Schedule 15 Documents to be certifiedI1
England and Wales
The following documents in Table 1 of this schedule are the list referred to in article 43
Table 1
| Document Number | Name | Version | Date |
|---|---|---|---|
| 2.1 | Location plan - Onshore | Revision B | September 2024 |
| 2.2 | Location plan - Offshore | Revision B | September 2024 |
| 2.3 | Land plans (Onshore) | Revision G | July 2025 |
| 2.4 | Special Category Land Plans | Revision D | June 2025 |
| 2.5 | Works Plans - Onshore | Revision D | February 2025 |
| 2.6 | Works plans - Offshore | Revision B | October 2024 |
| 2.7 | Offshore Order Limits and Grid Coordinates Plan | Revision B | September2024 |
| 2.8 | Street Works and Access Plan | Revision C | January 2025 |
| 2.9 | Temporary closure of Public Rights of Way Plan | Revision D | February 2025 |
| 2.10 | Tree Preservation Order and Hedgerow Plan | Revision B | September 2024 |
| 2.11 | Historic Environment Plan - Onshore | Revision B | September2024 |
| 2.12 | Historic Environment Plan - Offshore | Revision A | March 2024 |
| 2.13 | Statutory or Non-Statutory Sites and Features of Nature Conservation -Onshore | Revision B | September2024 |
| 2.14 | Statutory or Non-Statutory Sites and Features of Nature Conservation - Offshore | Revision A | March 2024 |
| 2.15 | Water Bodies in a River Basin Management Plan | Revision B | October 2024 |
| 2.16 | Crown Land Plan - Offshore | Revision A | March 2024 |
| 2.17 | Crown Land Plan (Onshore) | Revision E | June2025 |
| 2.18 | Temporary Speed Reduction Plan | Revision C | December 2024 |
| 4.1 | Book of Reference | Revision H | July 2025 |
| F15.4.5 | Lesser Black Backed Gull Habitats Regulation Assessment | Revision D | March 2025 |
| 5.5.6 | Lesser Black-Backed Gull Implementation and Monitoring Plan | Revision E | August 2025 |
| 5.5.7 | Kittiwake Implementation and Monitoring Plan | Revision F | October 2025 |
| 5.5.8 | Guillemot and Razorbill Implementation and Monitoring Plan | Revision F | September 2025 |
| 8.1 | Cable Statement | Revision A | March 2024 |
| 8.2 | Safety Zone Statement | Revision A | March 2024 |
| 9.3 | Offshore Project Design Principles | Revision A | March 2024 |
| 9.4 | Onshore Substation Design Principles Document | Revision C | March 2025 |
| 9.12 | Outline Cable Specification and Installation Plan | Revision D | March 2025 |
| 9.13 | Margate and Long Sands SAC Benthic Mitigation Plan | Revision H | September 2025 |
| 9.14.1 | Outline Marine Mammal Mitigation Protocol - Piling | Revision E | August 2025 |
| 9.14.2 | Outline Marine Mammal Mitigation Protocol - UXO | F2Revision F | August 2025 |
| 9.15 | Outline Southern North Sea Special Area of Conservation Site Integrity Plan | Revision B | February 2025 |
| 9.16 | Outline Fisheries Liaison and Co-existence Plan | Revision D | February 2025 |
| 9.17 | Outline Offshore Operations and Maintenance Plan | Revision A | March 2024 |
| 9.18 | Outline Project Environmental Management Plan | Revision A | March 2024 |
| 9.18.1 | Working in proximity to Wildlife in the Marine Environment | Revision C | August 2025 |
| 9.19 | Outline Marine Written Schemes of Investigation | Revision C | December 2024 |
| 9.20 | Outline Navigation and Installation Plan | Revision D | March 2025 |
| 9.21 | Code of Construction Practice | Revision G | October 2025 |
| 9.22 | Outline Landscape and Ecological Management Plan | Revision H | October 2025 |
| 9.23 | Outline Onshore Written Scheme of Investigation | Revision B | March 2025 |
| 9.24 | Outline Construction Traffic Management Plan | Revision F | March 2025 |
| 9.25 | Outline Public Access Management Plan | Revision D | March 2025 |
| 9.26 | Outline Workforce Travel Plan | Revision C | March 2024 |
| 9.27 | Outline Skills and Employment Strategy | Revision A | March 2024 |
| 9.32 | Offshore In-Principle Monitoring Plan | Revision I | October 2025 |
| 10.30 | Outline Sediment Disposal Management Plan | Revision D | March 2025 |
| 10.47 | Archaeological mitigation strategy | Revision B | March 2025 |
| 10.51 | Deep Water Route Cable Installation Area (Future Dredging depths) | Version 3 | February 2025 |
| 10.65 | Outline groundwater monitoring plan | Revision A | March 2025 |
| Environmental Statement | |||
| 6.1.1 | Introduction | Revision A | March 2024 |
| 6.1.2 | Policy & Legislation | Revision A | March 2024 |
| 6.1.3 | EIA Methodology | Revision A | March 2024 |
| 6.1.3.1 | Cumulative Effects Assessment Methodology | Revision B | December 2024 |
| 6.1.3.2 | Transboundary Screening | Revision A | March 2024 |
| 6.1.4 | Site Selection and Alternatives | Revision A | March 2024 |
| 6.1.5 | Non-Technical Summary | Revision A | March 2024 |
| 6.1.6 | Scoping Report and Scoping Opinion | Revision A | March 2024 |
| 6.2.1 | Offshore Project Description | Revision A | March 2024 (for avoidance of doubt because of a discrepancy of cover sheet showing 2023) |
| 6.2.1.1 | Detailed Offshore Project Design Envelope | Revision A | March 2024 |
| 6.2.2 | Marine Geology, Oceanography and Physical processes | Revision A | March 2024 |
| 6.2.3 | Marine Water and Sediment Quality | Revision A | March 2024 |
| 6.2.4 | Offshore Ornithology | Revision A | March 2024 |
| 6.2.5 | Benthic and Intertidal Ecology | Revision B | September 2025 |
| 6.2.6 | Fish and Shellfish Ecology | Revision B | September 2025 |
| 6.2.7 | Marine Mammal Ecology | Revision A | March 2024 |
| 6.2.8 | Commercial Fisheries | Revision A | March 2024 |
| 6.2.9 | Shipping and Navigation | Revision A | March 2024 |
| 6.2.10 | Seascape, Landscape and Visual | Revision A | March 2024 |
| 6.2.11 | Offshore Archaeology and Cultural Heritage | Revision A | March 2024 |
| 6.2.12 | Infrastructure and Other Marine Users | Revision B | September 2024 |
| 6.2.13 | Military and Civil Aviation | Revision A | March 2024 |
| 6.3.1 | Onshore Project Description | Revision C | October 2024 |
| 6.3.2 | Onshore Landscape and Visual Impact Assessment | Revision A | March 2024 |
| 6.3.3 | Socio-Economic, Tourism and Recreation | Revision A | March 2024 |
| 6.3.4 | Onshore Biodiversity and Nature Conservation | Revision B | September 2025 |
| 6.3.5 | Ground Conditions and Land Use | Revision A | March 2024 |
| 6.3.6 | Hydrology, Hydrogeology and Flood Risk | Revision A | March 2024 |
| 6.3.7 | Archaeology and Cultural Heritage | Revision A | March 2024 |
| 6.3.8 | Traffic and Transport | Revision D | March 2025 |
| 6.3.9 | Airborne Noise and Vibration | Revision A | March 2024 |
| 6.3.10 | Air Quality | Revision A | March 2024 |
| 6.4.1 | Climate Change | Revision A | March 2024 |
| 6.4.1.1 | Greenhouse Gas Assessment | Revision A | March 2024 |
| 6.4.2 | Human Health and Major Disasters | Revision B | April 2024 |
| 6.4.3 | Inter-Relationships | Revision A | March 2024 |
| 6.6.4.18 | Onshore Biodiversity Net Gain Indicative Design Stage Report | Revision B | February 2025 |
| 6.8.1 | Lesser Black Backed Gull Compensatory Areas Environmental Assessment | Revision C | December 2024 |
| 6.8.1.1 | Lesser Black Backed Gull Compensatory Areas Flood Risk Assessment | Revision B | October 2024 |
| 6.8.1.2 | Lesser Black Backed Gull Landscape and Visual Impact Assessment | Revision B | October 2024 |
| 6.8.1.3 | Lesser Blacked Backed Gull Compensation Site - Ecological Impact Assessment | Revision C | December 2024 |
| 10.75 | Supplementary Operations and Maintenance Assessment | Revision A | August 2025 |
| 10.76 | Technical Memo on Revised Environment Agency Flood Mapping | Revision A | August 2025 |
Annotations
Textual amendments
- F1
Words in Sch. 15 Table 1 inserted (6.10.2026) by The Five Estuaries Offshore Wind Farm (Correction) Order 2026 (S.I. 2026/1070), art. 1, Sch.
- F2
Words in Sch. 15 Table 1 substituted (6.10.2026) by The Five Estuaries Offshore Wind Farm (Correction) Order 2026 (S.I. 2026/1070), art. 1, Sch.
Commencement
- I1
Sch. 15 in force at 8.1.2026, see art. 1