The Immingham Open Cycle Gas Turbine (Amendment) (No. 2) Order 2024
S.I. 2024/446 · Made 27 March 2024
Infrastructure Planning
Made 27th March 2024
Coming into force 28th March 2024
An application has been made, under paragraph 2 of Schedule 6 to the Planning Act 2008f1, to the Secretary of State in accordance with the Infrastructure Planning (Changes to, and Revocation of, Development Consent Orders) Regulations 2011f2 for a non-material change to the Immingham Open Cycle Gas Turbine Order 2020f3.
The Secretary of State, having considered the application, the responses to the publicity and consultation required by regulations 6 and 7 of the Infrastructure Planning (Changes to, and Revocation of, Development Consent Orders) Regulations 2011, has decided to make the changes on terms that in the opinion of the Secretary of State are not materially different from those proposed in the application.
Accordingly, the Secretary of State, in exercise of the powers in paragraphs 2(1) and (9) of Schedule 6 to the Planning Act 2008, makes the following Order—
Annotations to the whole text
Footnotes
- f1
-
2008 c. 29. Paragraph 2 was amended by paragraph 4 of Schedule 8 to the Marine and Coastal Access Act 2009 (c. 23), by paragraphs 1 and 72 of Schedule 13 to the Localism Act 2011 (c. 20), and by section 28 of the infrastructure Act 2015 (c. 7). There are other amendments to the Act that are not relevant to this Order.
- f2
-
S.I. 2011/2055, as amended by S.I. 2012/635, S.I. 2013/522, S.I. 2015/760, S.I. 2017/314, S.I. 2017/524, S.I. 2018/378, S.I. 2019/734, S.I. 2020/1534 and S.I. 2020/764.
- f3
Contents
- 1Citation and commencement
- 2Amendment to the Immingham Open Cycle Gas Turbine Order 2020
- 3Amendment to Schedule 12 (design parameters)
- Signature
- Explanatory note
1Citation and commencement
This Order may be cited as the Immingham Open Cycle Gas Turbine (Amendment) (No. 2) Order 2024 and comes into force on 28th March 2024.
2Amendment to the Immingham Open Cycle Gas Turbine Order 2020
The Immingham Open Cycle Gas Turbine Order 2020 is amended in accordance with this Order.
3Amendment to Schedule 12 (design parameters)
For the table in Schedule 12, substitute—
“
Table 9
(1)
Building or structure
(2)
Maximum length (metres)
(3)
Maximum width (metres)
(4)
Maximum height (metres above 0 meters above ordnance datum)
(5)
Maximum diameter (metres)
Single gas turbine and generator 31 20 20 - Gas turbine building 50 35 29 - Exhaust stack - - 56 12 Air intakes 24 16 40 - Fin-fan cooler 30 15 17 - Control room, workshops, stores 35 20 16 - Demineralised tank, firewater tank - - 32 24 ”
Signature
Signed by authority of the Secretary of State for Energy Security and Net Zero
David Wagstaff
Deputy Director – Energy Infrastructure Planning
Department for Energy Security and Net Zero
27th March 2024
Explanatory note
(This note is not part of the Order)
This Order amends the Immingham Open Cycle Gas Turbine Order 2020, a development consent order under the Planning Act 2008, following an application made in accordance with the Infrastructure Planning (Changes to, and Revocation of, Development Consent Orders) Regulations 2011 for a non-material change under paragraph 2 of Schedule 6 to the Planning Act 2008.