The Greenhouse Gas Emissions Trading Scheme Order 2020
S.I. 2020/1265 · Made 11 November 2020 · Extends to United Kingdom
Climate Change
Made 11th November 2020
Coming into force in accordance with article 2
At the Court at Windsor Castle, the 11th day of November 2020
Present,
The Queen's Most Excellent Majesty in Council
This Order is made in exercise of the powers conferred by sections 44, 46(3), 54 and 90(3) of, and Schedule 2 and paragraph 9 of Schedule 3 to, the Climate Change Act 2008 M1.
In accordance with paragraph 10 of Schedule 3 to that Act, before the recommendation to Her Majesty in Council to make this Order was made—
- (a)
the advice of the Committee on Climate Change, including on the amount of the limit referred to in section 48(2) of that Act, was obtained and taken into account; and
- (b)
such persons likely to be affected by the Order as the Secretary of State, the Scottish Ministers, the Welsh Ministers and the Department of Agriculture, Environment and Rural Affairs considered appropriate were consulted.
In accordance with paragraph 11 of that Schedule, a draft of the instrument containing this Order was laid before Parliament, the Northern Ireland Assembly, the Scottish Parliament and Senedd Cymru and approved by resolution of each House of Parliament, the Northern Ireland Assembly, the Scottish Parliament and Senedd Cymru.
Accordingly, Her Majesty, by and with the advice of Her Privy Council, makes the following Order:C1
Annotations to the whole text
Marginal citations
- M1
Modifications
- C1
Order modified (1.1.2024) by The Greenhouse Gas Emissions Trading Scheme (Amendment) Order 2023 (S.I. 2023/850), arts. 2, 20(8)
Contents
- Part 1: Preliminary
- 1Citation
- 2Commencement
- 3Extent
- 4Interpretation
- 4AMeaning of FA installation, etc.
- 5Meaning of operator
- 6Meaning of aircraft operator
- 7Exempt commercial air transport operators
- 8Exempt non-commercial air transport operators
- 8AMeaning of registry administrator
- 9Meaning of regulator
- 10Meaning of regulator: installations
- 11Meaning of regulator: aircraft operators
- 12Aircraft operator: change in regulator
- 13Aircraft operator: change in registered office
- 13AMeaning of regulator: maritime operators
- 14Meaning of UK ETS authority, etc.
- 15Applications, notices, etc.
- Part 2: Basic elements of the UK ETS
- Chapter 1: Establishment of the UK ETS and requirement for review
- 16UK Emissions Trading Scheme
- 17Review of UK ETS
- Chapter 2: Allowances and caps
- 18Allowances
- 19Cap for trading period
- 20Cap for scheme years
- 21Cap: hospital and small emitter reduction factors
- 22Cap: base for scheme years
- 23Trading in allowances
- 23AFlexible reserve
- Chapter 3: Monitoring, reporting and verification
- 24Monitoring and reporting of emissions
- 25Verification of data and accreditation of verifiers
- Chapter 4: Registry
- 25ARegistry
- Part 3: Installations
- 26Installations: requirement for permit to carry out regulated activity
- 27Installations: requirement to surrender allowances
- 27AInstallations: information to be submitted on or before 30 June 2025 where no application for free allocation, etc. is made
- Part 4: Aviation
- 28Application for emissions monitoring plans
- 29Issue of emissions monitoring plans
- 30Refusal of application for emissions monitoring plans
- 31Variation of emissions monitoring plans
- 32Monitoring emissions and emissions monitoring plan conditions
- 33Reporting aviation emissions
- 34Surrender of allowances by aircraft operators
- Part 4ZA: Maritime
- 34ZAApplication of the Order to maritime
- Part 4A: Free Allocation
- Chapter 1: Installations
- 34AAllocation tables for 2021-2025 and 2027-2030 allocation periods
- 34AAAllocation table for 2026 allocation period
- 34BAllocation tables: supplementary
- 34CAllocation tables: updates
- 34DAllocation tables: publication, etc.
- 34EAllocation of allowances
- 34FNo allocation unless monitoring methodology plan approved
- 34GNew entrants' reserve
- 34HInstallations: errors in applications for free allocation, etc.
- 34HAFree allocation for former hospital or small emitters and ultra-small emitters
- Chapter 2: Aviation
- 34IInterpretation
- 34JMeaning of historical aviation activity level and attributable
- 34KAviation: entitlement to free allocation in 2021-2025 allocation period
- 34LApplication for aviation free allocation entitlement
- 34MProcessing of applications and calculation of aviation free allocation entitlement
- 34NAviation allocation table for 2021-2025 allocation period
- 34OAviation: allocation of allowances for 2021-2025 allocation period
- 34PPermanent cessation of aviation activity
- 34QTransfers of aviation free allocation entitlement
- 34RErrors in aviation allocation table
- Chapter 3: Common provisions
- 34SReturn of allowances: installations
- 34TReturn of allowances: aviation
- 34UReturn of allowances: notice to registry administrator
- 34VReturn of allowances: notice to operator, etc.
- 34WNotice to withhold allowances
- Part 5: Charging
- 35Charges
- 36Charging scheme: regulators
- 36ACharging scheme: registry administrator
- 37Remittance of charges
- Part 6: Monitoring compliance
- 38Authorised persons
- 39Inspections
- 40Powers of entry, etc.
- 41Warrants
- 42Admissible evidence
- 43Legal professional privilege
- Part 7: Enforcement
- Chapter 1: Enforcement notices , deficit notices and determination of emissions by regulator
- 44Enforcement notices
- 44ADeficit notices
- 45Determination of reportable emissions or aviation emissions by regulator
- 45ADetermination of maritime emissions by regulator
- 45BDetermination of emissions figure for surrender by regulator
- Chapter 2: Civil penalties
- 46Carbon price
- 47Penalty notices
- 48Penalty notices: supplementary
- 49Regulator must publish names of persons subject to civil penalty under article 52
- 50Installations: carrying out regulated activity without permit contrary to article 26
- 51Installations: failure to comply with conditions of permit, etc.
- 52Failure to surrender allowances
- 53Installations: failure to transfer or surrender allowances where underreporting discovered after transfer
- 54Hospitals and small emitters: exceeding emissions target
- 55Hospitals and small emitters: failure to pay civil penalty for exceeding emissions target
- 56Hospitals and small emitters: under-reporting of emissions
- 57Hospitals and small emitters: failure to notify when ceasing to meet criteria
- 58Installations: failure to apply to surrender permit
- 59Ultra-small emitters: reportable emissions exceeding maximum amount
- 60Ultra-small emitters: failure to notify where reportable emissions exceed maximum amount
- 60AInstallations: failure to submit information under article 27A
- 61Aviation: failure to apply or make revised application for emissions monitoring plan
- 62Aviation: failure to comply with condition of emissions monitoring plan
- 63Aviation: failure to monitor aviation emissions
- 64Aviation: failure to report aviation emissions
- 64AFailure to comply with notice to return allowances
- 64BMaritime: failure to apply or make revised application for emissions monitoring plan
- 64CMaritime: failure to comply with condition of emissions monitoring plan
- 64DMaritime: failure to monitor maritime emissions
- 64EMaritime operator: failure to report maritime emissions
- 65Failure to comply with enforcement notice ......
- 65AFailure to comply with deficit notice
- 66Failure to comply with information notice
- 67Providing false or misleading information, etc.
- 68Inspection: refusal to allow access to premises
- Part 8: Appeals
- 69Interpretation
- 70Right of appeal
- 71Appeal body
- 72Effect of appeals
- 73Determination of appeals
- 74Procedure for appeals
- Part 9: Miscellaneous
- 75Information notices
- 75ANational authority may require regulator, etc. to provide information
- 75BRestriction on disclosing information
- 75BAPower to publish UK ETS information
- 75CNational security
- 76Crown application
- 77Transitional provisions
- Signature
- Schedule 1: Aviation activity
- 1Aviation activity
- 2Excluded flights
- Schedule 2: Meaning of installation and regulated activity
- 1Interpretation
- 2Meaning of installation
- 3Meaning of regulated activity, etc.
- Schedule 2A: MARITIME
- Part 1: PRELIMINARY
- 1Introductory
- 2Interpretation
- Part 2: KEY CONCEPTS AND OBLIGATIONS
- 3Meaning of “maritime operator”
- 4Notification of change of responsibility
- 5Ships to which this Schedule applies
- 6Meaning of “port of call”
- 7Meaning of “maritime activity”
- 8Excluded activities
- 9Applications for emissions monitoring plans
- 10Issue of emissions monitoring plans
- 11Refusal of application for emissions monitoring plans
- 12Variation of emissions monitoring plans
- 13Monitoring of emissions and emissions monitoring plan condition
- 14Reporting of emissions
- 15Surrender of allowances by maritime operators
- 16Maritime monitoring and reporting principles
- Part 3: CONTENTS OF THE EMISSIONS MONITORING PLAN
- 17Paragraph 17
- Part 4: MONITORING ARRANGEMENTS
- 18Monitoring on a per-voyage basis
- 19Simplified monitoring for voyages
- 20Monitoring in-port activities
- 21Monitoring methods for maritime emissions
- 22Method A: BDN and periodic stocktakes of fuel tanks
- 23Method B: Bunker fuel tank monitoring on board
- 24Method C: Flow meters for applicable combustion processes
- 25Method D: Direct maritime emissions measurement
- 26Reporting on improvement to the monitoring methodology
- Part 5: DATA MANAGEMENT AND CONTROL
- 27Control system
- 28Quality assurance of relevant measurement equipment
- 29Internal reviews and validation of data
- 30Corrections and corrective action
- 31Control of out-sourced processes
- 32Effectiveness of control system
- 33Data gaps
- 34Records and documentation
- Part 6: CALCULATION OF MARITIME EMISSIONS
- 35Formulae to be used when calculating maritime emissions
- 36Default values for emission factors
- 37Emissions reduction claims
- Part 7: REPORTING REQUIREMENTS
- 38Contents of the annual emissions report
- Part 8: VERIFICATION AND ACCREDITATION
- Chapter 1: GENERAL PROVISIONS
- 39Introductory
- 40Interpretation
- 41General obligations for the verifiers
- 42Presumption of conformity
- Chapter 2: VERIFICATION OF ANNUAL EMISSIONS REPORTS
- 43Pre-contractual obligations
- 44Time allocation
- 45Information to be provided by maritime operators
- 46Strategic analysis
- 47Risk analysis to be carried out by verifiers
- 48Verification plan
- 49Verification process
- 50Analytical procedures
- 51Verification of reported data
- 52Verification of methods applied for missing data
- 53Materiality level
- 54Site visits
- 55Virtual site visits
- 56Addressing misstatements, non-conformities and non-compliance
- 57Conclusions of the verification
- 58Recommendations for improvement
- 59Verification report
- 60Limitation of scope
- 61Independent review
- Chapter 3: REQUIREMENTS FOR VERIFIERS
- 62Continued competence process
- 63Verification teams
- 64Competence requirements for UK ETS auditors and UK ETS lead auditors
- 65Competence requirements for independent reviewers
- 66Use of technical experts
- 67Procedures for verification activities
- 68Internal verification documentation
- 69Records and communication
- 70Impartiality and independence
- Chapter 4: ACCREDITATION OF VERIFIERS
- 71Accreditation of verifiers
- 72Scope of accreditation
- 73Objectives of the accreditation process
- 74Requests for accreditation
- 75Assessment
- 76Decision on accreditation and accreditation certificate
- 77Annual surveillance
- 78Reassessment
- 79Extraordinary assessment
- 80Administrative measures
- Chapter 5: REQUIREMENTS FOR THE NATIONAL ACCREDITATION BODY
- 81Requirements for national accreditation bodies
- 82Independence and impartiality
- 83Assessment team
- 84Competence requirements for assessors
- 85Technical experts
- 86Complaints
- 87Records and documentation
- 88Access to information and confidentiality
- Chapter 6: INFORMATION EXCHANGE
- 89Information exchange and focal points
- 90Accreditation work programme and management report
- 91Information exchange on administrative measures
- 92Information exchange by the regulator in respect of a maritime operator
- 93Databases of accredited verifiers
- 94Notification by verifiers
- Part 9: DETERMINATION OF VALUES FOR EMISSION FACTORS UNDER PARAGRAPH 36(4)
- 95Emission factors based on analyses
- 96Sampling plan
- 97Use of laboratories
- 98Frequencies for analyses
- Schedule 3: Applications, notices, etc.
- Part 1: Applications, notices, etc. submitted to regulators
- 1Submission of applications, notices, etc. to regulators
- 2Determination of applications by regulators
- Part 2: Notices, etc. given by regulators, national authorities , UK ETS authority or registry administrator
- 3Service of notices, etc.
- 4Service on certain Crown operators
- Schedule 4: Modifications to Monitoring and Reporting Regulation 2018
- 1Paragraph 1
- 2Paragraph 2
- 3Paragraph 3
- 4Paragraph 4
- 5Paragraph 5
- 6Paragraph 6
- 7Paragraph 7
- 8Paragraph 8
- 9Paragraph 9
- 10Paragraph 10
- 11Paragraph 11
- 12Paragraph 12
- 13Paragraph 13
- 14Paragraph 14
- 15Paragraph 15
- 16Paragraph 16
- 17Paragraph 17
- 18Paragraph 18
- 19Paragraph 19
- 20Paragraph 20
- 20AParagraph 20A
- 21Paragraph 21
- 22Paragraph 22
- 23Paragraph 23
- 24Paragraph 24
- 25Paragraph 25
- 26Paragraph 26
- 27Paragraph 27
- 28Paragraph 28
- 29Paragraph 29
- 30Paragraph 30
- 31Paragraph 31
- 31AParagraph 31A
- 32Paragraph 32
- 33Paragraph 33
- 34Paragraph 34
- 35Paragraph 35
- 36Paragraph 36
- 37Paragraph 37
- 38Paragraph 38
- 38AParagraph 38A
- 38BParagraph 38B
- 39Paragraph 39
- 40Paragraph 40
- Schedule 5: Modifications to Verification Regulation 2018
- 1Paragraph 1
- 2Paragraph 2
- 3Paragraph 3
- 4Paragraph 4
- 5Paragraph 5
- 6Paragraph 6
- 7Paragraph 7
- 8Paragraph 8
- 9Paragraph 9
- 10Paragraph 10
- 11Paragraph 11
- 12Paragraph 12
- 13Paragraph 13
- 14Paragraph 14
- 15Paragraph 15
- 16Paragraph 16
- 17Paragraph 17
- 18Paragraph 18
- 19Paragraph 19
- 20Paragraph 20
- 21Paragraph 21
- 22Paragraph 22
- 23Paragraph 23
- 24Paragraph 24
- 25Paragraph 25
- 26Paragraph 26
- 27Paragraph 27
- 28Paragraph 28
- 29Paragraph 29
- 30Paragraph 30
- 31Paragraph 31
- 32Paragraph 32
- 33Paragraph 33
- 34Paragraph 34
- 35Paragraph 35
- 36Paragraph 36
- 37Paragraph 37
- 38Paragraph 38
- 39Paragraph 39
- 40Paragraph 40
- 41Paragraph 41
- 42Paragraph 42
- 43Paragraph 43
- 44Paragraph 44
- 45Paragraph 45
- 46Paragraph 46
- 47Paragraph 47
- 48Paragraph 48
- 49Paragraph 49
- 50Paragraph 50
- 51Paragraph 51
- 52Paragraph 52
- 53Paragraph 53
- 54Paragraph 54
- 55Paragraph 55
- 56Paragraph 56
- Schedule 5A: Registry
- Part 1: Preliminary
- 1Interpretation
- 2Submission of applications, etc. to registry administrator
- 3Account holders: fit and proper person
- 4Authorised representatives: fit and proper person
- Part 2: Establishment and operation of registry
- 5Registry
- 6Operation of registry
- 6AReportable emissions, aviation emissions and maritime emissions to be recorded in the registry
- 7Suspension of registry due to security concerns
- 8Suspension of registry for technical reasons
- 8AExemption from liability
- Part 3: Accounts
- Chapter 1: Opening accounts
- 9Central accounts
- 10Auction delivery account
- 11Operator holding accounts
- 12Transfer of operator holding accounts
- 13Aircraft operator holding accounts
- 13AMaritime operator holding accounts
- 14Trading accounts
- Chapter 2: Account representatives
- 15Primary contacts and alternative primary contacts
- 16Appointment of authorised representatives
- 17Change in account permission of authorised representatives
- 18Suspension of access to registry of authorised representatives
- 19Removal of authorised representatives
- Chapter 3: Transfers of allowances
- 20Transfers between accounts
- 21Transfer cancellations
- 22Transfer reversals
- 23Deletion of allowances
- 24Surrender of allowances
- Chapter 4: Suspension and closure of accounts
- 25Suspension of accounts
- 26Closure of central accounts and auction delivery account
- 27Closure of operator holding accounts
- 28Closure of aircraft operator holding accounts
- 28AClosure of maritime operator holding accounts
- 29Closure of trading accounts
- 30Balance in accounts to be closed
- Part 4: Publication of information from registry
- 31Information about accounts: operator and aircraft operator holding accounts and trading accounts
- 32Information about accounts: operator holding accounts
- 33Information about accounts: aircraft operator holding accounts
- 33AInformation about accounts: maritime operator holding accounts
- 34Information about transfers of allowances
- Schedule 6: Permits
- Part 1: Application for greenhouse gas emissions permits
- 1Greenhouse gas emissions permits: application
- 2Greenhouse gas emissions permits: content of application
- 3Greenhouse gas emissions permits: issue of permit
- 4Greenhouse gas emissions permits: content of permit
- 5Greenhouse gas emissions permits: effect of permit, etc.
- Part 2: Greenhouse gas emissions permits and hospital or small emitter permits
- 6Variation of permits
- 7Transfer of permits: application
- 8Transfer of permits: contents of application
- 9Transfer of permits: grant of application
- 10Transfer of permits: underreporting discovered after transfer
- 10AInstallation to be treated as ceasing operation: regulator’s notice
- 11Surrender of permits
- 12Revocation of permits
- Schedule 7: Hospitals and small emitters
- Part 1: Preliminary
- 1Interpretation
- 2Meaning of installation that primarily provides services to a hospital in scheme year
- Part 2: Hospital or small emitter status
- 3Hospital or small emitter status
- 4Hospital or small emitter status: former ultra-small emitters
- 5Obtaining hospital or small emitter status for 2026-2030 period
- 6Obtaining hospital or small emitter status for 2026-2030 period: Conditions A, B and C
- Part 3: Hospital or small emitter permits
- 7Hospital or small emitter permits: application
- 8Hospital or small emitter permits: content of application
- 9Hospital or small emitter permits: issue of permit
- 10Hospital or small emitter permits: conversion of existing greenhouse gas emissions permit for 2026-2030 period
- 11Hospital or small emitter permits: content of permit
- 12Hospital or small emitter permits: effect of permit, etc.
- 13Hospitals and small emitters: modifications to Monitoring and Reporting Regulation 2018
- 14Former ultra-small emitters: hospital or small emitter permits coming into force after beginning of scheme year
- Part 4: Emissions targets
- 15Emissions targets other than for hospital-qualifying installations may not exceed maximum amount
- 16Emissions targets for 2021-2025 allocation period
- 17Emissions targets for 2026-2030 period
- 18Emissions targets: calculation of later targets where initial targets based on estimates
- 19Emissions targets: hospital or small emitters must not exceed targets
- 19ACapacity increases: application to increase emissions targets
- 19BCapacity increases: content of application
- 19CCapacity increases: grant of application
- 19DCapacity increases: net change in installed capacity at installation since reference date
- 19ECapacity increases: increase in emissions targets for scheme years
- 19FCapacity increases: combined capacity utilisation factor
- 19GCapacity increases: interpretation
- 20Emissions targets: banking overachieved target
- 21Emissions targets: targets for 2026-2030 period for hospital or small emitters in 2021-2025 allocation period
- 22Emissions targets: errors
- 22APublication of emissions targets and reportable emissions
- Part 5: End of hospital or small emitter status
- 23End of hospital or small emitter status: ceasing to meet criteria
- 23AEnd of hospital or small emitter status: voluntary exit of status for 2024 and 2025 scheme years
- 23BEnd of hospital or small emitter status: voluntary exit of status for 2027-2030 allocation period
- 24Conversion notices
- 25End of hospital or small emitter status: ceasing to meet criteria: publication
- 26End of hospital or small emitter status: end of allocation period
- Schedule 8: Ultra-small emitters
- 1Interpretation
- 2Ultra-small emitter status
- 3Obtaining ultra-small emitter status for 2026-2030 period
- 4Obtaining ultra-small emitter status for 2026-2030 period: modifications to Verification Regulation 2018 for ultra-small emitters in 2021-2025 allocation period
- 5Duty to monitor reportable emissions, etc.
- 6Reportable emissions must not exceed maximum amount
- 7End of ultra-small emitter status: ceasing to meet criteria
- 7AEnd of ultra-small emitter status: voluntary exit of status for 2027-2030 allocation period
- 8End of ultra-small emitter status: publication
- Schedule 8A: Free allocation for former hospital or small emitters and ultra-small emitters
- 1Interpretation
- 2Application
- 3Monitoring methodology plan to be submitted for approval , etc.
- 4Calculation and approval of final allocation
- 5Modifications to Activity Level Changes Regulation
- Schedule 9: Appeals to Scottish Land Court
- 1Paragraph 1
- 2Paragraph 2
- 3Paragraph 3
- 4Paragraph 4
- Schedule 10: Appeals to Planning Appeals Commission (Northern Ireland)
- 1Paragraph 1
- 2Paragraph 2
- 3Paragraph 3
- 4Paragraph 4
- Schedule 11: Transitional provisions: installations
- 1Permits under GGETSR 2012
- 2Applications for permits, etc. under GGETSR 2012
- 3Schedule does not apply to permits for relevant Northern Ireland electricity generators, etc.
- Explanatory note