Paragraph 34 F1
In this Part of this Schedule—
“alternative apparatus” means alternative apparatus adequate to enable EPN to fulfil its statutory functions in a manner no less efficient than previously;
“apparatus” means electric lines and electrical plant (as defined in section 64(1) of the Electricity Act 1989), belonging to or maintained by EPN;
“EPN” means Eastern Power Networks plc (company number 02366906) whose registered office is at Newington House, 237 Southwark Bridge Road, London SE1 6NP;
“functions” includes powers and duties;
“in” in a context referring to apparatus or alternative apparatus in land includes a reference to apparatus or alternative apparatus under, over or upon land;
“plan” or “plans” include all designs, drawings, specifications, method statements, soil reports, programmes, calculations, risk assessments and other documents that are reasonably necessary properly and sufficiently to describe the works to be executed; and
“specified works” means any of the authorised development which—
- (a)
will or may be situated within 15 metres measured in any direction of any apparatus the removal of which has not been required by the undertaker under sub-paragraph 39(2) or otherwise; or
- (b)
may in any way adversely affect any apparatus the removal of which has not been required by the undertaker under sub-paragraph 39(2) or otherwise.
- (a)