Regulation 5 Requirements relating to metersF1
United Kingdom
Where F2a meter is installed, the heat supplier must ensure that the meter accurately measures, memorises and displays the consumption of heating, cooling or hot water by a final customer.
Annotations
Textual amendments
- F1
Reg. 5 substituted (20.4.2015) by The Heat Network (Metering and Billing) (Amendment) Regulations 2015 (S.I. 2015/855), regs. 1, 5
- F2
Words in reg. 5 substituted (27.11.2020) by The Heat Network (Metering and Billing) (Amendment) Regulations 2020 (S.I. 2020/1221), regs. 1(2), 7