OpenLegislation

Schedule 8 LAND IN WHICH ONLY NEW RIGHTS ETC. MAY BE ACQUIREDI1

England and Wales

(1)

Plot Reference Number shown on Land Plans

(2)

Purpose for which rights over land may be acquired

Land Plans – Sheet 2
2/2c, 2/3cTo construct, operate, access and maintain a diversion to an existing local high pressure gas main (Work No. 55).
2/3o, 2/10c, 2/29, 2/30To construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with Work No. 3).
2/3u, 2/3ahTo construct, operate, access and maintain diversion to an existing local high pressure gas main (Work No. 56) and an existing aqueduct pipeline (Work No. 62).
To construct, operate, access and maintain a reinforced cover slab for an existing fuel pipeline (Work No. 66) and to maintain access to the pipeline.
2/3aaTo access land to be used for the construction, operation and maintenance of drainage attenuation and treatment systems (Work No. 33).
To construct, operate, access and maintain diversions to an existing local high pressure gas main (Work No. 56) and an existing aqueduct pipeline (Work No. 62).
Land Plans – Sheet 3
3/4bTo access land to be used for the construction, operation and maintenance of drainage attenuation and treatment systems (Work No. 33).
To construct, operate, access and maintain diversions to an existing local high pressure gas main (Work No. 56) and an existing aqueduct pipeline (Work No. 62).
3/4fTo access land to be used for the construction, operation and maintenance of drainage attenuation and treatment systems (Work No. 33).
3/22a, 3/22bTo access land to be used in connection with the provision, maintenance and retention of mitigation within Bickenhill Meadows SSSI - Shadowbrook Meadows unit (Work No.76).
3/23, 3/73d, 3/73fTo construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with the authorised development).
3/25To access land to be used for the provision, maintenance and retention of mitigation in connection with Bickenhill Meadows site of special scientific interest (works associated with the authorised development).
To construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with the authorised development).
3/87aTo construct, operate, access and maintain diversions to an existing local high pressure gas main (Work No. 57) and existing electric lines, cables, equipment and apparatus (Works Nos. 64 and 65).
Land Plans – Sheet 4
4/1c, 4/1bf, 4/3b, 4/3c, 4/3s, 4/3x, 4/3ai, 4/3aj, 4/6n, 4/6p, 4/9, 4/10, 4/158, 4/159To construct, operate, access and maintain a diversion to an existing medium pressure gas main (Work No. 59).
To construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with the authorised development).
4/1d, 4/25aTo access land to be used for the construction, maintenance and retention of environmental mitigation at the existing Clock Interchange (works associated with Work No. 20).
4/1fTo access to and over land to be used for the construction, operation and maintenance of a realignment to the existing single carriageway A45 Eastbound to Bickenhill Lane free flow link road (Work No. 22).
To take access to and over land to be used for the construction, operation and maintenance of alterations to the existing Bickenhill Lane carriageway (Works Nos. 23 and 24).
To construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with the authorised development).
4/1gTo take access to and over land to be used for the construction, operation and maintenance of improvements to the existing Clock Interchange (Work No. 20).
To take access to and over land to be used for the construction, operation and maintenance of a realignment to the existing single carriageway A45 Eastbound to Bickenhill Lane free flow link road (Work No. 22).
To construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with the authorised development).
4/1h, 4/1m, 4/1q, 4/1s, 4/1t, 4/1u, 4/1v, 4/1w, 4/1x, 4/1am, 4/1ap, 4/1as, 4/1bb, 4/3e. 4/3f, 4/3g, 4/3h, 4/3j, 4/3k, 4/3m, 4/3ab, 4/3ae, 4/4g, 4/4n, 4/4v, 4/4x, 4/6b, 4/6e, 4/6f, 4/6g, 4/6h, 4/7a, 4/11a, 4/25b, 4/25d, 4/25e, 4/25g, 4/25i, , 4/25l, 4/25m, 4/25s, 4/62, 4/66, 4/69, 4/71, 4/73, 4/76, 4/80, 4/89, 4/91, 4/93, 4/94, 4/99, 4/102, 4/106, 4/109, 4/147, 4/150, 4/151, 4/152, 4/153, 4/155To construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with the authorised development).
4/1kTo construct, operate, access and maintain a diversion to an existing medium pressure gas main (Work No. 60).
4/25o, 4/25j, 4/25p, 4/25nTo access land to be used for the construction, operation and maintenance of a pedestrian overbridge (Work No. 39 and the installation of a new gantry (Work No. 2)).
4/1n, 4/1r, 4/82To access land to be used for the construction, operation and maintenance of a pedestrian overbridge (Work No. 39).
To construct, operate, access and maintain a diversion to an existing medium pressure gas main (Work No. 60).
To construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with the authorised development).
4/lzTo take access to and over land to be used for the construction, operation and maintenance of improvements to the existing Clock Interchange (Work No. 20).
To take access to and over land to be used for the construction, operation and maintenance of a realignment to the existing single carriageway A45 Eastbound to Bickenhill Lane free flow link road (Work No. 22).
4/1ab, 4/1acTo take access to and over land to be used for the construction, operation and maintenance of a realignment to the existing single carriageway A45 Eastbound to Bickenhill Lane free flow link road (Work No. 22).
4/1aq, 4/1bcTo construct, operate, access and maintain a realignment to a private means of access due to the construction of a new free flow link road at Work No. 21 (works associated with the authorised development).
4/1az, 4/1baTo construct, operate, access and maintain a diversion to an existing aqueduct pipeline (Work No. 63).
4/2a, 4/3afTo construct, operate, access and maintain diversions to an existing local high pressure gas main (Work No. 57) and existing electric lines, cables, equipment and apparatus (Works Nos. 64 and 65).
4/3dTo take access to and over land to be used for the construction, maintenance and retention of environmental mitigation at the existing Clock Interchange (works associated with Work No. 20).
To take access to and over land to be used for the construction, operation and maintenance of a realignment to the existing single carriageway A45 Eastbound to Bickenhill Lane free flow link road (Work No. 22).
To take access to and over land to be used for the construction, operation and maintenance of alterations to the existing Bickenhill Lane carriageway (Works Nos. 23 and 24).
To construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with the authorised development).
4/3i, 4/3lTo construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with Works Nos. 2 and 20).
4/3o, 4/3pTo construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with Work No. 2).
4/3yTo access land to be used for the construction, maintenance and retention of environmental mitigation at the existing Clock Interchange (works associated with Work No. 20).
To construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with Work No. 21).
4/3ah, 4/4k, 4/4u, 4/4w, 4/25q, 4/25u, 4/149, 4/160To construct, operate, access and maintain a diversion to an existing aqueduct pipeline (Work No. 63).
To construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with the authorised development).
4/6a, 4/156To construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with Work No. 21).
To construct, operate, access and maintain a diversion to an existing medium pressure gas main (Work No. 59).
To construct, operate, access and maintain a diversion to an existing aqueduct pipeline (Work No. 63).
To construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with the authorised development).
4/6dTo access land to be used for the construction, operation and maintenance of a pedestrian overbridge (Work No. 39).
To construct, operate, access and maintain a diversion to an existing medium pressure gas main (Work No. 60).
To construct, operate, access and maintain diversions to existing utilities apparatus and equipment (Works Nos. 56, 64 and 65).
4/25fTo construct, operate, access and maintain a gantry forming part of Work No. 2a
To construct, operate, access and maintain diversions to an existing local high pressure gas main (Work No. 57) and existing electric lines, cables, equipment and apparatus (Works Nos. 64 and 65).
4/59To construct, operate, access and maintain a realignment to a private means of access due to the construction of a new free flow link road at Work No. 21 (works associated with the authorised development).
To construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with authorised development).
Land Plans – Sheet 5
5/1b, 5/29h,To construct, operate, access and maintain diversions to an existing local high pressure gas main (Work No. 57) and existing electric lines, cables, equipment and apparatus (Works Nos. 64 and 65).
5/29c, 5/2h and 5/29uRequired for access to and construction of a new free flow single carriageway (Work No.26).
To construct, operate, access and maintain diversions to an existing local high pressure gas main (Work No. 57) and existing electric lines, cables, equipment and apparatus (Works Nos. 64 and 65).
5/7To construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with the authorised development).

Annotations

Commencement

I1

Sch. 8 in force at 11.6.2020, see art. 1