OpenLegislation

Paragraph 3 Design parametersI1

England, Wales and Scotland

(1)

The total length of the cables in Work No. 2(d) and (e) and the volume of their cable protection when combined with the cable authorised under Work No. 1(c) of the deemed marine licence granted under Schedule 11 of the Order must not exceed the following—

LengthCable protection
1,344 kilometres1,449,000 cubic metres
(2)

No more than 5% of the length of cables within Work No. 2(e) and Work No. 3(b) falling within the Smithic Bank, being the area bounded by the following coordinates, shall be subject to cable protection, unless otherwise agreed in writing with the MMO—

Coordinate IDEasting (ETRS89 UTM31N)Northing (ETRS89 UTM31N)Longitude (WGS84)Latitude (WGS84)
1298274.675990918.71-0.0799054.02704
2298127.195990333.27-0.0817554.02172
3294845.625990773.47-0.1320754.02438
4294845.605990773.48-0.1320754.02438
5293307.255990979.83-0.1556554.02562
6293307.235990979.84-0.1556554.02562
7293234.225990989.63-0.1567754.02568
8293248.015991617.59-0.1569954.03132
9293357.035992381.64-0.1558554.03822
10293485.995993033.45-0.1543254.04412
11293595.225993351.56-0.1528854.04702
12295812.895993972.30-0.1194754.05347
13295814.175993972.66-0.1194554.05348
14295815.455993973.03-0.1194354.05348
15296409.985994139.44-0.1104854.05521
16296416.885994141.37-0.1103754.05523
17297196.585994359.61-0.0986354.05749
18297201.625994361.02-0.0985554.05751
19297686.585994496.76-0.0912454.05892
20297703.955994501.62-0.0909854.05897
21297879.775994550.84-0.0883354.05948
22297897.335994556.10-0.0880754.05953
23297914.685994562.01-0.0878154.05959
24297931.815994568.54-0.0875554.05966
25297948.695994575.70-0.0873054.05973
26298025.955994610.17-0.0861454.06007
27298102.195994644.18-0.0850054.06040
28298382.325994769.14-0.0808154.06163
29298391.645993962.56-0.0801354.05440
30298294.205992800.25-0.0808554.04393
31298298.275991819.11-0.0801354.03513
32298274.675990918.71-0.0799054.02704
(3)

No cable protection may be employed within 350 metres seaward of MLWS tidal datum, measured as a straight line.

(4)

The cables and cable circuits comprised in the authorised development must not exceed the parameters set out in the pro–rata annex.

Annotations

Commencement

I1

Sch. 12 Pt. 2 para. 3 in force at 3.8.2023, see art. 1

Notes on the whole SI

Textual amendments

F1

Word in preamble substituted (31.1.2024) by The Hornsea Four Offshore Wind Farm (Correction) Order 2024 (S.I. 2024/117), art. 1(2), Sch.