Schedule 12 DOCUMENTS TO BE CERTIFIEDI1
England and Wales
(1) Document | (2) Document Reference | (3) Version |
|---|---|---|
| airport boundary plan | Appendix 1 to Glossary (Doc Ref. 1.4) | 2 |
| appendix 1 of the design and access statement | Design and Access Statement – Appendix 1 – Design Principles (Doc Ref. 7.3) | 7 |
| book of reference | Book of Reference Parts 1 and 2 (Doc Ref. 3.3) | 7 |
| carbon action plan | ES Appendix 5.4.2: Carbon Action Plan (Doc Ref. 5.3) | 2 |
| code of construction practice | ES Appendix 5.3.2: Code of Construction Practice (Doc Ref. 5.3) | 6 |
| consolidated environmental statement | Consolidated Environmental Statement (Doc Ref 10.66) | 3 |
| construction dust management strategy | ES Appendix 5.3.2: CoCP Annex 9 – Construction Dust Management Strategy (Doc Ref. 5.3) | 3 |
| construction resources and waste management plan | ES Appendix 5.3.2: CoCP Annex 5 – Construction Resources and Waste Management Plan (Doc Ref. 5.3) | 3 |
| flood resilience statement | Annex 6 to ES Appendix 11.9.6: Flood Risk Assessment (Doc Ref. 5.3) | 3 |
| forecast data book | ES Appendix 4.3.1: Forecast Data Book (Doc Ref. 5.3) | 1 |
| land plans | Land Plans - For Approval (Doc Ref. 4.2) | 5 |
| F1noise insulation scheme document | Appendix 2 to Annex 2 of the submission by Gatwick Airport Limited to the Secretary of State dated 24 April 2025 | 1 |
| North and South Terminal roundabouts BAU improvement scheme plans | North and South Terminal Roundabouts BAU Improvement Scheme Plans (Doc Ref. 4.10) | 2 |
| odour monitoring and management plan | Odour Monitoring and Management Plan (Doc Ref. 10.57) | 3 |
| operational waste management strategy | Operational Waste Management Strategy (Doc Ref. 10.12) | 1 |
| outline arboricultural and vegetation method statement | ES Appendix 5.3.2: CoCP Annex 6 – Outline Arboricultural and Vegetation Method Statement (Doc Ref. 5.3) | 6 |
| outline construction traffic management plan | ES Appendix 5.3.2: CoCP Annex 3 – Outline Construction Traffic Management Plan (Doc Ref. 5.3) | 4 |
| outline construction workforce travel plan | ES Appendix 5.3.2: CoCP Annex 2 – Outline Construction Workforce Travel Plan (Doc Ref 5.3) | 3 |
| outline landscape and ecology management plan | ES Appendix 8.8.1: Outline Landscape and Ecology Management Plan (Doc Ref. 5.3) | 8 |
| parameter plans | Parameter Plans - For Approval (Doc Ref. 4.7) | 5 |
| public rights of way management strategy | ES Appendix 19.8.1: Public Rights of Way Management Strategy (Doc Ref. 5.3) | 4 |
| rights of way and access plans | Rights of Way and Access Plans - For Approval (Doc Ref. 4.6) | 5 |
| soil management strategy | ES Appendix 5.3.2: CoCP Annex 4 – Soil Management Strategy (Doc Ref. 5.3) | 1 |
| special category land plans | Special Category Land Plans - For Approval (Doc Ref. 4.4) | 4 |
| surface access commitments | ES Appendix 5.4.1: Surface Access Commitments (Doc Ref. 5.3) | 6 |
| surface access drainage strategy | Annex 2 to ES Appendix 11.9.6: Flood Risk Assessment (Doc Ref. 5.3) | F23 |
| surface access general arrangements | Surface Access Highways Plans – General Arrangements - For Approval (Doc Ref. 4.8.1) | 2 |
| surface access engineering section drawings | Surface Access Highways Plans – Engineering Section Drawings - For Approval (Doc Ref. 4.8.2) | 3 |
| surface access structure section drawings | Surface Access Highways Plans – Structure Section Drawings - For Approval (Doc Ref. 4.8.3) | 3 |
| Traffic Regulation Measures – Classification of Roads Plans | Traffic Regulation Plans – Classification of Roads - For Approval (Doc Ref. 4.9.2) | 3 |
| Traffic Regulation Measures – Clearways and Prohibitions plans | Traffic Regulation Plans – Clearways and Prohibitions - For Approval (Doc Ref. 4.9.3) | 3 |
| Traffic Regulation Measures – Speed Limits plans | Traffic Regulation Plans – Speed Limits - For Approval (Doc Ref. 4.9.1) | 3 |
| tree survey report and arboricultural impact assessment | ES Appendix 8.10.1 – Tree Survey Report and Arboricultural Impact Assessment (Doc Ref. 5.3) | 4 |
| water treatment works footpath plan | Annex 2 to ES Appendix 19.8.1: Public Rights of Way Management Strategy (Doc Ref. 5.3) | 4 |
| works plans | Works Plans - For Approval (Doc Ref. 4.5) | 7 |
| written scheme of investigation for Surrey | ES Appendix 7.8.1: Written Scheme of Investigation for post-consent Archaeological Investigations – Surrey (Doc Ref. 5.3) | 4 |
| written scheme of investigation for West Sussex | ES Appendix 7.8.2: Written Scheme of Investigation for post-consent Archaeological Investigations and Historic Building Recording – West Sussex (Doc Ref. 5.3) | 5 |
Annotations
Textual amendments
- F1
Words in Sch. 12 inserted (21.1.2026) by The Gatwick Airport (Northern Runway Project) Development Consent (Correction) Order 2026 (S.I. 2026/43), art. 1, Sch. (which affecting local non-print S.I. is replaced by printed local S.I. 2026/1055)
- F2
Word in Sch. 12 substituted (21.1.2026) by The Gatwick Airport (Northern Runway Project) Development Consent (Correction) Order 2026 (S.I. 2026/43), art. 1, Sch. (which affecting local non-print S.I. is replaced by printed local S.I. 2026/1055)
Commencement
- I1
Sch. 12 in force at 12.10.2025, see art. 1