Structures Structures
England and Wales
- (k)
construction of a 230m long retaining wall, to the northeast of Balcombe Road Underbridge (Retaining Wall 27);
- (l)
construction of a 35m long retaining wall, to the southeast of Balcombe Road underbridge (Retaining Wall 37);
- (m)
construction of a 45m long retaining wall, between Gatwick Spur Westbound Diverge and Gatwick Spur (Retaining Wall 39);
- (n)
construction of a 25m long retaining wall, between Gatwick Spur Eastbound merge and Gatwick Spur (Retaining Wall 40);
- (o)
construction of a replacement bridge (Balcombe Road Underbridge) to carry Gatwick Spur, Gatwick Spur Eastbound Merge and Gatwick Spur Westbound Diverge over B2036 Balcombe Road;
- (p)
construction of a new 170m retaining wall, between the southern side of Balcombe Road underbridge and South Terminal Roundabout (Retaining Wall 38);
- (q)
construction of a new 160m long retaining wall, between Gatwick Spur Eastbound Merge and Gatwick Spur (Retaining Wall 26);
- (r)
construction of a new 165m long retaining wall, between Gatwick Spur Westbound Diverge and Gatwick Spur (Retaining Wall 23);
- (s)
construction of a new flyover structure (South Terminal Flyover Bridge), to carry the Gatwick Spur/Airport Way dual carriageway over South Terminal Roundabout;
- (t)
construction of a new 160m long retaining wall, between Airport Way Eastbound Diverge and Airport Way (Retaining Wall 25);
- (u)
construction of a new 180m long retaining wall, between Airport Way Westbound Merge and Airport Way (Retaining Wall 24);
- (v)
construction of a new 370m long retaining wall, on the southern side of the Airport Way Westbound Merge, East of the Airport Way Rail Bridge (Retaining Wall 22);
Notes on Schedule 1
Commencement
- I1
Sch. 1 in force at 12.10.2025, see art. 1