Paragraph 3 F1
United Kingdom
The projected energy savings over the 10 year period subsequent to installation for the purpose of paragraph 1 is—
20% of the F2heat or cooling demand in the case of a building consisting mainly of private dwellings, except for the one year period subsequent to installation when the projected value to be applied is 10% of the heat or cooling demand; and
10% of the heat or cooling demand in the case of any other building except for the one year period subsequent to installation where the projected value to be applied is 5% of the heat or cooling demand.
Annotations
Textual amendments
- F1
Sch. 1 omitted (E.W.S.) (27.1.2026) by virtue of The Heat Networks (Market Framework) (Great Britain) (Amendment) Regulations 2026 (S.I. 2026/7), regs. 2(2)(c), 12(12)
- F2
Words in Sch. 1 para. 3 substituted (27.11.2020) by The Heat Network (Metering and Billing) (Amendment) Regulations 2020 (S.I. 2020/1221), regs. 1(2), 14(5)
Notes on Schedule 1
Textual amendments
- F2
Word in Sch. 1 heading substituted (27.11.2020) by The Heat Network (Metering and Billing) (Amendment) Regulations 2020 (S.I. 2020/1221), regs. 1(2), 14(2)
- F3
Words in Sch. 1 substituted (27.11.2020) by The Heat Network (Metering and Billing) (Amendment) Regulations 2020 (S.I. 2020/1221), regs. 1(2), 14(3)