Paragraph 89 I1
The draft cable specification and installation plan referred to in paragraph 88 must set out for Work No. 2—
(a)
the proposed cable burial depth(s);
(b)
the proposed cable burial methods;
(c)
any cable protection proposed including type, volume and anticipated locations; and
(d)
the proposed programme of work for cable burial.