OpenLegislation

Schedule 11 MAXIMUM PARAMETER HEIGHTSI1

England and Wales

(1)

Work No.

(2)

Work description

(3)

Maximum building (or other works) height (m)*1

6(a) and (b)Three-floor pier (Pier 7) and the Pier 7 Autonomous vehicle station18.00
9Replacement central area recycling enclosure (CARE) facility15.00
10Replacement motor transport facilities15.25
11Replacement grounds maintenance facilities8.00
12Replacement airfield surface transport facilities15.00
13Replacement Rendezvous Point North5.00
15Satellite airport fire service facility15.00
16New aircraft hangar32.00
22(a) and (d)North Terminal International Departure Lounge extension (north) and the North Terminal autonomous vehicle station32.50
22(b)North Terminal International Departure Lounge extension (south)30.00
22(c)North Terminal baggage hall and baggage reclaim extension12.50
22(e)Autonomous vehicle maintenance building12.00
22(g)North Terminal multi-storey car park27.00
23(a)South Terminal International Departure Lounge extension27.00
23(c)South Terminal autonomous vehicle station13.00
23(d)Additional coaching gates13.00
26Hotel north of multi-storey car park 327.00
27Hotel on the car rental site16.30
28Car Park H site27.00
30(b)Car Park Y multi-storey car park27.00
31(e)Deck parking provision at Car Park X11.00
32Decked car parking structure at North Terminal Long Stay car park11.00
38(d)Earthworks, landscaping and a bund around the southern and eastern perimeter of Museum Field6.00*2
41(c)Spoil deposition at Pentagon Field4.00*2
43Water treatment works3.00 to 4.00*3
44(b)Wastewater treatment works9.40
* 1 Maximum parameter height for the cited work shown as height in metres from the datum level shown on the parameter plans for that work. This table is for information only and, in the event of conflict with the parameter plans, the parameter plans are to be determinative.
*2 Maximum heights provided for in the design principles in appendix 1 of the design and access statement and not on the parameter plans.
* 3 Maximum building (or other works) height is between 3.00 to 4.00m across the work area. Please refer to the parameter plans for information.

Annotations

Commencement

I1

Sch. 11 in force at 12.10.2025, see art. 1