Paragraph 1 I1
England, Wales and Scotland
In this Schedule—
| “alignment drawing” | means the drawing no. HP/SL 302 Revision A in the deposited plans and sections showing the indicative alignments of the silos and the sand shed; |
| “commencement” | means in relation to the construction of the development, the carrying out of a material operation and cognate terms shall be construed accordingly; |
| “development consent order” | means an order granting development consent under section 114 of the Planning Act 2008f1; |
| “the HEO land” | means the land, foreshore and seabed within the limits of deviation shown on the deposited plans and sections; |
| “hopper” | means a batching silo for the transfer of cement or similar materials from the storage silos to vehicles; |
“the onshore area” | means that part of the HEO land above the level of low water; |
| “sand shed” | means the covered area for the storage of sand to be constructed as part of Work No. 4; |
| “silos” | means the silos to be constructed as part of Work No. 5; |
| “the site” | means so much of the HEO land as is above the level of high water; |
| “site preparation works” | means the development and works authorised by the site preparation works permission; and |
| “site preparation works permission” | means the planning permission granted on 27th January 2012 by the local planning authority (Council reference 3/32/10/037). |
Annotations
Commencement
- I1
Sch. 1 Pt. 1 para. 1 in force at 16.8.2012, see art. 1(1)
Footnotes
- f1