Paragraph 10A Installation to be treated as ceasing operation: regulator’s noticeF1

(1)

Where the regulator gives a notice under sub-paragraph (2) to the operator of an installation at which all regulated activities authorised by the permit have ceased to be carried out, the installation must be treated as having ceased operation for the purposes of both this Order and the Activity Level Changes Regulation on the last day on which a regulated activity was carried out at the installation.

(2)

A notice under this sub-paragraph is a notice that states that the regulator considers that all regulated activities authorised by the permit have permanently ceased to be carried out at the installation.

(3)

The regulator may give a notice under sub-paragraph (2) if, at any time during which all regulated activities authorised by the permit have ceased to be carried out at an installation, the operator fails to satisfy the regulator (whether in accordance with the cessation condition referred to in paragraph 4(8) or otherwise) that each of the following conditions is met in respect of the installation—

(a)

the operator intends for one or more of the regulated activities authorised by the permit to resume at the installation;

(b)

either—

(i)

the installation is technically capable of resuming those regulated activities without physical changes being made; or

(ii)

the operator intends for the technical capability required for those regulated activities to resume to be restored at the installation.

(4)

To avoid doubt, nothing in this paragraph prevents the regulator from giving a notice under sub-paragraph (2) in circumstances in which the regulator has previously confirmed that the regulator was, at that time, satisfied that the conditions referred to in sub-paragraph (3) were met in respect of the installation.

(5)

The regulator may withdraw a notice under sub-paragraph (2) at any time by giving notice of the withdrawal to the operator.

Annotations

Textual amendments

F1

Sch. 6 para. 10A inserted (6.2.2025) by The Greenhouse Gas Emissions Trading Scheme (Amendment) Order 2025 (S.I. 2025/100), arts. 2(2), 8(4)