Part 2 EXAMINATION DOCUMENTS FORMING PART OF THE ENVIRONMENTAL STATEMENT TO BE CERTIFIEDI1
England and Wales
(1) Document name | (2) Document reference | (3) Revision number | (4) Date | (5) Examination Library Reference |
|---|---|---|---|---|
| Figure 1-1: Scheme Location | EN010131/APP/3.2 | 2 | 20 November 2023 | REP5-006 |
| Figure 9-2: Fluvial Flood Risk | EN010131/APP/3.2 | 3 | 08 August 2023 | REP2-013 |
| Figure 10-21: Vegetation Removal F1Plan | EN010131/APP/3.2 CR | 4 | 03 October 2023 | CR1-003 |
| Environmental Statement Chapter 5 – Environmental Impact Assessment Methodology | EN010131/APP/3.1 | 2 | 03 October 2023 | REP4-006 |
| Environmental Statement Chapter 8 – Ecology and Nature Conservation | EN010131/APP/3.1 | 2 | 03 October 2023 | REP4-008 |
| Environmental Statement Chapter 10 – Landscape and visual amenity | EN010131/APP/3.1 | F22 (dated August 2023, labelled Revision 1) | 08 August 2023 | REP2-010 |
| Environmental Statement Chapter 12 – Socio-Economics and Land Use | EN010131/APP/3.1 | 2 | 03 October 2023 | REP4-010 |
| Environmental Statement Chapter 13 – Transport and Access | EN010131/APP/3.1 | 2 | 03 October 2023 | REP4-012 |
| Figure 2-5: Grid Connection Access Locations and Construction Compounds | EN010131/APP/3.2 | 2 | 08 August 2023 | REP2-012 |
| Figure 10-7: Areas of Great Landscape Value | EN010131/APP/3.2 | 2 | 08 August 2023 | REP2-014 |
| Figure 10-11: Viewpoint Locations on OS Mapping | EN010131/APP/3.2 | 2 | 08 August 2023 | REP2-015 |
| Figure 10-12: Viewpoint Locations on Aerial Photography | EN010131/APP/3.2 | 2 | 08 August 2023 | REP2-016 |
| Figure 13-5: Walking and Cycling Network | EN010131/APP/3.2 CR | 2 | 03 October 2023 | CR1-004 |
| Figure 13-7: Public Rights of Way Management (Construction Phase) | EN010131/APP/3.2 CR | 2 | 03 October 2023 | CR1-005 |
| Appendix 2-B: Grid Connection Construction Method Statement | EN010131/APP/3.3 | 2 | 08 August 2023 | REP2-018 |
| Appendix 7-E: Trial Trench Evaluation Fieldwork Report | EN010131/APP/3.3 | 2 | 20 November 2023 | REP5-011 |
| Appendix 13-E Part 1: Framework Construction Traffic Management Plan | EN010131/APP/3.3 | F36 | 21 December 2023 | REP6-011 |
| Appendix 13-E Part 2: Framework Construction Traffic Management Plan | EN010131/APP/3.3 | F46 | 21 December 2023 | REP6-011a |
Annotations
Textual amendments
- F1
Word in Sch. 12 Pt. 2 inserted (28.11.2024) by The Gate Burton Energy Park (Correction) Order 2024 (S.I. 2024/1249), art. 1, Sch.
- F2
Words in Sch. 12 Pt. 2 substituted (28.11.2024) by The Gate Burton Energy Park (Correction) Order 2024 (S.I. 2024/1249), art. 1, Sch.
- F3
Word in Sch. 12 Pt. 2 substituted (28.11.2024) by The Gate Burton Energy Park (Correction) Order 2024 (S.I. 2024/1249), art. 1, Sch.
- F4
Word in Sch. 12 Pt. 2 substituted (28.11.2024) by The Gate Burton Energy Park (Correction) Order 2024 (S.I. 2024/1249), art. 1, Sch.
Commencement
- I1
Sch. 12 Pt. 2 in force at 3.8.2024, see art. 1
Notes on the whole SI
Textual amendments
- F1
Words in Preamble omitted (28.11.2024) by virtue of The Gate Burton Energy Park (Correction) Order 2024 (S.I. 2024/1249), art. 1, Sch.