OpenLegislation

Paragraph 1 Design parametersI1

England and Wales

(1)

The total number of offshore electrical installations shall not exceed 18, and shall consist of no more than—

(a)

12 offshore type 1 substations;

(b)

four offshore type 2 substations;

(c)

four offshore HVAC booster stations; and

(d)

six offshore subsea HVAC booster stations.

Annotations

Commencement

I1

Sch. 12 Pt. 2 para. 1 in force at 22.1.2021, see art. 1

Notes on the whole SI

Textual amendments

F1

Preamble: bracket omitted (21.5.2021) by virtue of The Hornsea Three Offshore Wind Farm (Correction) Order 2021 (S.I. 2021/599), art. 1(2), Sch.