OpenLegislation

Schedule 12 DOCUMENTS TO BE CERTIFIEDI1

England and Wales

(1)

Document

(2)

Document Reference

(3)

Version

airport boundary planAppendix 1 to Glossary (Doc Ref. 1.4)2
appendix 1 of the design and access statementDesign and Access Statement – Appendix 1 – Design Principles (Doc Ref. 7.3)7
book of referenceBook of Reference Parts 1 and 2 (Doc Ref. 3.3)7
carbon action planES Appendix 5.4.2: Carbon Action Plan (Doc Ref. 5.3)2
code of construction practiceES Appendix 5.3.2: Code of Construction Practice (Doc Ref. 5.3)6
consolidated environmental statementConsolidated Environmental Statement (Doc Ref 10.66)3
construction dust management strategyES Appendix 5.3.2: CoCP Annex 9 – Construction Dust Management Strategy (Doc Ref. 5.3)3
construction resources and waste management planES Appendix 5.3.2: CoCP Annex 5 – Construction Resources and Waste Management Plan (Doc Ref. 5.3)3
flood resilience statementAnnex 6 to ES Appendix 11.9.6: Flood Risk Assessment (Doc Ref. 5.3)3
forecast data bookES Appendix 4.3.1: Forecast Data Book (Doc Ref. 5.3)1
land plansLand Plans - For Approval (Doc Ref. 4.2)5
F1noise insulation scheme document Appendix 2 to Annex 2 of the submission by Gatwick Airport Limited to the Secretary of State dated 24 April 20251
North and South Terminal roundabouts BAU improvement scheme plansNorth and South Terminal Roundabouts BAU Improvement Scheme Plans (Doc Ref. 4.10)2
odour monitoring and management planOdour Monitoring and Management Plan (Doc Ref. 10.57)3
operational waste management strategyOperational Waste Management Strategy (Doc Ref. 10.12)1
outline arboricultural and vegetation method statementES Appendix 5.3.2: CoCP Annex 6 – Outline Arboricultural and Vegetation Method Statement (Doc Ref. 5.3)6
outline construction traffic management planES Appendix 5.3.2: CoCP Annex 3 – Outline Construction Traffic Management Plan (Doc Ref. 5.3)4
outline construction workforce travel planES Appendix 5.3.2: CoCP Annex 2 – Outline Construction Workforce Travel Plan (Doc Ref 5.3)3
outline landscape and ecology management planES Appendix 8.8.1: Outline Landscape and Ecology Management Plan (Doc Ref. 5.3)8
parameter plansParameter Plans - For Approval (Doc Ref. 4.7)5
public rights of way management strategyES Appendix 19.8.1: Public Rights of Way Management Strategy (Doc Ref. 5.3)4
rights of way and access plansRights of Way and Access Plans - For Approval (Doc Ref. 4.6)5
soil management strategyES Appendix 5.3.2: CoCP Annex 4 – Soil Management Strategy (Doc Ref. 5.3)1
special category land plansSpecial Category Land Plans - For Approval (Doc Ref. 4.4)4
surface access commitmentsES Appendix 5.4.1: Surface Access Commitments (Doc Ref. 5.3)6
surface access drainage strategyAnnex 2 to ES Appendix 11.9.6: Flood Risk Assessment (Doc Ref. 5.3) F23
surface access general arrangementsSurface Access Highways Plans – General Arrangements - For Approval (Doc Ref. 4.8.1)2
surface access engineering section drawingsSurface Access Highways Plans – Engineering Section Drawings - For Approval (Doc Ref. 4.8.2)3
surface access structure section drawingsSurface Access Highways Plans – Structure Section Drawings - For Approval (Doc Ref. 4.8.3)3
Traffic Regulation Measures – Classification of Roads PlansTraffic Regulation Plans – Classification of Roads - For Approval (Doc Ref. 4.9.2)3
Traffic Regulation Measures – Clearways and Prohibitions plansTraffic Regulation Plans – Clearways and Prohibitions - For Approval (Doc Ref. 4.9.3)3
Traffic Regulation Measures – Speed Limits plansTraffic Regulation Plans – Speed Limits - For Approval (Doc Ref. 4.9.1)3
tree survey report and arboricultural impact assessmentES Appendix 8.10.1 – Tree Survey Report and Arboricultural Impact Assessment (Doc Ref. 5.3)4
water treatment works footpath planAnnex 2 to ES Appendix 19.8.1: Public Rights of Way Management Strategy (Doc Ref. 5.3)4
works plansWorks Plans - For Approval (Doc Ref. 4.5)7
written scheme of investigation for SurreyES Appendix 7.8.1: Written Scheme of Investigation for post-consent Archaeological Investigations – Surrey (Doc Ref. 5.3)4
written scheme of investigation for West SussexES Appendix 7.8.2: Written Scheme of Investigation for post-consent Archaeological Investigations and Historic Building Recording – West Sussex (Doc Ref. 5.3)5

Annotations

Textual amendments

F1

Words in Sch. 12 inserted (21.1.2026) by The Gatwick Airport (Northern Runway Project) Development Consent (Correction) Order 2026 (S.I. 2026/43), art. 1, Sch. (which affecting local non-print S.I. is replaced by printed local S.I. 2026/1055)

F2

Word in Sch. 12 substituted (21.1.2026) by The Gatwick Airport (Northern Runway Project) Development Consent (Correction) Order 2026 (S.I. 2026/43), art. 1, Sch. (which affecting local non-print S.I. is replaced by printed local S.I. 2026/1055)

Commencement

I1

Sch. 12 in force at 12.10.2025, see art. 1