OpenLegislation

Paragraph 12 Fencing and other means of enclosureI1

England and Wales

(1)

No phase of the connection works may commence until for that phase written details of all proposed permanent fences, walls or other means of enclosure of the connection works have been submitted to and approved by the relevant planning authority.

(2)

Any temporary fences, walls or other means of enclosure must be provided in accordance with the outline code of construction practice.

(3)

All construction sites must remain securely fenced in accordance with the code of construction practice at all times during construction of the relevant phase of the connection works.

(4)

Any temporary fencing must be removed on completion of the relevant phase of the connection works.

(5)

Any approved permanent fencing in relation to an onshore HVDC/HVAC substation or onshore HVAC booster station must be completed before that onshore HVDC/HVAC substation or onshore HVAC booster station is brought into use and maintained for the operational lifetime of the onshore HVDC/HVAC substation or onshore HVAC booster station.

Annotations

Commencement

I1

Sch. 1 Pt. 3 para. 12 in force at 22.1.2021, see art. 1

Notes on the whole SI

Textual amendments

F1

Preamble: bracket omitted (21.5.2021) by virtue of The Hornsea Three Offshore Wind Farm (Correction) Order 2021 (S.I. 2021/599), art. 1(2), Sch.