widening of the existing Airport Way bridge over the London to Brighton Railway (Airport Way Rail Bridge);
- (s)
construction of a new 240m long retaining wall on the southern side of Airport Way to the west of the Airport Way Rail Bridge (Retaining Wall 36);
- (t)
construction of a new flyover bridge structure (North Terminal Flyover Bridge), to carry the new North Terminal Flyover Link over the new North Terminal Link;
- (u)
construction of a new 85m long retaining wall, southeast of the North Terminal Flyover Bridge (Retaining Wall 32);
- (v)
construction of a new 160m long retaining wall, located between Airport Way Westbound Diverge to North Terminal Roundabout and the existing Inter Terminal Transit Shuttle viaduct (Retaining Wall 30);
- (w)
construction of a new 160m long retaining wall, located between North Terminal Flyover Link and A23 London Road (Retaining Wall 33);
- (x)
construction of a new 160m long retaining wall, located east from the Bridge over the River Mole, adjacent to ramp down to Riverside Garden Park (Retaining Wall 21);
- (y)
construction of a new widened bridge (A23 London Road bridge over the River Mole) to replace the existing bridge over the River Mole on A23 London Road; and