Schedule 11 LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKENI1

England, Wales and Scotland

(1)

Plot reference number shown on the Land Plans

(2)

Purpose for which temporary possession may be taken

Land Plans – Sheet 1
1/1B/1Temporary use as construction laydown areas (Work No. 4B)
1/2A/2/1Temporary use as construction laydown areas (Work No. 4B)
1/2DTemporary use as construction laydown areas, works to facilitate access, and temporary overhead line alterations including two new temporary pylons and realignment of the existing 400kV overhead line. (Work Nos. 7B, 9 and 5B)
Land Plans – Sheet 2
2/1B/1Temporary use as construction laydown areas (Work No. 4B)
2/1B/2Temporary use as construction laydown areas (Work No. 4B)
2/1B/3Temporary use as construction laydown areas (Work No. 4B)
2/1E/1Temporary use as construction laydown areas (Work No. 4B)
2/6/1Temporary use as construction laydown areas (Work No. 4B)

Annotations

Commencement

I1

Sch. 11 in force at 18.7.2023, see art. 1