Schedule 5 LAND IN WHICH ONLY NEW RIGHTS ETC. MAY BE ACQUIREDI1
England and Wales
| (1) Plot reference number shown on land plans | (2) Purpose for which rights over land may be acquired | (3) Relevant part of the authorised development |
|---|---|---|
| Land Plans -Sheet 3 | ||
| 3/2b | New right for temporary access for the construction of motorway signage and associated cabling and ducting works | 1a |
| Land Plans -Sheet 4 | ||
| 4/1c | New right for the construction of motorway signage and associated cabling and ducting works New right for the construction of a new southbound exit slip from the M5 to the A4019 New right for the construction of a new northbound entry slip from the A4019 to the M5 New right for the construction of an environmental barrier adjacent to Barn Farm north of Junction 10 and west of the M5 | 1a, 1c, 1e, 1n |
| 4/1d | New right for the construction of a new southbound exit slip from the M5 to the A4019 New right for the construction of a new northbound entry slip from the A4019 to the M5 New right for an extension of the Leigh Brook culvert (also known as the Barn Farm culvert) New right for the construction of an environmental barrier adjacent to Barn Farm north of Junction 10 and west of the M5 New right for the construction of an environmental barrier adjacent to land housing a traveller site north of Junction 10 and east of the M5 New right for the diversion, use, protection, inspection and maintenance of electric cable and associated apparatus and equipment for the benefit of National Grid Electricity Distribution PLC | 1c, 1e, 1m, 1n, 1o, 20 |
| 4/3a | New right for the construction of an environmental barrier adjacent to Barn Farm north of Junction 10 and west of the M5 New right for the diversion, use, maintenance and protection of electric cable and associated apparatus and equipment for the benefit of National Grid Electricity Distribution PLC | 1n, 20 |
| 4/3b | New right for the construction, use, protection, inspection and maintenance of an environmental barrier adjacent to Barn Farm north of Junction 10 and west of the M5 New right for the diversion, use, protection, inspection and maintenance of electric cable and associated apparatus and equipment for the benefit of National Grid Electricity Distribution PLC | 1n, 20 |
| 4/3d | New right for the temporary access for the construction of a new southbound exit slip from the M5 to the A4019 and new permanent right of access to provide, protect, inspect and maintain environmental and ecological mitigation | 1c |
| 4/3e | New right for the temporary access for the construction of a new southbound exit slip from the M5 to the A4019 and new permanent right of access to provide, protect, inspect and maintain environmental and ecological mitigation | 1c |
| 4/3h | New right for the use of land northwest of Junction 10 as a construction compound New right to provide, protect, inspect and maintain landscaping northwest of Junction 10 | 1j, 2b |
| 4/4b | New right for the temporary access for the construction of a new southbound exit slip from the M5 to the A4019 and new permanent right of access to provide, protect, inspect and maintain environmental and ecological mitigation | 1c |
| Land Plans -Sheets 5 and 5A | ||
| 5/1a(i) | New right for the construction of new or altered private means of access New right for the diversion, use, protection and maintenance of telecommunication cable and associated apparatus and equipment | 3d, 27 |
| 5/2d | New right for the construction of motorway signage and associated cabling and ducting works New right for the construction of a new southbound exit slip from the M5 to the A4019 New right for the construction of a new grade separated roundabout junction and maintenance bays New right for the construction of a new roundabout over the M5 comprising a circulatory carriageway and the Piffs Elm interchange bridges (north and south) New right for the demolition of the existing A4019 bridge over the M5 New right for the diversion, use, protection, inspection and maintenance of water pipeline for the benefit of Severn Trent Water Limited New right for the diversion, use, protection, inspection and maintenance of gas main for the benefit of Wales & West Utilities Limited New right for the diversion, use, protection, inspection and maintenance of telecommunication cable and associated apparatus and equipment New right for the demolition of the existing NRTS Transmission Station and associated infrastructure | 1a, 1c, 2, 2a, 2d, 15, 16, 27, 36a |
| 5/2h | New right for the realignment and widening of the A4019 (Tewkesbury Road) northwest of Junction 10 with associated footway, cycleway, shared use path, private access points, signage and ducting New right for the realignment of the unclassified road known as Stanboro Lane New right for the diversion, use, protection and maintenance of telecommunication cable and associated apparatus and equipment | 3, 3a, 10 |
| 5/2h(i) | New right for the realignment and widening of the A4019 (Tewkesbury Road) northwest of Junction 10 with associated footway, cycleway, shared use path, private access points, signage and ducting New right for the realignment of the unclassified road known as Stanboro Lane New right for the diversion, use, protection, inspection and maintenance of telecommunication cable and associated apparatus and equipment | 3, 3a, 27 |
| 5/2i | New right for the realignment and widening of the A4019 (Tewkesbury Road) northwest of Junction 10 with associated footway, cycleway, shared use path, private access points, signage and ducting New right for the diversion, use, protection and maintenance of telecommunication cable and associated apparatus and equipment | 3, 10 |
| 5/2j | New right for the realignment and widening of the A4019 (Tewkesbury Road) northwest of Junction 10 with associated footway, cycleway, shared use path, private access points, signage and ducting New right for the realignment of the unclassified road known as Stanboro Lane | 3, 3a |
| 5/2k | New right for the realignment of the unclassified road known as Stanboro Lane | 3a |
| 5/2l | New right for the realignment and widening of the A4019 (Tewkesbury Road) northwest of Junction 10 with associated footway, cycleway, shared use path, private access points, signage and ducting New right for the realignment of the unclassified road known as Stanboro Lane | 3, 3a |
| 5/2n | New right for the construction of a new northbound exit slip from the M5 to the A4019 New right for the construction of a new southbound entry slip from the A4019 to the M5 New right for the construction of a new grade separated roundabout junction and maintenance bays New right for the construction of a new roundabout over the M5 comprising a circulatory carriageway and the Piffs Elm interchange bridges (north and south) New right for the extension of the Piffs Elm culvert New right for the demolition of the existing A4019 bridge over the M5 New right for the realignment and widening of the A4019 (Tewkesbury Road) northwest of Junction 10 with associated footway, cycleway, shared use path, private access points, signage and ducting New right for the diversion of telecommunication cable and associated apparatus and equipment New right for the diversion, use, protection and maintenance of electric cable and associated apparatus and equipment for the benefit of National Grid Distribution Limited PLC New right for the demolition of the existing NRTS Transmission Station and associated infrastructure | 1b, 1d, 2, 2a, 2c, 2d, 3, 10, 19, 36a |
| 5/2o | New right for the construction of a new grade separated roundabout junction and maintenance bays New right for the demolition of the existing A4019 bridge over the M5 New right for the realignment and widening of the A4019 (Tewkesbury Road) northwest of Junction 10 with associated footway, cycleway, shared use path, private access points, signage and ducting New right for the diversion, use, protection and maintenance of electric cable and associated apparatus and equipment for the benefit of National Grid Distribution Limited PLC | 2, 2d, 3, 19 |
| 5/2p | New right for the construction of a new grade separated roundabout junction and maintenance bays New right for the demolition of the existing A4019 bridge over the M5 New right for the diversion, use, protection and maintenance of electric cable and associated apparatus and equipment for the benefit of National Grid Distribution Limited PLC | 2, 2d, 19 |
| 5/2r | New right for the construction of a new grade separated roundabout junction and maintenance bays New right for the realignment of the unclassified road known as Stanboro Lane New right for the diversion, use, protection and maintenance of electric cable and associated apparatus and equipment for the benefit of National Grid Distribution Limited PLC | 2, 3a, 19 |
| 5/2y | New right for the construction of a new grade separated roundabout junction and maintenance bays New right for the demolition of the existing A4019 bridge over the M5 | 2, 2d |
| 5/2z | New right for the construction of a new grade separated roundabout junction and maintenance bays New right for the demolition of the existing A4019 bridge over the M5 | 2, 2d |
| 5/2aa | New right for the construction of a new grade separated roundabout junction and maintenance bays New right for the demolition of the existing A4019 bridge over the M5 | 2, 2d |
| 5/2cc | New right for the construction of a new grade separated roundabout junction and maintenance bays New right for the demolition of the existing A4019 bridge over the M5 | 2, 2d |
| 5/2ee | New right for the construction of a new grade separated roundabout junction and maintenance bays New right for the demolition of the existing A4019 bridge over the M5 New right for the realignment and dualling of the A4019 (Tewkesbury Road) southeast of Junction 10, M5 to east of Gallagher Junction with associated footway, cycleway, shared use paths, private means of access, signage and ducting New right for the construction of an underpass west of Withybridge Lane New right for the diversion and construction of bridleway BR AUC1 under the A4019 (Tewkesbury Road) New right for the diversion, use, protection and maintenance of telecommunication cable and associated apparatus and equipment | 2, 2d, 4, 4b, 4c, 10 |
| 5/2gg | New right for the construction of a new grade separated roundabout junction and maintenance bays New right for the demolition of the existing A4019 bridge over the M5 New right for the realignment and dualling of the A4019 (Tewkesbury Road) southeast of Junction 10, M5 to east of Gallagher Junction with associated footway, cycleway, shared use paths, private means of access, signage and ducting New right for the diversion, use, protection and maintenance of telecommunication cable and associated apparatus and equipment | 2, 2d, 4, 10 |
| 5/2jj | New right for the realignment and dualling of the A4019 (Tewkesbury Road) southeast of Junction 10, M5 to east of Gallagher Junction with associated footway, cycleway, shared use paths, private means of access, signage and ducting New right for the construction of an underpass west of Withybridge Lane New right for the diversion and construction of bridleway BR AUC1 under the A4019 (Tewkesbury Road) New right for the diversion, use, protection and maintenance of telecommunication cable and associated apparatus and equipment | 4, 4b, 4c, 10 |
| 5/2kk | New right for the construction of a new grade separated roundabout junction and maintenance bays New right for the construction of a new roundabout over the M5 comprising a circulatory carriageway and the Piffs Elm interchange bridges (north and south) New right for the diversion, use, protection and maintenance of telecommunication cable and associated apparatus and equipment New right for the demolition of the existing NRTS Transmission Station and associated infrastructure | 2, 2a, 10, 36a |
| 5/2mm | New right for the construction of a new grade separated roundabout junction and maintenance bays New right for the diversion, use, protection and maintenance of telecommunication cable and associated apparatus and equipment | 2, 10 |
| 5/2ss | New right for the realignment and dualling of the A4019 (Tewkesbury Road) southeast of Junction 10, M5 to east of Gallagher Junction with associated footway, cycleway, shared use paths, private means of access, signage and ducting New right for the diversion, use, protection and maintenance of telecommunication cable and associated apparatus and equipment | 4, 10 |
| 5/2uu | New right for the construction of a new grade separated roundabout junction and maintenance bays New right for the construction of a new roundabout over the M5 comprising a circulatory carriageway and the Piffs Elm interchange bridges (north and south) New right for the diversion, use, protection and maintenance of telecommunication cable and associated apparatus and equipment | 2, 2a, 10 |
| 5/3b | New right for the temporary access for the construction of a new southbound exit slip from the M5 to the A4019 and new permanent right of access to provide, protect, inspect and maintain environmental and ecological mitigation | 1c |
| 5/3c | New right for the temporary access for the construction of a new southbound exit slip from the M5 to the A4019 and new permanent right of access to provide, protect, inspect and maintain environmental and ecological mitigation | 1c |
| 5/4b | New right for the construction of new or altered private means of access New right for the diversion, use, protection, inspection and maintenance of water pipeline for the benefit of Severn Trent Water Limited New right for the diversion, use, protection, inspection and maintenance of gas main for the benefit of Wales & West Utilities Limited New right for the diversion, use, protection, inspection and maintenance of telecommunication cable and associated apparatus and equipment | 4g, 15, 16, 27 |
| 5/4b(i) | New right for the construction of new or altered private means of access New right for the diversion, use, protection, inspection and maintenance of water pipeline for the benefit of Severn Trent Water Limited New right for the diversion, use, protection, inspection and maintenance of gas main for the benefit of Wales & West Utilities Limited New right for the diversion, use, protection, inspection and maintenance of telecommunication cable and associated apparatus and equipment | 4g, 15, 16, 27 |
| 5/4b(ii) | New right for the diversion and construction of bridleway BR AUC1 under the A4019 (Tewkesbury Road) New right for the construction of new or altered private means of access New right for the diversion, use, protection, inspection and maintenance of water pipeline for the benefit of Severn Trent Water Limited New right for the diversion, use, protection, inspection and maintenance of gas main for the benefit of Wales & West Utilities Limited New right for the diversion, use, protection, inspection and maintenance of telecommunication cable and associated apparatus and equipment | 4c, 4g, 15, 16, 27 |
| 5/4b(iii) | New right for the construction of new or altered private means of access New right for the diversion, use, protection, inspection and maintenance of water pipeline for the benefit of Severn Trent Water Limited New right for the diversion, use, protection, inspection and maintenance of gas main for the benefit of Wales & West Utilities Limited New right for the diversion, use, protection, inspection and maintenance of telecommunication cable and associated apparatus and equipment | 4g, 15, 16, 27 |
| 5/4d(iv) | New right for construction compound no. 3 northeast of Junction 10 New right to construct, use, protect, inspect and maintain mitigation planting for dormice | 1k, 4j |
| 5/4d(v) | New right for construction compound no. 3 northeast of Junction 10 New right to construct, use, protect, inspect and maintain mitigation planting for dormice | 1k, 4j |
| 5/4d(vi) | New right for construction compound no. 3 northeast of Junction 10 New right to construct, use, protect, inspect and maintain mitigation planting for dormice | 1k, 4j |
| 5/4d(vii) | New right for construction compound no. 3 northeast of Junction 10 New right to construct, use, protect, inspect and maintain mitigation planting for dormice | 1k, 4j |
| 5/4d(viii) | New right for construction compound no. 3 northeast of Junction 10 New right to construct, use, protect, inspect and maintain mitigation planting for dormice | 1k, 4j |
| 5/5a | New right for the demolition of Sheldon Nursery northwest of Junction 10 New right for the construction of new or altered private means of access New right for the diversion, use, protection and maintenance of electric cable and associated apparatus and equipment for the benefit of National Grid Electricity Distribution PLC | 2f, 3d, 19 |
| 5/5b | New right for the construction compound no. 2 northwest of Junction 10 New right for the diversion, use, protection and maintenance of electric cable and associated apparatus and equipment for the benefit of National Grid Electricity Distribution PLC | 1j, 19 |
| 5/5g | New right for the realignment of the unclassified road known as Stanboro Lane | 3a |
| 5/6f | New right for the construction of a new grade separated roundabout junction and maintenance bays New right for the demolition of the existing A4019 bridge over the M5 | 2, 2d |
| 5/6g | New right for the construction of a new grade separated roundabout junction and maintenance bays New right for the demolition of the existing A4019 bridge over the M5 New right for the diversion, use, protection and maintenance of telecommunication cable and associated apparatus and equipment | 2, 2d, 10 |
| 5/6h | New right for the construction of a new grade separated roundabout junction and maintenance bays New right for the demolition of the existing A4019 bridge over the M5 | 2, 2d |
| 5/10d | New right for the provision, protection, inspection and maintenance of a flood compensation area at the location shown on sheets 5 and 11 of the works plans | 3e |
| 5/11b | New right for the diversion, construction, use and maintenance of bridleway BR AUC1 under the A4019 (Tewkesbury Road) New right for the construction of new or altered private means of access New right for the diversion, use, protection, inspection and maintenance of water pipeline for the benefit of Severn Trent Water Limited New right for the diversion, use, protection, inspection and maintenance of gas main for the benefit of Wales & West Utilities Limited New right for the diversion, use, protection, inspection and maintenance of telecommunication cable and associated apparatus and equipment | 4c, 4g, 15, 16, 27 |
| 5/31a(i) | New right for construction compound no. 3 northeast of Junction 10 New right to construct, use, protect, inspect and maintain mitigation planting for dormice | 1k, 4j |
| 5/31b(i) | New right for construction compound no. 3 northeast of Junction 10 New right to construct, use, protect, inspect and maintain mitigation planting for dormice | 1k, 4j |
| 5/31c(i) | New right for construction compound no. 3 northeast of Junction 10 New right to construct, use, protect, inspect and maintain mitigation planting for dormice | 1k, 4j |
| 5/31d | New right for the diversion, construction, use and maintenance of bridleway BR AUC1 under the A4019 (Tewkesbury Road) New right for the construction of new or altered private means of access New right for the diversion, use, protection, inspection and maintenance of water pipeline for the benefit of Severn Trent Water Limited New right for the diversion, use, protection, inspection and maintenance of gas main for the benefit of Wales & West Utilities Limited New right for the diversion, use, protection, inspection and maintenance of telecommunication cable and associated apparatus and equipment | 4c, 4g, 15, 16, 27 |
| 5/33c | New right for the temporary access for the construction of a new southbound exit slip from the M5 to the A4019 and new permanent right of access to provide, protect, inspect and maintain environmental and ecological mitigation | 1c |
| Land Plans -Sheet 6 | ||
| 6/1e | New right for the use of land southwest of Junction 10 at the location shown on sheets 5 and 6 of the works plans as construction compound no. 1 | 1i |
| 6/1g | New right to construct, use, protect, inspect and maintain the environmental mitigation associated with the construction of a new northbound exit slip from the M5 to the A4019 | 1b |
| 6/3a | New right to construct, use, protect, inspect and maintain the environmental mitigation associated with the construction of a new northbound exit slip from the M5 to the A4019 | 1b |
| 6/3a(i) | New right to construct, use, protect, inspect and maintain the environmental mitigation associated with the construction of a new northbound exit slip from the M5 to the A4019 | 1b |
| 6/3a(ii) | New right to construct, use, protect, inspect and maintain the environmental mitigation associated with the construction of a new northbound exit slip from the M5 to the A4019 | 1b |
| 6/3a(iii) | New right to construct, use, protect, inspect and maintain the environmental mitigation associated with the construction of a new northbound exit slip from the M5 to the A4019 | 1b |
| 6/10a | New right to construct, use, protect, inspect and maintain a flood compensation area | 5n |
| 6/11a | New right to construct, use, protect, inspect and maintain a flood compensation area | 5n |
| Land Plans -Sheet 7 | ||
| 7/1e | New right to construct, use, protect, inspect and maintain the environmental mitigation associated with the construction of a new northbound exit slip from the M5 to the A4019 | 1b |
| 7/3b | New right to construct, use, protect, inspect and maintain the environmental mitigation associated with the construction of a new southbound entry slip from the A4019 to the M5 | 1d |
| 7/3b(i) | New right to construct, use, protect, inspect and maintain the environmental mitigation associated with the construction of a new southbound entry slip from the A4019 to the M5 | 1d |
| 7/3c | New right to construct, use, protect, inspect and maintain a flood compensation area | 6d |
| 7/4a | New right to construct, use, protect, inspect and maintain a flood compensation area | 6d |
| 7/4b | New right to construct, use, protect, inspect and maintain a flood compensation area | 6d |
| 7/4b(i) | New right to construct, use, protect, inspect and maintain a flood compensation area | 6d |
| 7/4c(i) | New right to construct, use, protect, inspect and maintain a flood compensation area | 6d |
| 7/4d | New right to construct, use, protect, inspect and maintain a flood compensation area | 6d |
| 7/5a | New right to construct, use, protect, inspect and maintain a flood compensation area | 6d |
| 7/6a | New right to construct, use, protect, inspect and maintain a flood compensation area | 6d |
| 7/6b | New right to construct, use, protect, inspect and maintain a flood compensation area | 6d |
| 7/7a | New right to construct, use, protect, inspect and maintain a flood compensation area | 6d |
| Land Plans - Sheet 10 | ||
| 10/3b | New right for the construction of motorway signage and associated cabling and ducting works | 1a |
| 10/3b(i) | New right for the construction of motorway signage and associated cabling and ducting works | 1a |
| 10/3b(ii) | New right for the construction of motorway signage and associated cabling and ducting works | 1a |
| Land Plans – Sheet 11 | ||
| 11/1a | New right to construct, use, protect, inspect and maintain a flood compensation area | 3e |
| 11/1b | New right to construct, use, protect, inspect and maintain a flood compensation area | 3e |
| 11/1c | New right to construct, use, protect, inspect and maintain a flood compensation area New right for the diversion, use, protection, inspection and maintenance of telecommunication cable and associated apparatus and equipment | 3e, 28 |
| 11/3a | New right for the realignment and widening of the A4019 (Tewkesbury Road) northwest of Junction 10 with associated footway, cycleway, shared use path, private access points, signage and ducting New right for the diversion of a public right of way FP ABO14 to the south side of the A4019 (Tewkesbury Road) New right for the construction of new or altered private means of access New right for the diversion, use, protection and maintenance of telecommunication cable and associated apparatus and equipment New right for the diversion, use, protection and maintenance of telecommunication cable and associated apparatus and equipment | 3, 3c, 3d, 10, 28 |
| 11/3b | New right for the realignment and widening of the A4019 (Tewkesbury Road) northwest of Junction 10 with associated footway, cycleway, shared use path, private access points, signage and ducting New right for the realignment of the unclassified road known as Stanboro Lane New right for the diversion of telecommunication cable and associated apparatus and equipment | 3, 3a, 10 |
| Land Plans - Sheets 12 and 12A | ||
| 12/1b | New right for the use of land north of the A4019 (Tewkesbury Road) as construction compound no. 4 New right to construct, use, protect, inspect and maintain mitigation planting for dormice | 4i, 4j |
| 12/1b(i) | New right for the use of land north of the A4019 (Tewkesbury Road) as construction compound no. 4 New right to construct, use, protect, inspect and maintain mitigation planting for dormice | 4i, 4j |
| 12/1b(ii) | New right for the use of land north of the A4019 (Tewkesbury Road) as construction compound no. 4 New right to construct, use, protect, inspect and maintain mitigation planting for dormice | 4i, 4j |
| 12/1b(iii) | New right for the use of land north of the A4019 (Tewkesbury Road) as construction compound no. 4 New right to construct, use, protect, inspect and maintain mitigation planting for dormice | 4i, 4j |
| 12/1e | New right for the diversion, construction, use and maintenance of bridleway BR AUC1 under the A4019 (Tewkesbury Road) New right for the construction of new or altered private means of access New right for the diversion, use, protection, inspection and maintenance of water pipeline for the benefit of Severn Trent Water Limited New right for the diversion, use, protection, inspection and maintenance of gas main for the benefit of Wales & West Utilities Limited New right for the diversion, use, protection, inspection and maintenance of telecommunication cable and associated apparatus and equipment | 4c, 4g, 15, 16, 27 |
| 12/2b | New right for the use of land north of the A4019 (Tewkesbury Road) as construction compound no. 4 | 4i |
| 12/2b(i) | New right for the use of land north of the A4019 (Tewkesbury Road) as construction compound no. 4 | 4i |
| 12/2c | New right for the diversion, construction, use and maintenance of bridleway BR AUC1 under the A4019 (Tewkesbury Road) New right for the construction of new or altered private means of access New right for the construction of a public right of way (footpath) to link to diverted bridleway BR AUC1 New right for the diversion, use, protection, inspection and maintenance of water pipeline for the benefit of Severn Trent Water Limited New right for the diversion, use, protection, inspection and maintenance of gas main for the benefit of Wales & West Utilities Limited New right for the diversion, use, protection, inspection and maintenance of telecommunication cable and associated apparatus and equipment | 4c, 4g, 4z, 15, 16, 27 |
| 12/2k | New right of temporary access for the construction of a new West Cheltenham Link Road south of the A4019 (Tewkesbury Road) to join with the B4634 with footway and cycle track to the west and private access, signage and ducting, and new permanent rights to provide, protect, inspect, and maintain environmental and ecological mitigation New right for the use of land east of Withybridge Lane and west of new West Cheltenham Link Road as construction compound no. 5 | 5, 5b |
| 12/2k(i) | New right of temporary access for the construction of a new West Cheltenham Link Road south of the A4019 (Tewkesbury Road) to join with the B4634 with footway and cycle track to the west and private access, signage and ducting, and new permanent rights to provide, protect, inspect, and maintain environmental and ecological mitigation New right for the use of land east of Withybridge Lane and west of the new West Cheltenham Link Road as construction compound no. 5 New right for the diversion, use, protection, inspection and maintenance of electric cable and associated apparatus and equipment for the benefit of National Grid Electricity Distribution plc | 5, 5b, 21 |
| 12/2v | New right of temporary access for the construction of a new West Cheltenham Link Road south of the A4019 (Tewkesbury Road) to join with the B4634 with footway and cycle track to the west and private access, signage and ducting, and new permanent rights to provide, protect, inspect, and maintain environmental and ecological mitigation New right for the construction and use of a private means of access track to the east of the West Cheltenham Link Road New right to construct, use, protect, inspect and maintain a flood compensation area New right for the diversion, use, protection, inspection and maintenance of electric cable and associated apparatus and equipment for the benefit of National Grid Electricity Distribution plc | 5, 5k, 5n, 21 |
| 12/2w | New right to construct, use, protect, inspect and maintain a flood compensation area New right to construct, use, protect, inspect and maintain a flood compensation area | 5n, 5o |
| 12/2x | New right to construct, use, protect, inspect and maintain a flood compensation area New right for the diversion, use, protection, inspection and maintenance of electric cable and associated apparatus and equipment for the benefit of National Grid Electricity Distribution plc | 5n, 21 |
| 12/6a | New right for the realignment and dualling of the A4019 (Tewkesbury Road) southeast of Junction 10, M5 to east of Gallagher Junction with associated footway, cycleway, shared use paths, private means of access, signage and ducting New right for the diversion, use, protection and maintenance of telecommunication cable and associated apparatus and equipment | 4, 10 |
| 12/7a | New right for the use of land north of the A4019 (Tewkesbury Road) as construction compound no. 4 | 4i |
| 12/7b | New right for the use of land north of the A4019 (Tewkesbury Road) as construction compound no, 4 New right to construct, use, protect, inspect and maintain mitigation planting for dormice | 4i, 4j |
| 12/7b(i) | New right for the use of land north of the A4019 (Tewkesbury Road) as construction compound no. 4 | 4i |
| 12/7b(ii) | New right for the use of land north of the A4019 (Tewkesbury Road) as construction compound no. 4 | 4i |
| 12/7g | New right to construct, use, protect, inspect and maintain mitigation planting for dormice | 4j |
| 12/8b | New right to construct, use, protect, inspect and maintain mitigation planting for dormice | 4j |
| 12/9a | New right to construct, use, protect, inspect and maintain a flood compensation area | 5n |
| 12/9b | New right of temporary access for the construction of a new West Cheltenham Link Road south of the A4019 (Tewkesbury Road) to join with the B4634 with footway and cycle track to the west and private access, signage and ducting, and new permanent rights to provide, protect, inspect, and maintain environmental and ecological mitigation | 5 |
| 12/10a | New right to construct, use, protect, inspect and maintain a flood compensation area | 5n |
| 12/16a | New right for the realignment and dualling of the A4019 (Tewkesbury Road) southeast of Junction 10, M5 to east of Gallagher Junction with associated footway, cycleway, shared use paths, private means of access, signage and ducting New right for the diversion, use, provision and maintenance of telecommunication cable and associated apparatus and equipment | 4, 29 |
| 12/16b | New right for the realignment and dualling of the A4019 (Tewkesbury Road) southeast of Junction 10, M5 to east of Gallagher Junction with associated footway, cycleway, shared use paths, private means of access, signage and ducting New right for the diversion, use, protection and maintenance of telecommunication cable and associated apparatus and equipment | 4, 29 |
| Land Plans – Sheets 13 and 13A | ||
| 13/1a | New right to construct, use, protect, inspect and maintain mitigation planting for dormice | 4j |
| 13/1a(i) | New right to construct, use, protect, inspect and maintain mitigation planting for dormice | 4j |
| 13/1e | New right for temporary access for the realignment and dualling for the A4019 (Tewkesbury Road) southeast of Junction 10, M5 to east of Gallegher Junction with associated footway, cycleway, shared use paths, private means of access, signage and ducting New right to construct, use, protect, inspect and maintain mitigation planting for dormice | 4, 4j |
| 13/1e(i) | New right for temporary access for the realignment and dualling for the A4019 (Tewkesbury Road) southeast of Junction 10, M5 to east of Gallegher Junction with associated footway, cycleway, shared use paths, private means of access, signage and ducting New right to construct, use, protect, inspect and maintain mitigation planting for dormice | 4, 4j |
| 13/1h | New right for the construction of new or altered private means of access New right for the diversion, use, protection and maintenance of water pipeline for the benefit of Severn Trent Water Limited | 4g, 15 |
| 13/2b | New right to construct, use, protect, inspect and maintain mitigation planting for dormice | 4j |
| 13/2d | New right to construct, use, protect, inspect and maintain mitigation planting for dormice | 4j |
| 13/3o | New right for the diversion, use, protection, inspection and maintenance of electric cable and associated apparatus and equipment for the benefit of National Grid Electricity Distribution plc | 23 |
| 13/3w | New right to construct, use, protect, inspect and maintain mitigation planting for dormice New right for the diversion, use, protection, inspection and maintenance of electric cable and associated apparatus and equipment for the benefit of National Grid Electricity Distribution plc | 4j, 23 |
| 13/3w(i) | New right to construct, use, protect, inspect and maintain mitigation planting for dormice | 4j |
| 13/3z | New right to cleanse, widen, deepen and maintain the existing ditch outfall from the proposed attenuation pond | 4q |
| 13/6a | New right for the construction of service roads running east and west of The Green New right for the diversion, use, protection and maintenance of gas main for the benefit of Wales & West Utilities Limited New right for the diversion use, protection and maintenance of electric cable and associated apparatus and equipment for the benefit of National Grid Electricity Distribution PLC | 4n, 17, 22 |
| 13/11a | New right for the construction of new or altered private means of access New right for the construction of service roads running east and west of The Green New right to construct, use, protect, inspect and maintain mitigation planting for dormice | 4g, 4n,4j |
| 13/11b | New right to construct, use, protect, inspect and maintain mitigation planting for dormice | 4j |
| 13/12a | New right to construct, use, protect, inspect and maintain mitigation planting for dormice | 4j |
| 13/14a | New right for the construction of a service road to the south of the A4019 (Tewkesbury Road) serving properties including the Cotswold Area Civil Service Sports Association; Homecroft Drive and the West Cheltenham Community Fire Station New right for the diversion, use, protection and maintenance of water pipeline for the benefit of Severn Trent Water Limited New right for the diversion, use, protection and maintenance of gas main for the benefit of Wales & West Utilities Limited New right for the diversion, use, protection and maintenance of electric cable and associated apparatus and equipment for the benefit of National Grid Electricity Distribution PLC New right for the diversion, use, protection and maintenance of telecommunication cable and associated apparatus and equipment New right for the diversion, use, protection and maintenance of telecommunication cable and associated apparatus and equipment | 4v, 15, 18, 24, 27, 32 |
| 13/15a | New right for the construction of a service road to the south of the A4019 (Tewkesbury Road) serving properties including the Cotswold Area Civil Service Sports Association; Homecroft Drive; and the West Cheltenham Community Fire Station | 4v |
| 13/16a | New right for the construction of a service road to the south of the A4019 (Tewkesbury Road) serving properties including the Cotswold Area Civil Service Sports Association; Homecroft Drive and the West Cheltenham Community Fire Station New right for the diversion, use, protection and maintenance of water pipeline for the benefit of Severn Trent Water Limited New right for the diversion, use, protection and maintenance of electric cable and associated apparatus and equipment for the benefit of National Grid Electricity Distribution PLC New right for the diversion, use, protection and maintenance of telecommunication cable and associated apparatus and equipment | 4v, 15, 24, 32 |
| 13/17a | New right for the construction of a service road to the south of the A4019 (Tewkesbury Road) serving properties including the Cotswold Area Civil Service Sports Association; Homecroft Drive and the West Cheltenham Community Fire Station New right for the diversion, use, protection and maintenance of telecommunication cable and associated apparatus and equipment | 4v, 32 |
| 13A/1a | New right to cleanse, widen, deepen and maintain the existing ditch outfall from the proposed attenuation pond | 4q |
| 13A/2a | New right to cleanse, widen, deepen and maintain the existing ditch outfall from the proposed attenuation pond | 4q |
| Land Plans – Sheet 14 | ||
| 14/6a | New right for the alteration of the signalised junction serving Gallagher Retail Park and the B4634 to the south of the A4019 (Tewkesbury Road) with maintenance bay New right for the diversion, use, protection and maintenance of gas main for the benefit of Wales & West Utilities | 4x, 18 |
| Land Plans – Sheet 15 | ||
| 15/3c | New right of temporary access for the construction of a new West Cheltenham Link Road south of the A4019 (Tewkesbury Road) to join with the B4634 with footway and cycle track to the west and private access, signage and ducting, and new permanent rights to provide, protect, inspect, and maintain environmental and ecological mitigation New right for the construction of new or altered private means of access New right for the diversion, construction, use and maintenance of public right of way FP AUC11 to the north of the River Chelt under the new River Chelt Bridge | 5, 5k, 5e |
| 15/3d | New right to construct, use, protect, inspect and maintain a flood compensation area New right to construct, use, protect, inspect and maintain a flood compensation area | 5n, 5o |
| 15/4a | New right to construct, use, protect, inspect and maintain a flood compensation area | 5n |
| 15/4b | New right of temporary access for the construction of a new West Cheltenham Link Road south of the A4019 (Tewkesbury Road) to join with the B4634 with footway and cycle track to the west and private access, signage and ducting, and new permanent rights to provide, protect, inspect, and maintain environmental and ecological mitigation New right for the construction, use, protection and maintenance of a new bridge over the River Chelt and associated environmental mitigation New right for the diversion, construction, use and maintenance of public right of way FP AUC11 to the north of the River Chelt under the new River Chelt Bridge | 5, 5d, 5e |
| 15/4e | New right of temporary access for the construction of a new West Cheltenham Link Road south of the A4019 (Tewkesbury Road) to join with the B4634 with footway and cycle track to the west and private access, signage and ducting, and new permanent rights to provide, protect, inspect, and maintain environmental and ecological mitigation New right for the construction, use, protection and maintenance of a new bridge over the River Chelt and associated environmental mitigation New right for the diversion, construction, use and maintenance of public right of way FP AUC11 to the north of the River Chelt under the new River Chelt Bridge | 5, 5d, 5e |
| 15/4f | New right for the construction, use, protection and maintenance of a new bridge over the River Chelt and associated environmental mitigation New right for the diversion, construction, use and maintenance of public right of way FP AUC11 to the north of the River Chelt under the new River Chelt Bridge | 5d, 5e |
| 15/5b | New right of temporary access for the construction of a new West Cheltenham Link Road south of the A4019 (Tewkesbury Road) to join with the B4634 with footway and cycle track to the west and private access, signage and ducting, and new permanent rights to provide, protect, inspect, and maintain environmental and ecological mitigation New right for the construction, use, protection and maintenance of a new bridge over the River Chelt and associated environmental mitigation New right for the diversion, construction, use and maintenance of public right of way FP AUC11 to the north of the River Chelt under the new River Chelt Bridge | 5, 5d, 5e |
| 15/5b(i) | New right for the construction, use, protection and maintenance of a new bridge over the River Chelt and associated environmental mitigation | 5d |
| 15/6a | New right to construct, use, protect, inspect and maintain a flood compensation area | 6d |
| 15/7a | New right for the construction, use, protection and maintenance of a new bridge over the River Chelt and associated environmental mitigation | 5d |
| 15/8a | New right of temporary access for the construction of a new West Cheltenham Link Road south of the A4019 (Tewkesbury Road) to join with the B4634 with footway and cycle track to the west and private access, signage and ducting, and new permanent rights to provide, protect, inspect, and maintain environmental and ecological mitigation New right for the construction, use, protection and maintenance of a new bridge over the River Chelt and associated environmental mitigation New right for the diversion, construction, use and maintenance of public right of way FP ABO24 to the south of the River Chelt under the new River Chelt Bridge | 5, 5d, 5f |
| 15/8a(i) | New right of temporary access for the construction of a new West Cheltenham Link Road south of the A4019 (Tewkesbury Road) to join with the B4634 with footway and cycle track to the west and private access, signage and ducting, and new permanent rights to provide, protect, inspect, and maintain environmental and ecological mitigation New right for the diversion, use, protection, inspection and maintenance of gas main for the benefit of Wales & West Utilities Limited | 5, 35 |
| 15/8b | New right of temporary access for the construction of a new West Cheltenham Link Road south of the A4019 (Tewkesbury Road) to join with the B4634 with footway and cycle track to the west and private access, signage and ducting, and new permanent rights to provide, protect, inspect, and maintain environmental and ecological mitigation New right for the construction, use, protection and maintenance of a new bridge over the River Chelt and associated environmental mitigation New right for the diversion, construction, use and maintenance of public right of way FP ABO24 to the south of the River Chelt under the new River Chelt Bridge | 5, 5d, 5f |
| 15/8c | New right of temporary access for the construction of a new West Cheltenham Link Road south of the A4019 (Tewkesbury Road) to join with the B4634 with footway and cycle track to the west and private access, signage and ducting, and new permanent rights to provide, protect, inspect, and maintain environmental and ecological mitigation New right for the construction, use, protection and maintenance of a new bridge over the River Chelt and associated environment mitigation New right for the diversion, construction, use and maintenance of public right of way FP ABO24 to the south of the River Chelt under the new River Chelt Bridge | 5, 5d, 5f |
| 15/8c(i) | New right of temporary access for the construction of a new West Cheltenham Link Road south of the A4019 (Tewkesbury Road) to join with the B4634 with footway and cycle track to the west and private access, signage and ducting, and new permanent rights to provide, protect, inspect, and maintain environmental and ecological mitigation New right for the use of land east of the new West Cheltenham Link Road as construction compound no. 7 | 5, 5g |
| 15/8c(ii) | New right of temporary access for the construction of a new West Cheltenham Link Road south of the A4019 (Tewkesbury Road) to join with the B4634 with footway and cycle track to the west and private access, signage and ducting, and new permanent rights to provide, protect, inspect, and maintain environmental and ecological mitigation New right for the use of land east of the new West Cheltenham Link Road as construction compound no. 7 New right for the diversion, use, protection, inspection and maintenance of gas main for the benefit of Wales & West Utilities Limited | 5, 5g, 35 |
| 15/8c(iii) | New right of temporary access for the construction of a new West Cheltenham Link Road south of the A4019 (Tewkesbury Road) to join with the B4634 with footway and cycle track to the west and private access, signage and ducting, and new permanent rights to provide, protect, inspect, and maintain environmental and ecological mitigation New right for the use of land east of the new West Cheltenham Link Road as construction compound no. 7 | 5, 5g |
| 15/8c(iv) | New right of temporary access for the construction of a new West Cheltenham Link Road south of the A4019 (Tewkesbury Road) to join with the B4634 with footway and cycle track to the west and private access, signage and ducting, and new permanent rights to provide, protect, inspect, and maintain environmental and ecological mitigation New right for the use of land east of the new West Cheltenham Link Road as construction compound no. 7 | 5, 5g |
| 15/8c(v) | New right of temporary access for the construction of a new West Cheltenham Link Road south of the A4019 (Tewkesbury Road) to join with the B4634 with footway and cycle track to the west and private access, signage and ducting, and new permanent rights to provide, protect, inspect, and maintain environmental and ecological mitigation New right for the construction of new or altered private means of access | 5, 5k |
| 15/8k | New right to construct, use, protect, inspect and maintain a flood compensation area | 6d |
| 15/8k(i) | New right to construct, use, protect, inspect and maintain a flood compensation area | 6d |
| 15/8l | New right for the diversion, use, protection, inspection and maintenance of 170 metres of gas main for the benefit of Wales & West Utilities Limited | 35 |
| 15/8m | New right for the use of land east of the new West Cheltenham Link Road as construction compound no. 7 New right for the diversion, use, protection, inspection and maintenance of gas main for the benefit of Wales & West Utilities Limited | 5g, 35 |
| 15/8n | New right for the use of land east of the new West Cheltenham Link Road as construction compound no. 7 New right for the diversion, use, protection, inspection and maintenance of gas main for the benefit of Wales & West Utilities Limited | 5g, 35 |
| 15/8p | New right for the use of land east of the new West Cheltenham Link Road as construction compound no. 7 New right for the diversion, use, protection, inspection and maintenance of gas main for the benefit of Wales & West Utilities Limited | 5g, 35 |
| 15/9a | New right to construct, use, protect, inspect and maintain a flood compensation area | 6d |
| 15/10a | New right to construct, use, protect, inspect and maintain a flood compensation area | 6d |
| 15/10d | New right of temporary access for the construction of a new West Cheltenham Link Road south of the A4019 (Tewkesbury Road) to join with the B4634 with footway and cycle track to the west and private access, signage and ducting, and new permanent rights to provide, protect, inspect, and maintain environmental and ecological mitigation | 5 |
| 15/10e | New right of temporary access for the construction of a new West Cheltenham Link Road south of the A4019 (Tewkesbury Road) to join with the B4634 with footway and cycle track to the west and private access, signage and ducting, and new permanent rights to provide, protect, inspect, and maintain environmental and ecological mitigation | 5 |
| 15/10e(i) | New right for the construction of a new West Cheltenham Link Road south of the A4019 (Tewkesbury Road) to join with the B4634 with footway and cycle track to the west and private access, signage and ducting, and new permanent rights to provide, protect, inspect, and maintain environmental and ecological mitigation. | 5 |
| 15/10e(ii) | New right of temporary access for the construction of a new West Cheltenham Link Road south of the A4019 (Tewkesbury Road) to join with the B4634 with footway and cycle track to the west and private access, signage and ducting, and new permanent rights to provide, protect, inspect, and maintain environmental and ecological mitigation | 5 |
| Land Plans – Sheets 16 and 16A | ||
| 16/1a(i) | New right to construct, use, protect, inspect and maintain a flood compensation area | 6d |
| 16/2a | New right to construct, use, protect, inspect and maintain a flood compensation area | 6d |
| 16/2b | New right to construct, use, protect, inspect and maintain a flood compensation area | 6d |
| 16/2c | New right to construct, use, protect, inspect and maintain a flood compensation area | 6d |
| 16/2d | New right to construct, use, protect, inspect and maintain a flood compensation area | 6d |
| 16/2e | New right to construct, use, protect, inspect and maintain a flood compensation area | 6d |
| 16/3a | New right to construct, use, protect, inspect and maintain a flood compensation area | 6d |
| 16/3c | New right of temporary access for the construction of a new West Cheltenham Link Road south of the A4019 (Tewkesbury Road) to join with the B4634 with footway and cycle track to the west and private access, signage and ducting, and new permanent rights to provide, protect, inspect, and maintain environmental and ecological mitigation | 5 |
| 16/3c(i) | New right of temporary access for the construction of a new West Cheltenham Link Road south of the A4019 (Tewkesbury Road) to join with the B4634 with footway and cycle track to the west and private access, signage and ducting, and new permanent rights to provide, protect, inspect, and maintain environmental and ecological mitigation | 5 |
| 16/3e | New right of temporary access for the construction of a new West Cheltenham Link Road south of the A4019 (Tewkesbury Road) to join with the B4634 with footway and cycle track to the west and private access, signage and ducting, and new permanent rights to provide, protect, inspect, and maintain environmental and ecological mitigation | 5 |
| 16/3e(i) | New right of temporary access for the construction of a new West Cheltenham Link Road south of the A4019 (Tewkesbury Road) to join with the B4634 with footway and cycle track to the west and private access, signage and ducting, and new permanent rights to provide, protect, inspect, and maintain environmental and ecological mitigation | 5 |
| 16/3e(ii) | New right of temporary access for the construction of a new West Cheltenham Link Road south of the A4019 (Tewkesbury Road) to join with the B4634 with footway and cycle track to the west and private access, signage and ducting, and new permanent rights to provide, protect, inspect, and maintain environmental and ecological mitigation | 5 |
| 16/3e(iii) | New right of temporary access for the construction of a new West Cheltenham Link Road south of the A4019 (Tewkesbury Road) to join with the B4634 with footway and cycle track to the west and private access, signage and ducting, and new permanent rights to provide, protect, inspect, and maintain environmental and ecological mitigation New right for working space for the realignment of the B4634 connecting to the new West Cheltenham Link Road with shared use path, private access, signage and ducting | 5, 6 |
| 16/3i | New right to construct, use, protect, inspect and maintain a flood compensation area | 6d |
| 16/3l | New right to construct, use, protect, inspect and maintain a flood compensation area | 6d |
| 16/3o | New right to construct, use, protect, inspect and maintain a flood compensation area | 6d |
| 16/4a | New right to construct, use, protect, inspect and maintain a flood compensation area | 6d |
| 16/4b | New right to construct, use, protect, inspect and maintain a flood compensation area | 6d |
| 16/4c | New right to construct, use, protect, inspect and maintain a flood compensation area | 6d |
| 16/4d | New right to construct, use, protect, inspect and maintain a flood compensation area | 6d |
| 16/5d | New right for working space for the realignment of the B4634 connecting to the new West Cheltenham Link Road with shared use path, private access, signage and ducting | 6 |
| 16/6b | New right for the construction of new or altered private means of access New right for the diversion, use, protection and maintenance of telecommunication cable and associated apparatus and equipment New right for the diversion, use, protection and maintenance of telecommunication cable and associated apparatus and equipment | 6c, 8, 34 |
| 16/6d | New right for the diversion, use, protection, inspection and maintenance of electric cable and associated apparatus and equipment for the benefit of National Grid Electricity Distribution plc | 25 |
| 16/8a | New right for the diversion, use, protection, inspection and maintenance of electric cable and associated apparatus and equipment for the benefit of National Grid Electricity Distribution plc | 25 |
| 16/10c | New right for the diversion, use, protection, inspection and maintenance of electric cable and associated apparatus and equipment for the benefit of National Grid Electricity Distribution plc | 26 |
Annotations
Commencement
- I1
Sch. 5 in force at 25.6.2025, see art. 1