Schedule 8 LAND IN WHICH ONLY NEW RIGHTS ETC. MAY BE ACQUIREDI1
England and Wales
(1) Plot Reference Number shown on Land Plans | (2) Purpose for which rights over land may be acquired |
|---|---|
| Land Plans – Sheet 2 | |
| 2/2c, 2/3c | To construct, operate, access and maintain a diversion to an existing local high pressure gas main (Work No. 55). |
| 2/3o, 2/10c, 2/29, 2/30 | To construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with Work No. 3). |
| 2/3u, 2/3ah | To construct, operate, access and maintain diversion to an existing local high pressure gas main (Work No. 56) and an existing aqueduct pipeline (Work No. 62). |
| To construct, operate, access and maintain a reinforced cover slab for an existing fuel pipeline (Work No. 66) and to maintain access to the pipeline. | |
| 2/3aa | To access land to be used for the construction, operation and maintenance of drainage attenuation and treatment systems (Work No. 33). |
| To construct, operate, access and maintain diversions to an existing local high pressure gas main (Work No. 56) and an existing aqueduct pipeline (Work No. 62). | |
| Land Plans – Sheet 3 | |
| 3/4b | To access land to be used for the construction, operation and maintenance of drainage attenuation and treatment systems (Work No. 33). |
| To construct, operate, access and maintain diversions to an existing local high pressure gas main (Work No. 56) and an existing aqueduct pipeline (Work No. 62). | |
| 3/4f | To access land to be used for the construction, operation and maintenance of drainage attenuation and treatment systems (Work No. 33). |
| 3/22a, 3/22b | To access land to be used in connection with the provision, maintenance and retention of mitigation within Bickenhill Meadows SSSI - Shadowbrook Meadows unit (Work No.76). |
| 3/23, 3/73d, 3/73f | To construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with the authorised development). |
| 3/25 | To access land to be used for the provision, maintenance and retention of mitigation in connection with Bickenhill Meadows site of special scientific interest (works associated with the authorised development). |
| To construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with the authorised development). | |
| 3/87a | To construct, operate, access and maintain diversions to an existing local high pressure gas main (Work No. 57) and existing electric lines, cables, equipment and apparatus (Works Nos. 64 and 65). |
| Land Plans – Sheet 4 | |
| 4/1c, 4/1bf, 4/3b, 4/3c, 4/3s, 4/3x, 4/3ai, 4/3aj, 4/6n, 4/6p, 4/9, 4/10, 4/158, 4/159 | To construct, operate, access and maintain a diversion to an existing medium pressure gas main (Work No. 59). |
| To construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with the authorised development). | |
| 4/1d, 4/25a | To access land to be used for the construction, maintenance and retention of environmental mitigation at the existing Clock Interchange (works associated with Work No. 20). |
| 4/1f | To access to and over land to be used for the construction, operation and maintenance of a realignment to the existing single carriageway A45 Eastbound to Bickenhill Lane free flow link road (Work No. 22). |
| To take access to and over land to be used for the construction, operation and maintenance of alterations to the existing Bickenhill Lane carriageway (Works Nos. 23 and 24). | |
| To construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with the authorised development). | |
| 4/1g | To take access to and over land to be used for the construction, operation and maintenance of improvements to the existing Clock Interchange (Work No. 20). |
| To take access to and over land to be used for the construction, operation and maintenance of a realignment to the existing single carriageway A45 Eastbound to Bickenhill Lane free flow link road (Work No. 22). | |
| To construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with the authorised development). | |
| 4/1h, 4/1m, 4/1q, 4/1s, 4/1t, 4/1u, 4/1v, 4/1w, 4/1x, 4/1am, 4/1ap, 4/1as, 4/1bb, 4/3e. 4/3f, 4/3g, 4/3h, 4/3j, 4/3k, 4/3m, 4/3ab, 4/3ae, 4/4g, 4/4n, 4/4v, 4/4x, 4/6b, 4/6e, 4/6f, 4/6g, 4/6h, 4/7a, 4/11a, 4/25b, 4/25d, 4/25e, 4/25g, 4/25i, , 4/25l, 4/25m, 4/25s, 4/62, 4/66, 4/69, 4/71, 4/73, 4/76, 4/80, 4/89, 4/91, 4/93, 4/94, 4/99, 4/102, 4/106, 4/109, 4/147, 4/150, 4/151, 4/152, 4/153, 4/155 | To construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with the authorised development). |
| 4/1k | To construct, operate, access and maintain a diversion to an existing medium pressure gas main (Work No. 60). |
| 4/25o, 4/25j, 4/25p, 4/25n | To access land to be used for the construction, operation and maintenance of a pedestrian overbridge (Work No. 39 and the installation of a new gantry (Work No. 2)). |
| 4/1n, 4/1r, 4/82 | To access land to be used for the construction, operation and maintenance of a pedestrian overbridge (Work No. 39). |
| To construct, operate, access and maintain a diversion to an existing medium pressure gas main (Work No. 60). | |
| To construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with the authorised development). | |
| 4/lz | To take access to and over land to be used for the construction, operation and maintenance of improvements to the existing Clock Interchange (Work No. 20). |
| To take access to and over land to be used for the construction, operation and maintenance of a realignment to the existing single carriageway A45 Eastbound to Bickenhill Lane free flow link road (Work No. 22). | |
| 4/1ab, 4/1ac | To take access to and over land to be used for the construction, operation and maintenance of a realignment to the existing single carriageway A45 Eastbound to Bickenhill Lane free flow link road (Work No. 22). |
| 4/1aq, 4/1bc | To construct, operate, access and maintain a realignment to a private means of access due to the construction of a new free flow link road at Work No. 21 (works associated with the authorised development). |
| 4/1az, 4/1ba | To construct, operate, access and maintain a diversion to an existing aqueduct pipeline (Work No. 63). |
| 4/2a, 4/3af | To construct, operate, access and maintain diversions to an existing local high pressure gas main (Work No. 57) and existing electric lines, cables, equipment and apparatus (Works Nos. 64 and 65). |
| 4/3d | To take access to and over land to be used for the construction, maintenance and retention of environmental mitigation at the existing Clock Interchange (works associated with Work No. 20). |
| To take access to and over land to be used for the construction, operation and maintenance of a realignment to the existing single carriageway A45 Eastbound to Bickenhill Lane free flow link road (Work No. 22). | |
| To take access to and over land to be used for the construction, operation and maintenance of alterations to the existing Bickenhill Lane carriageway (Works Nos. 23 and 24). | |
| To construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with the authorised development). | |
| 4/3i, 4/3l | To construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with Works Nos. 2 and 20). |
| 4/3o, 4/3p | To construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with Work No. 2). |
| 4/3y | To access land to be used for the construction, maintenance and retention of environmental mitigation at the existing Clock Interchange (works associated with Work No. 20). |
| To construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with Work No. 21). | |
| 4/3ah, 4/4k, 4/4u, 4/4w, 4/25q, 4/25u, 4/149, 4/160 | To construct, operate, access and maintain a diversion to an existing aqueduct pipeline (Work No. 63). |
| To construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with the authorised development). | |
| 4/6a, 4/156 | To construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with Work No. 21). |
| To construct, operate, access and maintain a diversion to an existing medium pressure gas main (Work No. 59). | |
| To construct, operate, access and maintain a diversion to an existing aqueduct pipeline (Work No. 63). | |
| To construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with the authorised development). | |
| 4/6d | To access land to be used for the construction, operation and maintenance of a pedestrian overbridge (Work No. 39). |
| To construct, operate, access and maintain a diversion to an existing medium pressure gas main (Work No. 60). | |
| To construct, operate, access and maintain diversions to existing utilities apparatus and equipment (Works Nos. 56, 64 and 65). | |
| 4/25f | To construct, operate, access and maintain a gantry forming part of Work No. 2a |
| To construct, operate, access and maintain diversions to an existing local high pressure gas main (Work No. 57) and existing electric lines, cables, equipment and apparatus (Works Nos. 64 and 65). | |
| 4/59 | To construct, operate, access and maintain a realignment to a private means of access due to the construction of a new free flow link road at Work No. 21 (works associated with the authorised development). |
| To construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with authorised development). | |
| Land Plans – Sheet 5 | |
| 5/1b, 5/29h, | To construct, operate, access and maintain diversions to an existing local high pressure gas main (Work No. 57) and existing electric lines, cables, equipment and apparatus (Works Nos. 64 and 65). |
| 5/29c, 5/2h and 5/29u | Required for access to and construction of a new free flow single carriageway (Work No.26). |
| To construct, operate, access and maintain diversions to an existing local high pressure gas main (Work No. 57) and existing electric lines, cables, equipment and apparatus (Works Nos. 64 and 65). | |
| 5/7 | To construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with the authorised development). |
Annotations
Commencement
- I1
Sch. 8 in force at 11.6.2020, see art. 1