Paragraph 4 Detailed design parametersI1

England, Wales and Scotland

The wind turbine generators forming part of the authorised development shall be located within the Order limits and within 160 metres of the grid co-ordinates listed below.

TurbineLatitude (DMS)Longitude (DMS)
T151°27′56.719″01°02′11.603″
T251°28′00.579″01°02′47.537″
T351°27′38.990″01°02′33.993″
T451°27′42.632″01°03′10.491″
T551°27′21.259″01°02′56.378″
T651°27′24.677″01°03′32.602″
T751°27′03.300″01°03′19.206″
T851°27′06.943″01°03′54.979″
T951°26′45.416″01°03′42.001″
T1051°26′48.994″01°04′17.918″
T1151°26′27.428″01°04′04.186″
T1251°26′31.046″01°04′39.957″
T1351°26′34.817″01°05′15.662″
T1451°26′42.074″01°06′27.237″
T1551°26′45.659″01°07′03.019″
T1651°26′49.262″01°07′38.798″
T1751°26′52.861″01°08′14.578″