Introductory text

England and Wales

Infrastructure Planning, Wales

Made 16 June 2025

Laid before Senedd Cymru 17 June 2025

Coming into force 15 December 2025

The Welsh Ministers, in exercise of the powers conferred on them by sections 29(1)(h), (2), (3) and (5), 30(2) and (3), 32(4) and (5), 34(2)(c), (3) and (5), 35(1)(a), 36(4)(b), 37(4)(b), 60(2)(d), (4)(d) and (6), 62(3)(d), 129(3)(a) and (4), 132(2), 140(1) and (2)f1, 141(2) and 144 of the Infrastructure (Wales) Act 2024f2, make the following Regulations.

Annotations

Footnotes

f1

For the meaning of “appropriate Minister” see section 140(4) of the Infrastructure (Wales) Act 2024 (asc. 3); see section 140(3) otherwise.

f2

2024 asc 3.