The Gatwick Airport (Northern Runway Project) Development Consent Order 2025
S.I. 2025/1054 · Made 21 September 2025 · Extends to England and Wales
Infrastructure Planning
Made 21st September 2025
Coming into force 12th October 2025
The application was examined by a Panel of five members (“the Panel) appointed by the Secretary of State pursuant to Chapter 2 of Part 6 of the 2008 Act and carried out in accordance with Chapter 4 of Part 6 of the 2008 Act, and the Infrastructure Planning (Examination Procedure) Rules 2010f3.
The Panel, having considered the application together with the accompanying documents and the representations made and not withdrawn, has submitted a report to the Secretary of State under section 74(2) of the 2008 Act setting out its findings, conclusions and recommendation in respect of the application.
The Secretary of State, having considered the representations made and not withdrawn, and the report of the Panel, has decided to make an Order granting development consent for the development described in the application with modifications which in the opinion of the Secretary of State do not make any substantial changes to the proposals comprised in the application.
The Secretary of State is satisfied that the special category land identified in Part 1 of Schedule 10 to this Order is required for the widening or drainage of an existing highway or partly for the widening and partly for the drainage of such a highway and the giving in exchange of other land is unnecessary, whether in the interests of the persons, if any, entitled to rights of common or other rights or in the interests of the public, and that accordingly section 131(5) of the 2008 Act applies in respect of that land;
The Secretary of State is satisfied that rights to be acquired over the land identified in Part 3A of the table in Part 3 of Schedule 10 to this Order will be acquired for a temporary (although possibly long-lived) purpose, and that accordingly section 132(4B) of the 2008 Act applies in respect of that land; and
The Secretary of State is satisfied that rights to be acquired over the land identified in Part 3B of the table in Part 3 of Schedule 10 to this Order, when imposed on the relevant open space land, will leave that land no less advantageous than it was before to the persons in whom it is vested, other persons, if any, entitled to rights of common or other rights and the public, and that accordingly section 132(3) of the 2008 Act applies in respect of that land.
The Secretary of State, in exercise of the powers conferred by sections 114f4, 115f5, 117f6, 120f7, 122f8, 123f9, 127f10, 131f11, 132f12, 135, 138f13, 147f14, 154 and 229 of, and paragraphs 1 to 4, 10 to 17, 19 to 23, 26, 33, 36 and 37 of Part 1 of Schedule 5 to, the 2008 Act, makes the following Order.
Annotations to the whole text
Footnotes
- f1
2008 c. 29. Parts 1 to 7 were amended by Chapter 6 of Part 6 of the Localism Act 2011 (c. 20).
- f2
S.I. 2009/2264, amended by S.I. 2010/439, S.I. 2010/602, S.I. 2012/635, S.I. 2012/2654, S.I. 2012/2732, S.I. 2013/522, S.I. 2013/755, S.I. 2014/469, S.I. 2014/2381, S.I. 2015/377, S.I. 2015/1682, S.I. 2017/524, S.I. 2017/572, S.I. 2018/378, S.I. 2019/734, S.I. 2020/764, S.I. 2021/978, S.I. 2022/634, S.I. 2023/1071 and S.I. 2024/332.
- f3
S.I. 2010/103, amended by S.I. 2012/635 and S.I. 2024/317.
- f4
Section 114 was amended by paragraph 55(2) and (3) of Schedule 13 to the Localism Act 2011.
- f5
Section 115 was amended by paragraph 56 of Schedule 13 and Part 20 of Schedule 25 to the Localism Act 2011, section 160(2) to (6) of the Housing and Planning Act 2016 (c. 22) and section 43 of the Wales Act 2017 (c. 4).
- f6
Section 117 was amended by paragraph 58(3) and (4) of Schedule 13 and Part 20 of Schedule 25 to the Localism Act 2011.
- f7
Section 120 was amended by section 140 of, and paragraph 60(2) and (3) of Schedule 13 to, the Localism Act 2011.
- f8
Section 122 was amended by paragraph 62 of Schedule 13 to the Localism Act 2011.
- f9
Section 123 was amended by paragraph 62 of Schedule 13 to the Localism Act 2011.
- f10
Section 127 was amended by paragraph 64(2) of Schedule 13 to the Localism Act and section 23(2) of the Growth and Infrastructure Act 2013 (c. 27).
- f11
Section 131 was amended by section 24(2) of the Growth and Infrastructure Act 2013.
- f12
Section 132 was amended by section 24(3) of the Growth and Infrastructure Act 2013.
- f13
Section 138 was amended by section 23(4) of the Growth and Infrastructure Act 2013 and S.I. 2017/1285.
Section 138 was amended by section 23(4) of the Growth and Infrastructure Act 2013 and S.I. 2017/1285.
- f14
Section 147 was amended by paragraph 68 of Schedule 13 and Part 20 of Schedule 25 to the Localism Act 2011.
Contents
- Part 1: PRELIMINARY
- 1Citation and commencement
- 2Interpretation
- Part 2: PRINCIPAL POWERS
- 3Development consent etc. granted by the Order
- 4Maintenance of authorised development
- 5Maintenance of drainage works
- 6Limits of works
- 7Benefit of Order
- 8Consent to transfer benefit of Order
- 9Planning permission
- Part 3: STREETS
- 10Application of the 1991 Act
- 11Street works
- 12Power to alter layout, etc., of streets
- 13Stopping up of streets
- 14Temporary stopping up of streets
- 15Public rights of way – creation, diversion and stopping up
- 16Access to works
- 17Classification of roads, etc.
- 18Traffic regulations
- 19Clearways, prohibitions and restrictions
- 20Construction and maintenance of local highway works
- 21Agreements with highway authorities
- Part 4: SUPPLEMENTAL POWERS
- 22Discharge of water
- 23Protective work to buildings
- 24Authority to survey and investigate the land
- 25Felling or lopping of trees and removal of hedgerows
- 26Removal of human remains
- Part 5: POWERS OF ACQUISITION AND POSSESSION
- 27Compulsory acquisition of land
- 28Compulsory acquisition of rights and imposition of restrictive covenants
- 29Compulsory acquisition of land – incorporation of the mineral code
- 29APower to override easements and other rights
- 30Time limit for exercise of authority to acquire land compulsorily
- 31Private rights of way
- 32Modification of Part 1 of the 1965 Act
- 33Application of the 1981 Act
- 34Acquisition of subsoil or airspace only
- 35Rights under or over streets
- 36Temporary use of land for carrying out the authorised development
- 37Time limit for exercise of authority to temporarily use land for carrying out the authorised development
- 38Temporary use of land for maintaining the authorised development
- 39Special category land
- 40Statutory undertakers
- 41Apparatus and rights of statutory undertakers in stopped-up streets
- 42Recovery of costs of new connections
- 43Crown rights
- 44Disregard of certain improvements, etc.
- Part 6: MISCELLANEOUS AND GENERAL
- 45Disapplication of legislative provisions
- 46Application of landlord and tenant law
- 47Defence to proceedings in respect of statutory nuisance
- 48No double recovery
- 49Protection of interests
- 50Certification of documents, etc.
- 51Service of notices
- 52Arbitration
- 53Deemed consent
- 54Conservation and enhancement of protected landscapes
- Signature
- Schedule 1: AUTHORISED DEVELOPMENT
- In the administrative area of Crawley Borough Council, Reigate and Banstead Borough Council, Mole Valley District Council and Tandridge District Council
- Airfield works
- Work No. 1
- Airport support facilities
- Terminal works
- Hotels, offices and car parking
- Surface access works
- Highway
- Structures
- Drainage
- Highways
- Structures
- Drainage
- Highways
- Structures
- Drainage
- Miscellaneous
- Ancillary or related development
- Schedule 2: REQUIREMENTS
- Part 1: REQUIREMENTS PERTAINING TO CONSTRUCTION
- 1Interpretation
- 2Phasing scheme
- 3Time limit and notifications
- 4Detailed design
- 5Local highway works – detailed design
- 6National highway works
- 7Code of construction practice
- 8Landscape and ecology management plan
- 9Contaminated land and groundwater
- 10Surface and foul water drainage
- 11Local highway surface water drainage
- 12Construction traffic management plan
- 13Construction workforce travel plan
- 14Archaeological remains
- 15Air noise limits
- 16Paragraph 16
- 17Verification of air noise monitoring equipment
- 18Receptor-based noise mitigation
- 19Airport operations
- 20Surface access
- 21Carbon action plan
- 22Public rights of way
- 23Flood compensation delivery plan
- 24Flood resilience statement
- 25Operational waste management plan
- 26Water treatment works footpath
- 27Construction dust management plan
- 28Arboricultural and vegetation method statement
- 29Soil management plan
- 30Site waste management plan
- 31Construction sequencing
- 32Western noise mitigation bund
- 33North and South Terminal roundabouts BAU improvement scheme
- 34Office occupier
- 35Odour monitoring and management plan
- 36Paragraph 36
- 37Car parking spaces
- 38Speed limit monitoring
- 39Tree balance statement
- Part 2: PROCEDURE FOR DISCHARGE OF REQUIRMENTS
- 40Applications made under requirements
- 41Further information
- Schedule 3: STOPPING UP OF STREETS AND PRIVATE MEANS OF ACCESS AND PROVISIONS OF NEW STREETS AND PRIVATE MEANS OF ACCESS
- 1STREETS TO BE STOPPED UP AND SUBSTITUTE STREETS AND NEW STREETS TO BE PROVIDED
- 2PRIVATE MEANS OF ACCESS TO BE STOPPED UP AND SUBSTITUTE PRIVATE MEANS AND NEW PRIVATE MEANS
- Schedule 4: PUBLIC RIGHTS OF WAY, FOOTWAYS AND CYCLE TRACKS TO BE STOPPED UP
- 1PUBLIC RIGHTS OF WAY TO BE DIVERTED FOR WHICH A SUBSTITUTE IS TO BE PROVIDED
- 2PUBLIC RIGHTS OF WAY TO BE PERMANENTLY STOPPED UP FOR WHICH NO SUBSTITUTE IS TO BE PROVIDED
- 3FOOTWAYS AND CYCLE TRACKS
- Schedule 5: CLASSIFICATION OF ROADS
- 1NEW AND REALIGNED CLASSIFIED TRUNK ROADS
- 2NEW AND REALIGNED CLASSIFIED NON-TRUNK ROADS
- 3NEW AND REALIGNED UNCLASSIFIED ROADS
- 4ROADS TO BE DE-TRUNKED
- Schedule 6: TRAFFIC REGULATION MEASURES
- 1SPEED LIMITS
- 2TRAFFIC REGULATION MEASURES (CLEARWAYS, HEIGHT RESTRICTIONS AND PROHIBITIONS)
- 3REVOCATIONS AND VARIATIONS OF EXISTING TRAFFIC REGULATION ORDERS
- Schedule 7LAND IN WHICH ONLY NEW RIGHTS ETC. MAY BE ACQUIRED
- Schedule 8: MODIFICATION OF COMPENSATION AND COMPULSORY PURCHASE ENACTMENTS FOR CREATION OF NEW RIGHTS AND IMPOSITION OF RESTRICTIVE COVENANTS
- 1Compensation enactments
- 2Paragraph 2
- 3Paragraph 3
- 4Application of Part 1 of the 1965 Act
- 5Paragraph 5
- Schedule 9: PROTECTIVE PROVISIONS
- Part 1: FOR THE PROTECTION OF ELECTRICITY, GAS, WATER AND SEWAGE UNDERTAKERS
- 1Paragraph 1
- 2Paragraph 2
- 3On street apparatus
- 4Apparatus in stopped up public rights of way
- 5Protective works to buildings
- 6Acquisition of land
- 7Removal of apparatus
- 8Facilities and rights for alternative apparatus
- 9Retained apparatus
- 10Expenses and costs
- 11Paragraph 11
- 12Cooperation
- 13Paragraph 13
- 14Paragraph 14
- Part 2: FOR THE PROTECTION OF OPERATORS OF ELECTRONIC COMMUNICATIONS CODE NETWORKS
- 15Paragraph 15
- 16Paragraph 16
- 17Paragraph 17
- 18Paragraph 18
- Part 3: FOR THE PROTECTION OF NATIONAL HIGHWAYS
- 19Application etc.
- 20Interpretation
- 21General
- 24Works outside the Order limits
- 25Prior approvals and security
- 26Construction of the specified works
- 27Payments
- 28Provisional certificate
- 29Opening
- 30Final condition survey
- 31Defects period
- 32Final certificate
- 33Security
- 34Commuted sum
- 35Insurance
- 36Indemnity
- 37Maintenance of the specified works
- 38Land
- 39Expert determination
- Part 4: FOR THE PROTECTION OF RAILWAY INTERESTS
- 40Paragraph 40
- 41Paragraph 41
- 42Paragraph 42
- 43Paragraph 43
- 44Paragraph 44
- 45Paragraph 45
- 46Paragraph 46
- 47Paragraph 47
- 48Paragraph 48
- 49Paragraph 49
- 50Paragraph 50
- 51Paragraph 51
- 52Paragraph 52
- 53Paragraph 53
- 54Paragraph 54
- 55Paragraph 55
- 56Paragraph 56
- 57Paragraph 57
- 58Paragraph 58
- 59Paragraph 59
- 60Paragraph 60
- Part 5: FOR THE PROTECTION OF SOUTHERN GAS NETWORKS PLC AS GAS UNDERTAKER
- 61Application
- 62Interpretation
- 63On street apparatus
- 64Apparatus of SGN in stopped up streets
- 65Protective works to buildings
- 66Acquisition of land
- 67Removal of apparatus
- 68Facilities and rights for alternative apparatus
- 69Retained apparatus: protection of SGN
- 70Expenses
- 71Enactments and agreements
- 72Co-operation
- 73Access
- 74Arbitration
- 75Notices
- Part 6: FOR THE PROTECTION OF THAMES WATER UTILITIES LIMITED
- 76Application
- 77Interpretation
- 78On street apparatus
- 79Apparatus in stopped up streets and public rights of way
- 80Protective works to buildings
- 81Acquisition of land or interests
- 82Removal of apparatus
- 83Facilities and rights for alternative apparatus
- 84Retained apparatus
- 85Expenses and costs
- 86Indemnity
- 87Co-operation
- 88Paragraph 88
- 89Paragraph 89
- 90Paragraph 90
- 91Use of statutory powers
- 92Ground works and surveys
- 94Notices and applications
- Part 7: FOR THE PROTECTION OF ESSO PETROLEUM COMPANY, LIMITED
- 95Application
- 96Interpretation
- 97Acquisition of apparatus
- 98Removal of apparatus and rights for alternative apparatus
- 99Facilities and rights for alternative apparatus
- 100Retained apparatus: protection
- 101Cathodic protection testing
- 102Expenses
- 103Damage to property and other losses
- 104Co-operation
- 105Miscellaneous
- Schedule 10: SPECIAL CATEGORY LAND
- 1SPECIAL CATEGORY LAND TO BE PERMANENTLY ACQUIRED
- 2LAND TO BE LAID OUT AS REPLACEMENT OPEN SPACE
- 3SPECIAL CATEGORY LAND OVER WHICH RIGHTS WILL BE ACQUIRED
- Schedule 11MAXIMUM PARAMETER HEIGHTS
- Schedule 12DOCUMENTS TO BE CERTIFIED
- Explanatory note