Part 2 EXAMINATION DOCUMENTS FORMING PART OF THE ENVIRONMENTAL STATEMENT TO BE CERTIFIED

England and Wales As made

(1)

Document name

(2)

Document reference

(3)

Revision number

(4)

Date

(5)

Examination Library Reference

Figure 1-1: Scheme LocationEN010131/APP/3.2220 November 2023REP5-006
Figure 9-2: Fluvial Flood RiskEN010131/APP/3.2308 August 2023REP2-013
Figure 10-21: Vegetation Removal F1Plan EN010131/APP/3.2 CR403 October 2023CR1-003
Environmental Statement Chapter 5 – Environmental Impact Assessment MethodologyEN010131/APP/3.1203 October 2023REP4-006
Environmental Statement Chapter 8 – Ecology and Nature ConservationEN010131/APP/3.1203 October 2023REP4-008
Environmental Statement Chapter 10 – Landscape and visual amenityEN010131/APP/3.1 F22 (dated August 2023, labelled Revision 1) 08 August 2023REP2-010
Environmental Statement Chapter 12 – Socio-Economics and Land UseEN010131/APP/3.1203 October 2023REP4-010
Environmental Statement Chapter 13 – Transport and AccessEN010131/APP/3.1203 October 2023REP4-012
Figure 2-5: Grid Connection Access Locations and Construction CompoundsEN010131/APP/3.2208 August 2023REP2-012
Figure 10-7: Areas of Great Landscape ValueEN010131/APP/3.2208 August 2023REP2-014
Figure 10-11: Viewpoint Locations on OS MappingEN010131/APP/3.2208 August 2023REP2-015
Figure 10-12: Viewpoint Locations on Aerial PhotographyEN010131/APP/3.2208 August 2023REP2-016
Figure 13-5: Walking and Cycling NetworkEN010131/APP/3.2 CR203 October 2023CR1-004
Figure 13-7: Public Rights of Way Management (Construction Phase)EN010131/APP/3.2 CR203 October 2023CR1-005
Appendix 2-B: Grid Connection Construction Method StatementEN010131/APP/3.3208 August 2023REP2-018
Appendix 7-E: Trial Trench Evaluation Fieldwork ReportEN010131/APP/3.3220 November 2023REP5-011
Appendix 13-E Part 1: Framework Construction Traffic Management PlanEN010131/APP/3.3 F36 21 December 2023REP6-011
Appendix 13-E Part 2: Framework Construction Traffic Management PlanEN010131/APP/3.3 F46 21 December 2023REP6-011a

Annotations

Textual amendments

F1

Word in Sch. 12 Pt. 2 inserted (28.11.2024) by The Gate Burton Energy Park (Correction) Order 2024 (S.I. 2024/1249), art. 1, Sch.

F2

Words in Sch. 12 Pt. 2 substituted (28.11.2024) by The Gate Burton Energy Park (Correction) Order 2024 (S.I. 2024/1249), art. 1, Sch.

F3

Word in Sch. 12 Pt. 2 substituted (28.11.2024) by The Gate Burton Energy Park (Correction) Order 2024 (S.I. 2024/1249), art. 1, Sch.

F4

Word in Sch. 12 Pt. 2 substituted (28.11.2024) by The Gate Burton Energy Park (Correction) Order 2024 (S.I. 2024/1249), art. 1, Sch.

Notes on the whole SI

Textual amendments

F1

Words in Preamble omitted (28.11.2024) by virtue of The Gate Burton Energy Park (Correction) Order 2024 (S.I. 2024/1249), art. 1, Sch.