OpenLegislation

Paragraph 89 I1

As made

The draft cable specification and installation plan referred to in paragraph 88 must set out for Work No. 2—

(a)

the proposed cable burial depth(s);

(b)

the proposed cable burial methods;

(c)

any cable protection proposed including type, volume and anticipated locations; and

(d)

the proposed programme of work for cable burial.

Annotations

Commencement

I1

Sch. 9 para. 89 in force at 8.1.2026, see art. 1