  1. (a)

    widening and realignment of the mainline carriageway of Gatwick Spur/Airport Way, 1740m long, to include a new flyover over the South Terminal Roundabout and the provision of a third lane eastbound on Gatwick Spur between South Terminal Roundabout and M23 Junction 9;

  2. (b)

    construction of a new eastbound merge slip road (Gatwick Spur Eastbound Merge), 330m long, from South Terminal Roundabout to Gatwick Spur;

  3. (c)

    construction of a new westbound diverge slip road (Gatwick Spur Westbound Diverge), 420m long, from Gatwick Spur to the South Terminal Roundabout;

  4. (d)

    realignment of the existing South Terminal Roundabout;

  5. (e)

    construction of a new eastbound diverge slip road (Airport Way Eastbound Diverge), 265m long, from Airport Way to South Terminal Roundabout;

  6. (f)

    construction of a new westbound merge slip road (Airport Way Westbound Merge), 275m long, from South Terminal Roundabout to Airport Way;

  7. (g)

    realignment and widening of the existing Ring Road North, 80m long;

  8. (h)

    realignment and widening of the existing Ring Road South, 85m long;

  9. (i)

    realignment and widening of the existing B2036 Balcombe Road, 160m long;

  10. (j)

    construction of a new footway connection for pedestrians between B2036 Balcombe Road and Ring Road South, 380m long;

Notes on Schedule 1

Commencement

I1

Sch. 1 in force at 12.10.2025, see art. 1