Paragraph 4 Approval of detailsI1

England and Wales

(1)

No part of the authorised development may be commenced until the following details have been submitted to and approved in writing by the relevant planning authority–

(a)

details of the siting and size of–

(i)

each wellhead compound (Work Nos 2A to 2U);

(ii)

the solution mining compound (Work No.4);

(iii)

the fenced compound and connection to the national transmission system (Work No.12);

(iv)

the gas processing plant (Work No.14);

(v)

the office, control and maintenance building (Work No.15);

(vi)

the construction and laydown areas (Work No.16);

(vii)

the gas marshalling compounds (Work Nos 20-21);

(viii)

the electrical compound (Work No.23); and

(ix)

the substation compound (Work No.25).

(b)

details of the design and external appearance of any buildings or structures to be provided;

(c)

means of access and details of the construction of each access;

(d)

details of the construction of the surface of each compound including the stripping and stockpiling of soils, the location and the storage of such, and the materials to be used in the construction of each compound;

(e)

details of any fencing to be erected; and

(f)

details of any operational lighting to include the number, height and location of any stanchions to be erected or mobile floodlighting units to be used, the number of floodlights, their lux levels, angles of luminance and extent of light distribution.

Annotations

Commencement

I1

Sch. 2 para. 4 in force at 5.4.2017, see art. 1