OpenLegislation

Paragraph 2 Design parametersI1

England, Wales and Scotland

The total length of the cables and the volume of their cable protection (including cable crossings) must not exceed the following—

WorkLengthCable protection
Work Nos. 2 and 3 and 5744 kilometres1,068,500 cubic metres

Annotations

Commencement

I1

Sch. 12 Pt. 2 para. 2 in force at 3.8.2023, see art. 1

Notes on the whole SI

Textual amendments

F1

Word in preamble substituted (31.1.2024) by The Hornsea Four Offshore Wind Farm (Correction) Order 2024 (S.I. 2024/117), art. 1(2), Sch.