Work No. 1 – OCGT power station, being an open cycle gas turbine generating station with a gross capacity of up to 299 megawatts, comprising—
gas turbine and turbine hall buildings;
electrical generator;
stack;
auxiliary cooling equipment or system;
gas turbine air intake filters;
banks of finfan coolers;
nitrogen oxide emissions control equipment;
transformers;
a switchyard, associated switch gear and ancillary equipment;
a gas receiving area, gas control facilities and gas reception building;
lubricating oil, hydraulic oil and chemical storage tanks and equipment;
continuous emissions monitoring system;
raw water and fire water storage tanks;
water treatment facilities, demineralised water treatment works, including storage tanks;
oily water and waste water treatment plant building and basin;
fire fighting equipment, buildings and distribution pipework;
permanent plant laydown area;
auxiliary plant, buildings, enclosures and structures;
mechanical, electrical, gas, telecommunications and water networks, pipework, cables, racks, infrastructure, instrumentation and utilities, including connections between parts of this Work No. 1 and Work Nos 4, 5 and 6;
workshop buildings and stores;
electrical, control, administration and welfare buildings; F1...
storm water attenuation system; F2and
synchronous condenser.
Annotations
Textual amendments
- F1
Word in Sch. 1 omitted (1.2.2023) by The Immingham Open Cycle Gas Turbine (Amendment) Order 2023 (S.I. 2023/119), arts. 1, 4(a)
- F2
Words in Sch. 1 inserted (1.2.2023) by The Immingham Open Cycle Gas Turbine (Amendment) Order 2023 (S.I. 2023/119), arts. 1, 4(b)