 2024
2.11Historic Environment Plan - OnshoreRevision BSeptember2024
2.12Historic Environment Plan - OffshoreRevision AMarch 2024
2.13Statutory or Non-Statutory Sites and Features of Nature Conservation -OnshoreRevision BSeptember2024
2.14Statutory or Non-Statutory Sites and Features of Nature Conservation - OffshoreRevision AMarch 2024
2.15Water Bodies in a River Basin Management PlanRevision BOctober 2024
2.16Crown Land Plan - OffshoreRevision AMarch 2024
2.17Crown Land Plan (Onshore)Revision EJune2025
2.18Temporary Speed Reduction PlanRevision CDecember 2024
4.1Book of ReferenceRevision HJuly 2025
F15.4.5 Lesser Black Backed Gull Habitats Regulation AssessmentRevision DMarch 2025
5.5.6Lesser Black-Backed Gull Implementation and Monitoring PlanRevision EAugust 2025
5.5.7Kittiwake Implementation and Monitoring PlanRevision FOctober 2025
5.5.8Guillemot and Razorbill Implementation and Monitoring PlanRevision FSeptember 2025
8.1Cable StatementRevision AMarch 2024
8.2Safety Zone StatementRevision AMarch 2024
9.3Offshore Project Design PrinciplesRevision AMarch 2024
9.4Onshore Substation Design Principles DocumentRevision CMarch 2025
9.12Outline Cable Specification and Installation PlanRevision DMarch 2025
9.13Margate and Long Sands SAC Benthic Mitigation PlanRevision HSeptember 2025
9.14.1Outline Marine Mammal Mitigation Protocol - PilingRevision EAugust 2025
9.14.2Outline Marine Mammal Mitigation Protocol - UXO F2Revision F August 2025
9.15Outline Southern North Sea Special Area of Conservation Site Integrity PlanRevision BFebruary 2025
9.16Outline Fisheries Liaison and Co-existence PlanRevision DFebruary 2025
9.17Outline Offshore Operations and Maintenance PlanRevision AMarch 2024
9.18Outline Project Environmental Management PlanRevision AMarch 2024
9.18.1Working in proximity to Wildlife in the Marine EnvironmentRevision CAugust 2025
9.19Outline Marine Written Schemes of InvestigationRevision CDecember 2024
9.20Outline Navigation and Installation PlanRevision DMarch 2025
9.21Code of Construction PracticeRevision GOctober 2025
9.22Outline Landscape and Ecological Management PlanRevision HOctober 2025
9.23Outline Onshore Written Scheme of InvestigationRevision BMarch 2025
9.24Outline Construction Traffic Management PlanRevision FMarch 2025
9.25Outline Public Access Management PlanRevision DMarch 2025
9.26Outline Workforce Travel PlanRevision CMarch 2024
9.27Outline Skills and Employment StrategyRevision AMarch 2024
9.32Offshore In-Principle Monitoring PlanRevision IOctober 2025
10.30Outline Sediment Disposal Management PlanRevision DMarch 2025
10.47Archaeological mitigation strategyRevision BMarch 2025
10.51Deep Water Route Cable Installation Area (Future Dredging depths)Version 3February 2025
10.65Outline groundwater monitoring planRevision AMarch 2025
Environmental Statement
6.1.1IntroductionRevision AMarch 2024
6.1.2Policy & LegislationRevision AMarch 2024
6.1.3EIA MethodologyRevision AMarch 2024
6.1.3.1Cumulative Effects Assessment MethodologyRevision BDecember 2024
6.1.3.2Transboundary ScreeningRevision AMarch 2024
6.1.4Site Selection and AlternativesRevision AMarch 2024
6.1.5Non-Technical SummaryRevision AMarch 2024
6.1.6Scoping Report and Scoping OpinionRevision AMarch 2024
6.2.1Offshore Project DescriptionRevision AMarch 2024 (for avoidance of doubt because of a discrepancy of cover sheet showing 2023)
6.2.1.1Detailed Offshore Project Design EnvelopeRevision AMarch 2024
6.2.2Marine Geology, Oceanography and Physical processesRevision AMarch 2024
6.2.3Marine Water and Sediment QualityRevision AMarch 2024
6.2.4Offshore OrnithologyRevision AMarch 2024
6.2.5Benthic and Intertidal EcologyRevision BSeptember 2025
6.2.6Fish and Shellfish EcologyRevision BSeptember 2025
6.2.7Marine Mammal EcologyRevision AMarch 2024
6.2.8Commercial FisheriesRevision AMarch 2024
6.2.9Shipping and NavigationRevision AMarch 2024
6.2.10Seascape, Landscape and VisualRevision AMarch 2024
6.2.11Offshore Archaeology and Cultural HeritageRevision AMarch 2024
6.2.12Infrastructure and Other Marine UsersRevision BSeptember 2024
6.2.13Military and Civil AviationRevision AMarch 2024
6.3.1Onshore Project DescriptionRevision COctober 2024
6.3.2Onshore Landscape and Visual Impact AssessmentRevision AMarch 2024
6.3.3Socio-Economic, Tourism and RecreationRevision AMarch 2024
6.3.4Onshore Biodiversity and Nature ConservationRevision BSeptember 2025
6.3.5Ground Conditions and Land UseRevision AMarch 2024
6.3.6Hydrology, Hydrogeology and Flood RiskRevision AMarch 2024
6.3.7Archaeology and Cultural HeritageRevision AMarch 2024
6.3.8Traffic and TransportRevision DMarch 2025
6.3.9Airborne Noise and VibrationRevision AMarch 2024
6.3.10Air QualityRevision AMarch 2024
6.4.1Climate ChangeRevision AMarch 2024
6.4.1.1Greenhouse Gas AssessmentRevision AMarch 2024
6.4.2Human Health and Major DisastersRevision BApril 2024
6.4.3Inter-RelationshipsRevision AMarch 2024
6.6.4.18Onshore Biodiversity Net Gain Indicative Design Stage ReportRevision BFebruary 2025
6.8.1Lesser Black Backed Gull Compensatory Areas Environmental AssessmentRevision CDecember 2024
6.8.1.1Lesser Black Backed Gull Compensatory Areas Flood Risk AssessmentRevision BOctober 2024
6.8.1.2Lesser Black Backed Gull Landscape and Visual Impact AssessmentRevision BOctober 2024
6.8.1.3Lesser Blacked Backed Gull Compensation Site - Ecological Impact AssessmentRevision CDecember 2024
10.75Supplementary Operations and Maintenance AssessmentRevision AAugust 2025
10.76Technical Memo on Revised Environment Agency Flood MappingRevision AAugust 2025

Annotations

Textual amendments

F1

Words in Sch. 15 Table 1 inserted (6.10.2026) by The Five Estuaries Offshore Wind Farm (Correction) Order 2026 (S.I. 2026/1070), art. 1, Sch.

F2

Words in Sch. 15 Table 1 substituted (6.10.2026) by The Five Estuaries Offshore Wind Farm (Correction) Order 2026 (S.I. 2026/1070), art. 1, Sch.

Commencement

I1

Sch. 15 in force at 8.1.2026, see art. 1