Schedule 5 STREETS TO BE PERMANENTLY STOPPED UPI1
England, Wales and Scotland
(1) Area | (2) Street to be stopped up | (3) Extent of stopping up | (4) New Street to be substituted |
|---|---|---|---|
| Luton Borough Council and Central Bedfordshire Council | A1081 London Road | Between points A and B on the street plans, sheet 3 (being from a point 10 metres to the south of the A1081 London Road junction with M1 Junction 10a Kidney Wood Roundabout, southwards for a distance of 80 metres). | Work Nos.1, 2, 3A, 3B, 4A, 4B and 5 |
| London Road | Between points C and D on the street plans, sheet 3 (being from the London Road junction with M1 Junction 10a Kidney Wood Roundabout, northwards for a distance of 220 metres), including private means of access to Kidney Wood at points J and K on those plans (being respectively 87 metres and 200 metres to the north of the junction with M1 Junction 10a Kidney Wood Roundabout). | Work Nos.1, 2, 3A, 3B, 4A, 4B, 5, 6(a) and 6(c) | |
| Luton Borough Council | M1 Junction 10a Kidney Wood Roundabout | Between points E and F on the street plans, sheet 3 (being part of the circulatory carriageway, from a point 25 metres west of its junction with the centreline of London Road, eastwards for a distance of 45 metres) | Work Nos.1, 2, 3A, 3B, 4A, 4B and 5 |
| Public Footpath Ref FP43 | Between points G and H on the street plans, sheet 3 (being from a point 20 metres from its junction with the north-eastern highway boundary of Newlands Road to its junction with the highway boundary of M1 Junction 10a Kidney Wood Roundabout). | Work No. 7 | |
| Central Bedfordshire Council | Newlands Road | At point I on the street plans, sheet 3 (being private means of access to an infiltration pond to the south-east of the M1 Spur and north-east of Newlands Road to be at a point on the north-eastern highway boundary of Newlands Road 435 metres to the north-west of the junction with A1081 London Road). | Work No.1(d) |
Annotations
Commencement
- I1
Sch. 5 in force at 20.11.2013, see art. 1