Schedule 11 MAXIMUM PARAMETER HEIGHTSI1
England and Wales
(1) Work No. | (2) Work description | (3) Maximum building (or other works) height (m)*1 |
|---|---|---|
| 6(a) and (b) | Three-floor pier (Pier 7) and the Pier 7 Autonomous vehicle station | 18.00 |
| 9 | Replacement central area recycling enclosure (CARE) facility | 15.00 |
| 10 | Replacement motor transport facilities | 15.25 |
| 11 | Replacement grounds maintenance facilities | 8.00 |
| 12 | Replacement airfield surface transport facilities | 15.00 |
| 13 | Replacement Rendezvous Point North | 5.00 |
| 15 | Satellite airport fire service facility | 15.00 |
| 16 | New aircraft hangar | 32.00 |
| 22(a) and (d) | North Terminal International Departure Lounge extension (north) and the North Terminal autonomous vehicle station | 32.50 |
| 22(b) | North Terminal International Departure Lounge extension (south) | 30.00 |
| 22(c) | North Terminal baggage hall and baggage reclaim extension | 12.50 |
| 22(e) | Autonomous vehicle maintenance building | 12.00 |
| 22(g) | North Terminal multi-storey car park | 27.00 |
| 23(a) | South Terminal International Departure Lounge extension | 27.00 |
| 23(c) | South Terminal autonomous vehicle station | 13.00 |
| 23(d) | Additional coaching gates | 13.00 |
| 26 | Hotel north of multi-storey car park 3 | 27.00 |
| 27 | Hotel on the car rental site | 16.30 |
| 28 | Car Park H site | 27.00 |
| 30(b) | Car Park Y multi-storey car park | 27.00 |
| 31(e) | Deck parking provision at Car Park X | 11.00 |
| 32 | Decked car parking structure at North Terminal Long Stay car park | 11.00 |
| 38(d) | Earthworks, landscaping and a bund around the southern and eastern perimeter of Museum Field | 6.00*2 |
| 41(c) | Spoil deposition at Pentagon Field | 4.00*2 |
| 43 | Water treatment works | 3.00 to 4.00*3 |
| 44(b) | Wastewater treatment works | 9.40 |
| * 1 Maximum parameter height for the cited work shown as height in metres from the datum level shown on the parameter plans for that work. This table is for information only and, in the event of conflict with the parameter plans, the parameter plans are to be determinative. | ||
| *2 Maximum heights provided for in the design principles in appendix 1 of the design and access statement and not on the parameter plans. | ||
| * 3 Maximum building (or other works) height is between 3.00 to 4.00m across the work area. Please refer to the parameter plans for information. | ||
Annotations
Commencement
- I1
Sch. 11 in force at 12.10.2025, see art. 1