Paragraph 4 F1
United Kingdom
It will be considered technically feasible to install meters in a building consisting mainly of private dwellings unless—
there is more than one entry point for the pipes of the district heat network or communal heating into each private dwelling within that building or the entry point for the pipes is unknown; or
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Annotations
Textual amendments
- F1
Sch. 1 omitted (E.W.S.) (27.1.2026) by virtue of The Heat Networks (Market Framework) (Great Britain) (Amendment) Regulations 2026 (S.I. 2026/7), regs. 2(2)(c), 12(12)
- F2
Sch. 1 para. 4(b) omitted (27.11.2020) by virtue of The Heat Network (Metering and Billing) (Amendment) Regulations 2020 (S.I. 2020/1221), regs. 1(2), 14(6)
Notes on Schedule 1
Textual amendments
- F2
Word in Sch. 1 heading substituted (27.11.2020) by The Heat Network (Metering and Billing) (Amendment) Regulations 2020 (S.I. 2020/1221), regs. 1(2), 14(2)
- F3
Words in Sch. 1 substituted (27.11.2020) by The Heat Network (Metering and Billing) (Amendment) Regulations 2020 (S.I. 2020/1221), regs. 1(2), 14(3)