OpenLegislation

Part 2 EXAMINATION DOCUMENTS FORMING PART OF THE ENVIRONMENTAL STATEMENT TO BE CERTIFIEDI1

England and Wales

(1)

Document name

(2)

Document reference

(3)

Revision number

(4)

Date

(5)

Examination Library Reference

Figure 1-1: Scheme LocationEN010131/APP/3.2220 November 2023REP5-006
Figure 9-2: Fluvial Flood RiskEN010131/APP/3.2308 August 2023REP2-013
Figure 10-21: Vegetation Removal F1Plan EN010131/APP/3.2 CR403 October 2023CR1-003
Environmental Statement Chapter 5 – Environmental Impact Assessment MethodologyEN010131/APP/3.1203 October 2023REP4-006
Environmental Statement Chapter 8 – Ecology and Nature ConservationEN010131/APP/3.1203 October 2023REP4-008
Environmental Statement Chapter 10 – Landscape and visual amenityEN010131/APP/3.1 F22 (dated August 2023, labelled Revision 1) 08 August 2023REP2-010
Environmental Statement Chapter 12 – Socio-Economics and Land UseEN010131/APP/3.1203 October 2023REP4-010
Environmental Statement Chapter 13 – Transport and AccessEN010131/APP/3.1203 October 2023REP4-012
Figure 2-5: Grid Connection Access Locations and Construction CompoundsEN010131/APP/3.2208 August 2023REP2-012
Figure 10-7: Areas of Great Landscape ValueEN010131/APP/3.2208 August 2023REP2-014
Figure 10-11: Viewpoint Locations on OS MappingEN010131/APP/3.2208 August 2023REP2-015
Figure 10-12: Viewpoint Locations on Aerial PhotographyEN010131/APP/3.2208 August 2023REP2-016
Figure 13-5: Walking and Cycling NetworkEN010131/APP/3.2 CR203 October 2023CR1-004
Figure 13-7: Public Rights of Way Management (Construction Phase)EN010131/APP/3.2 CR203 October 2023CR1-005
Appendix 2-B: Grid Connection Construction Method StatementEN010131/APP/3.3208 August 2023REP2-018
Appendix 7-E: Trial Trench Evaluation Fieldwork ReportEN010131/APP/3.3220 November 2023REP5-011
Appendix 13-E Part 1: Framework Construction Traffic Management PlanEN010131/APP/3.3 F36 21 December 2023REP6-011
Appendix 13-E Part 2: Framework Construction Traffic Management PlanEN010131/APP/3.3 F46 21 December 2023REP6-011a

Annotations

Textual amendments

F1

Word in Sch. 12 Pt. 2 inserted (28.11.2024) by The Gate Burton Energy Park (Correction) Order 2024 (S.I. 2024/1249), art. 1, Sch.

F2

Words in Sch. 12 Pt. 2 substituted (28.11.2024) by The Gate Burton Energy Park (Correction) Order 2024 (S.I. 2024/1249), art. 1, Sch.

F3

Word in Sch. 12 Pt. 2 substituted (28.11.2024) by The Gate Burton Energy Park (Correction) Order 2024 (S.I. 2024/1249), art. 1, Sch.

F4

Word in Sch. 12 Pt. 2 substituted (28.11.2024) by The Gate Burton Energy Park (Correction) Order 2024 (S.I. 2024/1249), art. 1, Sch.

Commencement

I1

Sch. 12 Pt. 2 in force at 3.8.2024, see art. 1

Notes on the whole SI

Textual amendments

F1

Words in Preamble omitted (28.11.2024) by virtue of The Gate Burton Energy Park (Correction) Order 2024 (S.I. 2024/1249), art. 1, Sch.